22/01602/RES - Land Between Barge Pier Road and Ness Road, Shoeburyness (Shoeburyness Ward)

Approved Planning 6 papers

Development Control Committee approved this item on Wednesday 30 November 2022. Below is the council's own wording, with the papers it was decided on.

Item525

Resolved

- (a) That the RESERVED MATTERS be APPROVED, subject to the following conditions: 01 The development hereby permitted shall be carried out in accordance with the following approved plans: BA9923-SK011-02 (Site Location Plan), 2105160-140-P3 (Earthworks Surcharge Strategy Plan), 2105160-141-P1, 2105160-142-P1, 2105160-143-P3 (Cut and Fill Sections), 2105160-131-P2, 105160-130-P2, 2105160-132-P2 (Earthworks Surcharge Drainage Strategy Plans) and in full accordance with Preliminary Land Raising Strategy IDOM reference PLRSR-22438-22-101-Rev C dated 09.08.22. Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 02 Prior to the commencement of the development hereby approved, details of a survey of the existing eastern drainage ditch as shown on plan reference BA9923-SK011-02 and a strategy for any ditch maintenance works required to ensure that this drainage ditch is suitable for the intended temporary drainage works associated with the development hereby approved whilst also maintaining the ecology mitigation measures and required enhancement measures approved under, and secured by conditions 13, 14, 15, 16 and 17 of, planning permission 20/01227/OUTM shall be submitted to and agreed in writing by the Local Planning Authority. The approved works shall then be carried out and completed in full accordance with the approved details. Reason: This pre-commencement condition is required to ensure the approved development does not increase flood risk elsewhere or harm ecology in accordance with National Planning Policy Framework (2021), Core Strategy (2007) Policies KP1, KP2, KP3 and CP4 and Development Management Document (2015) Policies DM6 and DM14. 03 The works to create the raised development platforms hereby approved shall be carried out and completed in full accordance with the timescales set out in section 3 of the Construction Management Plan (CMP) Rev C by Bellway dated 07.11.22 or any other timetable that has previously been submitted to and agreed in writing with the Local Planning Authority under the terms of this planning condition. In addition, notwithstanding the contents of the CMP approved under condition 09 of planning permission 20/01227/OUTM for the construction of the raised development platforms, prior to the commencement of the development subject of this permission, a strategy for lorry movements to and from the development site through the City, including a means for the monitoring of the adherence ... view the full minutes text for item 525.
Word for word from the decision Southend-on-Sea published for this meeting. Source: democracy.southend.gov.uk

