Resolved
- That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 The development hereby permitted shall be retained in complete accordance with the plans approved under planning application 11/00790/BC3M: Location Plan 010A, Proposed Layout and Elevations of Substation and Bin Store 115, Proposed Sections C-C/D-D 111G, Proposed Sections A-A/B-B 110J, Roof Plan D102K, Proposed First, Second and Third Floor 101Q, Proposed Lower Ground and Ground Floor 100P, Existing Site Section C-C/D-D 021A, Existing Site Section A-A/B-B 020 A, Landscaping Plan 013, Proposed Site Plan 012, Existing Site Plan 011 A, Proposed Elevations G-G/H-H 114B, Proposed Elevation E-E/F-F 113N. Reason: To ensure the development is carried out in accordance with the development plan. 02 Waste management at the site shall be carried out in accordance with the strategy submitted and approved under application 13/01233/FUL. Reason: To protect the environment and ensure adequate and appropriate storage, recycling and collection of waste resulting from the development in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policies DM1, DM3, DM8 and DM15, and the advice contained within the National Design Guide (2019), the Design and Townscape Guide (2009) and the Waste Storage, Collection and Management Guide for New Developments (2019). 03 Servicing shall take place in accordance with the strategy submitted and approved under application 13/01233/FUL. Reason: To ensure that the development does not have a detrimental impact on the surrounding highway network in accordance with the National Planning Policy Framework, Policy CP3 of the Core Strategy (2007) and Policies DM3 and DM15 of Development Management Document (2015). 04 The scheme of public art installed on site must be permanently retained on this site and not moved or removed. Reason: To secure the provision of public art and in the interests of visual amenity in accordance with Policies KP2 and CP4 of the Core Strategy (2007), and the advice contained in the Design and Townscape Guide (2009). 05 The environmental sustainability measures as installed on site must be permanently retained. Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2019) and the Design and Townscape Guide (2009). 06 Other than the external lighting approved under application 13/01014/AD, no additional external lighting shall be installed within any part of the site without express planning permission having first been obtained from the Local Planning Authority. Reason: In the interest of the residential amenity of nearby ... view the full minutes text for item 959.