Resolved
- That ENFORCEMENT ACTION be AUTHORISED to secure the following: (a) remove from the site the hardstanding, steps and boundary walls in their entirety; AND (b) the restoration of the land to its condition before the breach took place including by raising the ground levels, replacing the hard surface with soft landscaping, creating access steps and erecting retaining boundary walls as shown on the existing layout and site section details shown on drawing No P10 for planning application 22/02234/FUL; AND (c) remove from site all materials resulting from compliance with both (a) and (b) above. The authorised enforcement action to include (if/as necessary) the service of an Enforcement Notice under Section 172 of the Act with time for compliance six (6) months and the pursuance of proceedings whether by prosecution or injunction to secure compliance with the requirements of the Enforcement Notice.