Follow this further

Built from Southend-on-Sea's papers

What the report saysPro

Report to Development Control Committee

2.4m 146

55 22a

St And 1 to 2 14

rews C 7

ottage Stone

WESTW a to f

Eagle 65

Club 22 Metho dis

South Shoebury Hall St And t Church

2 ST AND SE rew's

AY Rd

Mill Lodge

1 59

Shoebury

CLO

25 House

REWS 2.7m 3

18 4

20 57 NE SS RO AD STOU Wa R CLO rd B 2 dy SE CR 12 10 8

12 2 140 22

10 13 32 32

Cambridge Town 1

3.4m LINTO N ROA

LB D 42

ST AN 128 11 15

SEAVIE CR

FW 21

4.9m

DREW 4.3m

W RO 'S ROA

AD Stone 122

D

1 and th 135

e Engl of St G NES SR

Hall OAD

ish Mar eorge 112

tyrs

Club Conservative 98 100

Presby 4.9m 96

FB

tery Drain

FB 88 Gunners Park

Cottage CF

Well 131

Pond

Stone

Shelter Drain

CW 115

ES Trees TUARY ME 117a 117 119 109 125 119a

WS 107

GR LK PCs

WA Ward

PCs Bdy

OV 1

E 2

Maplin Mews CF El

3 Su bS ta 1

2.7m Drain

Und Drain

Telephone Exchange

Amb Sta

Health Centre Skatepark Skatepark

Def

Drain

Drain Drain

War Memorial Play Area Sports Court

El Sub Sta Gas Gov

Trees [name removed] ain 1.5m

CA MP FIE D L Car Park

NEW

RO GAR RISO N RO

AD AD

Dr ain

3.7m Hinguar Primary School Drain 3.0m

West Gate Ppg Sta ESS

4.3m 2 NEW Pond

GAR 1

RISO N RO

WE ST AD

GA TE 7

42 35

1 101

3 9 11 15

104 7 25

4.0m 93

22 37

Dr 19

ai MAGAZ

n ASH ES R OAD 21

11 27 RO

17 INAD

15 9 E

13 Gunners House

12 53

31 Posts

21 1

118 Phase 2 GUNNERS Area of proposed development 55

81 41 RISE 8 6 3 1 12 BOU NORTH

NDA 0 10 20 30 40 50m RY W 47 2

51 90 AY Site Boundary

126 1 57 SCALE 61 12 59 84 8

The contractor is responsible for checking dimensions, tolerances and references. Any discrepancy to be verified with the Architect before Where products have been specified, PRP have reviewed applicable products available in the UK at the time of writing the specification. For the avoidance of doubt, product manufacturers and suppliers must confirm that each product is fit for its intended use and provide such evidence as may CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in Rev Date 01 09.08.22 Description First Issue Dwn Ckd JDC IBB Drawn JDC The Garrisson, Shoeburyness BA9923-SK017 proceeding with the works. Where an item is covered by drawings to reasonably be requested to confirm performance, including, but not limited to, product test classification and interfaces with adjacent products. conjunction with the Designer's Hazard and Checked IBB prp-co.uk 01 different scales the larger scale drawing is to be worked to. Where the contractor wishes to propose alternative products, representative samples and a full technical appraisal should be submitted by the Environment Assessment Record Date DATE Phasing Plan London Do not scale drawing. Figured dimensions to be worked to in all cases. contractor to the employer demonstrating that their proposed alternative has equal or better performance. Any alternative products are subject to design All intellectual property rights reserved. 020 7653 1200 team, building control, warranty provider and employer acceptance. Scale @ A1 1:1000 Phase 2 Development Area Comment

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
01 Barge Pier Location planPlan 665 KB Download
PDF
02 barge pier development area planReport 217 KB DownloadRead as text
PDF
03 Barge Pier homezone phasing planReport 220 KB Download
PDF
04 Barge pier existing and proposed and surcharge levelsReport 3.5 MB Download
PDF
05 barge pier surcharge diagramReport 98 KB Download
PDF
22/01602/RES: Land Between Barge Pier Road and Ness Road, Shoeburyness (Shoeburyness Ward)Report 808 KB Download

At this meeting

Whole meeting

Who was there

17 of 24 attended
NW
Councillor Nick WardChair, present
MB
Councillor Margaret BortonVice-Chair, present
MB
Councillor Martin BerryCommittee Member, present
KB
Councillor Kevin BuckCommittee Member, present
AD
Councillor Alan DearCommittee Member, present
MD
Councillor Matt DentCommittee Member, present
FE
Councillor Fay EvansCommittee Member, present
DG
Councillor David GarstonCommittee Member, present
SH
Councillor Stephen HabermelCommittee Member, present
DJ
Councillor Derek JarvisCommittee Member, present
AJ
Councillor Anne JonesCommittee Member, present
CM
Councillor Carole MulroneyCommittee Member, present

All 24 on the meeting page

On this subject at Southend-on-Sea

Search all
  1. 22/01602/RES - Land Between Barge Pier Road and Ness Road, Shoeburyness (Shoeburyness Ward)This decision
  2. 24/00450/RESM - Land At Fossetts Farm, Sutton Road Southend-on-Sea (St Luke's Ward)Approved
  3. 24/00311/RESM - Land Between Barge Pier Road and Ness Road, Shoeburyness (Shoeburyness Ward)Approved
  4. 18/01963/FULM - Development Land at Priory Crescent (St Laurence Ward)Approved
  5. 18/00952/FULM - Development Land at Priory Crescent, Southend-on-Sea (St Laurence Ward)Approved

More from Southend-on-Sea Development Control Committee

All decisions
MeetingDecisionOutcome
30 Apr 2025 Minutes of the Meeting held on Wednesday, 2nd April, 2025- That the Minutes of the Meeting held on Wednesday 2 nd April 2025 be confirmed as a correct record and signed. Decided Open
30 Apr 2025 25/00280/AMDT - Garages at Eagle Way, Shoeburyness (Shoeburyness Ward)That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 The development hereby being amended shal... Approved Open
30 Apr 2025 25/00167/FUL - 18 Brightwell Avenue, Westcliff-on-Sea (Westborough Ward)- That PLANNNG PERMISSION be REFUSED for the following reason: 01 The proposed development would result in room 3 bei... Refused Open
30 Apr 2025 25/00358/FUL - 19 Blatches Chase, Eastwood (Blenheim Park Ward)- That PLANNING PERMISSION be REFUSED for the following reasons: 01 The development introduces types and levels of no... Refused Open
30 Apr 2025 TPO 5/2024 - Land Between 89 - 91 Alexandra Road, Southend-on-Sea (Milton Ward)- That Tree Preservation Order 05/2024 be confirmed. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies