CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Southend-on-Sea Borough Council
Development Control Committee, Wednesday 18 October 2023 at 2.00pm

23/01216/BC4 - Cliffs Pavilion Station Road, Westcliff on Sea (Milton Ward)

Approved Planning 6 papers

Development Control Committee approved this item on Wednesday 18 October 2023. Below is the council's own wording, with the papers it was decided on.

Item53

Resolved

- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin no later than three years of the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plans CLIF-AL3-ZZ-00-DR-M-010001 Rev T02, CLIF-AL3-ZZ-00-DR-A-010003 Rev T02, CLIF-AL3-ZZ-00-DR-A-020002 Rev T02, CLIF-AL3-ZZ-01-DR-A-010004 Rev P01, CLIF-AL3-ZZ-01-DR-A-020003 Rev P01, CLIF-AL3-ZZ-B1-DR-A-010002 Rev T02, CLIF-AL3-ZZ-B1-DR-A-020001 Rev T02, CLIF-AL3-ZZ-RF-DR-A-010005 Rev P01, CLIF-AL3-ZZ-RF-DR-A-020004 Rev P01, CLIF-AL3-ZZ-ZZ-DR-A-090001 Rev P01, CLIF-AL3-ZZ-ZZ-DR-A-090002 Rev P01, CLIF-AL3-V2-00-DR-A-030008, CLIF-AL3-ZZ-ZZ-DR-A-050003 Rev T02, CLIF-AL3-ZZ-ZZ-DR-A-050004 Rev T02, CLIF-AL3-ZZ-ZZ-DR-A-050005 Rev T02, CLIF-AL3-ZZ-ZZ-DR-A-050006 Rev T02, CLIF-AL3-ZZ-00-DR-A-020002 Rev T02. Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until full product details of the materials to be used on all the external elevations of the approved development, including walls, roof and coping, solar shading, windows and doors, entrance canopy and signage, rainwater goods, vents and plant enclosure and any amended finishes to the existing building have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The development shall be carried out in full accordance with the approved details before it is brought into first use. Reason: To safeguard the visual amenities of the area including the setting of the adjacent Shorefields Conservation Area, in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM5, Policies CS1 and DS3 of the Southend Central Area Action Plan (2018), and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009) and the Shorefields Conservation Area Appraisal (2021). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition above ground floor slab level shall take place unless and until full detailed design drawings and cross sections of the following key features at a scale of 1:20 or 1:10 as appropriate have first been submitted to and agreed in writing by the Local Planning Authority under the terms of this condition: i. All new signage structures to be affixed to the building including poster cases. ii. Details of sun shading including integrated drainage solution and any alterations to the existing curved canopy. iii. Details of parapet roof edge and roof plant enclosure. iv. Details of window reveals and glazed infill panelling arrangement. The development shall be carried ... view the full minutes text for item 53.
Word for word from the decision Southend-on-Sea published for this meeting. Source: democracy.southend.gov.uk

Follow this further

Built from Southend-on-Sea's papers

What the report saysPro

Report to Development Control Committee

General notes or an other p rpose other than plannin ontra tors s ppliers et m st not s ale dimensions rom this drawin in do t ask ll dimensions sho ld e he ked on site

his drawin is to e read in on n tion with all rele ant other drawin s detailed spe i i ations n ineer s drawin s

AD detail sheets and al lations ss mptions ha e een made on some

N RO o the detail to e istin a ri n dis repan ies or di eren es to e

MILTO 15 4 reported a k the main ontra tor pon openin p

Materials and workmanship

12 14 n ildin work to e arried o t with proper materials and in a workmanlike manner in a ordan e with re lation

10 11 o the ildin e lations he ilder ma show omplian e with re lation SP in a n m er o wa s in l din the

9 0m appropriate se o a prod t earin 7 20 markin in a ordan e with the 58

7 onstr tion rod ts ire ti e as amended the 00m Markin ire ti e or a 53 prod t ompl in with an appropriate

