- That ENFORCEMENT ACTION be AUTHORISED to secure the following: (a) the removal of the three (3) poles and antennae attached to the north flank wall of the building; and (b) the removal of the two (2) poles and antennae attached to the rear elevation of the building; and (c) the removal of the two free-standing poles and antennae from the rear part of the site; and (d) the removal from site all materials and debris resulting from compliance with requirement (a), (b) and (c) above. The authorised enforcement action to include (if/as necessary) the service of an Enforcement Notice under Section 172 of the Act and the pursuance of proceedings whether by prosecution or injunction to secure compliance with the requirements of the Enforcement Notice. Whilst proceedings could be brought in isolation against the sole remaining antenna at the site subject of the 2014 enforcement notice, it is considered that it would be sensible for any prosecution in that regard to take account of the enforcement action against the wider collection of antennae now on site including whether compliance is achieved through those means. When serving an Enforcement Notice the Local Planning Authority must ensure a reasonable time for compliance. In this case a compliance period of 28 days is considered reasonable for the above works.
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
Breach of Planning Control: Without planning permission, the installation of radio antennae to the property.
Address: 79 The Drakes, Shoeburyness, Essex, SS3 9NY
Case opened: 24 January 2020
Case Officer: Mark Broad
Recommendation: AUTHORISE ENFORCEMENT ACTION 1 Site and Surroundings
1.1The property is a dwelling forming part of a low rise, high density residential development comprising terraced houses and flats located to the west of Eagle Way. No. 79 lies to the southern end of The Drakes and has an archway below which provides access to a parking court at the rear. No site-specific planning policy designations affect the site.
2 Lawful Planning Use
2.1The lawful planning use is as a dwelling within Class C3 of the Town and Country Planning (Use Class Order) 1987 (as amended).
3 Relevant Planning History
3.1The most relevant planning history for the determination of this case is shown on Table 1 below:
Table 1: Relevant Planning History of the Application Site
Reference Description Outcome [Date] 02/00611/FUL Retain existing amateur radio aerial Refused (Retrospective) [24 July 2002]
Reasons for refusal. The masts appear intrusive, alien and out of character in this area of high-density residential development and detract from the appearance of the building on which they are situated. They are therefore detrimental to the visual and residential amenities of the area, particularly insofar as the properties to the rear in Heron Close are concerned, and the development is therefore contrary to Policies H5 and C11 of the Borough Local Plan. 14/00178/UNAU_B Enforcement case for radio antennae Enforcement Notice issued 12.11.2014 Historic enforcement case from 2002 No Further Action (2005)
4 Planning Policy Summary
4.1The National Planning Policy Framework (NPPF) (2021)
4.2Planning Practice Guidance (PPG) – National Design Guide (NDG) (2021)
4.4Development Management Document (2015): Policies DM1 (Design Quality), DM3 (Efficient and Effective Use of Land)
4.5Southend-on-Sea Design and Townscape Guide (2009)
5 The alleged planning breach, harm caused and efforts to resolve breach to date 5.1 The identified breach of planning control is:
Without planning permission, the installation of seven antennae on site; two free- standing circular antennae, three mounted to the side elevation of the building and two to its rear elevation.
5.2In January 2020 a complaint was received by the Council alleging radio antennae having been installed at the property without planning permission.
5.3The property has also been subject to earlier enforcement investigations in 2002 and 2014. In both instances enforcement notices were issued. In more detail for the case under reference 14/00178/UNAU-B the enforcement notice served in December 2014 required the following;
Remove the 3 unauthorised developments as follows:
a. The large antenna located towards the centre of the building (to the rear) which requires supporting cables. b. The pole with devices attached located to the front of the property and attached to the wall adjacent to the ridge of the oriel window. c. The antenna located towards the rear, south easterly corner of the building.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.