Resolved
GRANT PLANNING PERMISSION subject to the following conditions: 01 The development hereby permitted shall begin not later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development hereby permitted shall be carried out solely in accordance with the following approved plans NEO.1166.0100 (Existing Site Plan), NEO.1166.0101 (Existing Ground Floor Plan), NEO.1166.0102 (Existing First Floor Plan), NEO.1166.0103 (Existing Second Floor Plan), NEO.1166.0104 (Existing Roof Plan), NEO.1166.0105 (Existing Elevations), NEO.1166.0125.C (Proposed Site and Location Plan), NEO.1166.0126.C (Proposed Ground Floor Plan), NEO.1166.0127.D (Proposed First Floor Plan), NEO.1166.0128.E (Proposed Second Floor Plan), NEO.1166.0129A (Proposed Third Floor Plan), NEO.1166.0130 (Proposed Roof Plan), NEO.1166.0131.B (Proposed Elevations), NEO.1166.0132.A (Proposed Details). Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until full product details of the materials to be used on all the external elevations, including walls (infilling and new and gable decoration and including colours), balconies including balustrade, supporting column, fascia and floors and dormers, windows including glazing, roof and roof terraces including coping/edge, fascia and soffits, rainwater goods and boundaries have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details before it is brought into first use. Reason: To safeguard the visual amenities of the building and wider conservation area, in accordance with the National Planning Policy Framework (2021) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policies DM1 and DM5 and advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until full design details for all new doors (main entrance and French doors), any replacement dormers, eaves and balcony details for the proposed extension at a scale of 1:20 or 1:10 as appropriate have first been submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out and completed in accordance with the approved details before it is brought into use. The detailed designs for the other historic features to be reinstated including the lantern, roof terrace, balustrade extension and windows shall be carried out in full accordance with plan reference NEO.1166.0132.A (Proposed Details). Reason: To ensure the development suitably ... view the full minutes text for item 164.