Resolved
- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development hereby permitted shall be carried out in accordance with the following approved 668P101B, 668P102, 668P103A, 668P104A. Reason: To ensure that the development is carried out in accordance with the Development Plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until full product details of the materials to be used on all the external elevations, including walls including decorative elements, roof, windows and doors, fascia and soffits, rainwater goods and boundaries have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details before it is brought into first use. Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2021) Core Strategy (2007) policies KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works above ground floor slab level shall take place unless and until full detailed design drawings and cross sections of the decorative elements of the front elevation including porch, brick decoration, reveals and eaves detailing at a scale of 1:20 or 1:10 as appropriate have first been submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details before it is brought into use. Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2021) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 05 The proposed first floor windows in the north and south flank elevations of the development hereby approved shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy) and fixed shut, except for any top hung fan light which shall be a minimum of 1.7 metres above internal finished floor level of the room they serve. In the case of multiple or double-glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4 on the Pilkington scale. Reason: To ensure the development has an acceptable ... view the full minutes text for item 385.