AD 18 SL

N RO te hni al spe i i ation as de ined in

E MILTO 15 4

NU those ire ti es a ritish tandard or an alternati e national te hni al

E 20

AV 12 14 spe i i ation o an state whi h is a

ITY ontra tin part to the ropean

10 11

IN SP onomi rea whi h in se is

TR e i alent or a prod t o ered a

7 national or ropean erti i ate iss ed

1b a ropean e hni al ppro al

UE

2 N VE 20 y iss in od and the onditions o se

YA rle

T INI te es are in a ordan e with the terms o the

TR W

1b erti i ate

1a 2 r ley te es W

1a y area in l ded or allowan e towards new he ron parkin er rg SL 7 Su 26 ry ge markin s 10 r SL 7 Su E ENU UE SL EN AV 26 F AV

ON NT WI ll TCLIF

Ha 27

19 on int

10 AP

AP 27 PR

PR WES

W OX

OX LB .5 m 26

UE e 4 us Ho 28.7m

at co

UE All 2

VEN m ha SL N 8

VE ing 28 n dr Sa A 2a 22

N

A AD

O NT D RO

I

F 2b

29 W ll

F FOR

Ha

TCLI LYD 13

30 N

19 on int 50 52 18

AP

AP 27 3

PR

PR WES W

OX

OX 14

9 lte r 32 LB .5 m 26 17 11 he i on S s vil 1

liff 15 E

s Pa ght ENU

se 19 He i C e ou 4 Th V ON A

28.7m rt tH ou oa MILT

C ilto n lc Al 1

2 M r e lte Sh m ha 3 8 4

m .2 23 n g ri 28 5

nd 1 to 9 D

Sa ROA MAIN

TION DRESSING ROOMS / OFFICES / BOH ENTRANCE

ST A Site Manager

2a 22 58 71 00

LOADING E

ion 34 AREA vil

D Pa i ffs

ROA Ticket Cl 42 STAGE Entrance Office Corridor

2b m cleaners

.3 18 Band Room Pon d

D Dis. WC shop store

29 WC shop

FOR e AUDITORIUM Th ge RADE

LOBBY tta Director's

Co Room O PA

LYD 1

13 30 REM

Dis. WC control room SAN

.5 m MALE 50N 16 WC 52 MAIN BAR & CAFE 18

3m k 4. ar

3 DE rP NA Ca LA

14 SP NE ER ST WE 9 r lte 32 11 e ion 17 Sh nry

vil ts s

1 iff aso 15

E gm pin 5

Slo a l

NU 19 17

P e igh C e

AVE H 6

1 to 8 an sio ns Th

TON M o t ur m 5 Re n

Co Sa y nry 7a

Wa aso

MIL cle gm Cy pin n ilto Slo

1 r ate

ean H igh W M er M 0 m 4.

elt S 1 EN RD GA m Sh 00 D I EL EF 3 72 OR nry SH ma so g

4 pin Slo m .2 23 Layer 05-01 finishes plan hatch

5 1 to 9 D ROA MAIN

ION PC DRESSING ROOMS / OFFICES / BOH ENTRANCE TAT n ry Site aso S Manager gm pin Slo

58 71 0 m 4.

00 LOADING

E ion er elt 34 AREA Sh il av elt e r iff sP Ticket m Cl Sh 42 00 STAGE Office Entrance Corridor 71 58 m cleaners

.3 18 Pon Band Room

Key -ULS Reactions First Floor Columns

Col 'xx' Existing columns under (Ground to first) from 1930's construction ('xx' reference to archive drawings)

Col 'xx' Existing columns under (Ground to first) from 1960's construction ('xx' reference to archive drawings) Dis. WC shop store d Col 'xx' Existing columns over and under (Ground M = Moment Connections (kNm) to second) from 1960's construction V = Shear (kN) ('xx' reference to archive drawings)

