Resolved
- That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plans: 1200 010 Revision E & 1200 012 Revision J. Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 03 All new work to the outside of the building must match existing original work in terms of the choice of materials, method of construction and finished appearance. This applies unless differences are shown on the drawings hereby approved or are required by conditions to this permission. Reason: In the interests of visual amenity and to ensure that the appearance of the building makes a positive contribution to the character and appearance of the area. This is as set out in the National Planning Policy Framework (NPPF), Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) policy DM1, and the advice contained in the Design and Townscape Guide (2009). 04 Prior to first use of the balcony shown on the plans hereby approved obscure glazed privacy screens shall be installed to the north and south sides of the balcony at a height of 1.7 metres above the balcony finished floor level in accordance with details that have previously been submitted to the local planning authority and approved in writing and these screens shall be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy). The screens shall be permanently retained thereafter. Reason: To protect the privacy and environment of people in neighbouring residential properties, Core Strategy (2007) policy CP4, Development Management Document (2015) policy DM1 and the advice contained in the Design and Townscape Guide (2009). 05 Notwithstanding the details shown on the drawings submitted and otherwise hereby approved within 4 months of the date of his decision details of a scheme requiring the new second floor north-facing rooflight window to be fitted with obscured glazing (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy) and that no part of that window which is less ... view the full minutes text for item 415.