Resolved
- That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years of the date of this decision Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development hereby permitted shall be carried out in accordance with the following approved plans 001.01, 200.12, 201.07, 202.11, 203.11, 204.14, 205.08, 206.09, 210.02, 211.02 Reason: To ensure that the development is carried out in accordance with the Development Plan. 03 No development approved by this permission shall be commenced unless and until the Local Planning Authority has approved in writing by way of a Section 278 Highways Agreement a full scheme of highway works (including detailed designs and contract details) and the relevant highways approvals are in place, in relation to the proposed loading bay, alterations to the existing accesses including reinstatement of redundant crossovers on Broadway, amended traffic regulation order, planting specifications and details of 4 new street trees and details of the 5 new visitor cycle hoops. The works shall thereafter be undertaken in accordance with the approved details and completed prior to occupation of the development hereby approved. Reason: A pre commencement condition is required in the interests of highways management, the character of the area and safety in accordance with Core Strategy (2007) policies KP2, CP3 and CP4 and Development Management Document (2015) policies DM1, DM3 and DM15 and the advice contained within the Southend Design and Townscape Guide (2009). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until full product details of the materials to be used on all the external elevations, including walls, inset balconies and projecting windows, roof and roof terraces, coping, windows and doors, shopfront, colonnade, fascia and soffits, balcony balustrades and screens, bin and cycle store doors, entrance gates, rainwater goods and boundaries have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details before it is brought into first use. Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2019) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 05 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition above slab level shall take place unless and until full detailed design ... view the full minutes text for item 785.