Residual Hazards Identified Col 'xx' Existing columns over (First to second) Superstructure Legend (Over) from 1960's construction Item Description Denotes steelwork to be ('xx' reference to archive drawings) (G) 1! Blockwork to not exceed 20kg per unit galvanised

Denotes structure at first floor subject to discussions. Allow for WC shop timber joists T.B.C

Denotes span direction D100 Roof deck by Tata steel Column Schedule Column Ref. Size (mm) C1 CHS139.7x6.3 C2 CHS193.7x16 C3 UC203x203x46

Beam Schedule Beam Ref. Size (mm) B1 PFC150x90x24 B4 UB254x146x43 B5 PFC200x90x30 B6 UC152x152x37

Cross Bracing Schedule CB Ref. Size (mm)

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
01 Site and Loc 231003Report 1.4 MB DownloadRead as text
PDF
02 EX Lower Ground Floor Plan 231003Report 1.4 MB Download
PDF
03 EX Ground Floor Plan 231003Report 1.2 MB Download
PDF
04 existing first floor planReport 884 KB Download
PDF
05 existing east and west elevationReport 671 KB Download
PDF
23/01216/BC4: Cliffs Pavilion Station Road, Westcliff on Sea (Milton Ward)Report 447 KB Download

At this meeting

Whole meeting

Who was there

17 of 25 attended
NW
Councillor Nick WardChair, present
FE
Councillor Fay EvansVice-Chair, present
BB
Councillor Brian BeggsCommittee Member, apologies, sent representative
MB
Councillor Martin BerryCommittee Member, present
MB
Councillor Margaret BortonCommittee Member, present
SB
Councillor Steve BuckleyCommittee Member, present
CC
Councillor Colin CampbellCommittee Member, present as substitute
DC
Councillor Daniel CowanCommittee Member, present as substitute
AD
Councillor Alan DearCommittee Member, present
MD
Councillor Matt DentCommittee Member, present
NF
Councillor Nigel FolkardCommittee Member, present
JH
Councillor John HarlandCommittee Member, present

All 25 on the meeting page

On this subject at Southend-on-Sea

Search all
  1. 23/01216/BC4 - Cliffs Pavilion Station Road, Westcliff on Sea (Milton Ward)This decision
  2. 21/01314/BC4 - Cliffs Pavilion, Station Road, Westcliff on Sea (Milton Ward)Approved
  3. Objections to Traffic Regulation Orders - Thorpe Esplanade Charging for Parking and Cliffs Pavilion Car Parking Management SchemeNoted
  4. Objections to Traffic Regulation Orders - Thorpe Esplanade Charging for Parking and Cliffs Pavilion Car Parking Management SchemeApproved
  5. Objections to Traffic Regulation Orders - Thorpe Esplanade and Cliffs Pavilion Parking Management Scheme AmendmentApproved
  6. Extension of Cliffs Pavilion Permit Parking AreaApproved

More from Southend-on-Sea Development Control Committee

All decisions
MeetingDecisionOutcome
30 Apr 2025 Minutes of the Meeting held on Wednesday, 2nd April, 2025- That the Minutes of the Meeting held on Wednesday 2 nd April 2025 be confirmed as a correct record and signed. Decided Open
30 Apr 2025 25/00280/AMDT - Garages at Eagle Way, Shoeburyness (Shoeburyness Ward)That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 The development hereby being amended shal... Approved Open
30 Apr 2025 25/00167/FUL - 18 Brightwell Avenue, Westcliff-on-Sea (Westborough Ward)- That PLANNNG PERMISSION be REFUSED for the following reason: 01 The proposed development would result in room 3 bei... Refused Open
30 Apr 2025 25/00358/FUL - 19 Blatches Chase, Eastwood (Blenheim Park Ward)- That PLANNING PERMISSION be REFUSED for the following reasons: 01 The development introduces types and levels of no... Refused Open
30 Apr 2025 TPO 5/2024 - Land Between 89 - 91 Alexandra Road, Southend-on-Sea (Milton Ward)- That Tree Preservation Order 05/2024 be confirmed. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies