Traffic Regulations Working Party approved this item on Wednesday 17 January 2024. Below is the council's own wording, with the papers it was decided on.
- That Cabinet Committee be recommended that the proposals, set out below be approved in their entirety and that the Executive Director (Environment and Place) be authorised to make an Experimental Traffic Regulation Order and undertake the necessary installation and construction works required to implement the scheme: • Make an Experimental Traffic Regulation Order changing lane 1 of the eastbound approach to left turn only; • Install Greenwich WandOrca between lane 1 and lane 2 on the eastbound approach to the junction; • Install additional ‘wicket’ type signs on the eastbound approach to the junction; • On the eastbound carriageway install a temporary kerb line in lane 1 to the west of the junction and extend the existing traffic island on Rayleigh Road; and • Extend the existing central island on the right turn lane into Bridgwater Drive.
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
1.1The purpose of this report is to inform the Traffic Regulations Working Party and Cabinet Committee of the request from ward councillors received in June 2023 supporting making amendments to the A127 Kent Elms junction.
1.2The request is that lane 1 of the eastbound A127 carriageway is made into a left turn only lane (see Plan attached at Appendix 1).
1.3The recommendation is to proceed with construction of the proposals.
Recommendations
It is recommended that Cabinet Committee:
2.1Agree to the proposals, set out at paragraph 3.6 below, in their entirety and give authority to proceed with the issue of an Experimental Traffic Regulation Order and the installation and construction works required.
Background
3.1In 2017 works to improve the A127 Kent Elms junction were completed. Works consisted of adding an additional lane to both the east and westbound carriageways to provide improved capacity through the junction.
3.2The scheme also included the removal of a non-Equalities Act 2010 compliant footbridge and the construction of a compliant footbridge.
3.3To the north of the A127 a shared use cycleway was introduced to improve pedestrian and cycle movements through the junction. 3.4. Since the completion of the scheme the length of the merge lane has been questioned. In 2023, a request was received by the ward councillors that the Council make amendments to the junction as it was perceived that the merge lane on the eastbound carriageway was creating a risk of collisions.
3.5In addition, a number of vehicles have been observed by officers contravening the no ‘U-turn’ traffic order from the A127 eastbound to westbound carriageways at the Kent Elms junction.
3.6It is proposed to undertake the following action, installations and works to the eastbound carriageway:
• Make an Experimental Traffic Regulation Order changing lane 1 of the eastbound approach to left turn only. • Install Greenwich WandOrca between lane 1 and lane 2 on the eastbound approach to the junction. • Install additional ‘wicket’ type signs on the eastbound approach to the junction. • On the eastbound carriageway install a temporary kerb line in lane 1 to the west of the junction and extend the existing traffic island on Rayleigh Road. • Extend the existing central island on the right turn lane into Bridgwater Drive.
4. Reasons for Decisions
4.1Introducing a left turn only traffic order in lane 1 will result in only 2 lanes proceeding through the junction therefore removing the merge section.
4.2Installing 54m of Greenwich WandOrca (vertical ‘wands’ with reflective markings) between lanes 1 & 2 on the approach to the junction will prevent motorists from changing lane in close proximity of the junction reducing the risk of collisions.
4.3The installation of ‘wicket’ style signs on the near side verge and central reserve will give motorists advance warning of the change to the road layout.
4.4Installation of temporary kerbing on the Rayleigh Road traffic island and in lane 1 to the west off the junction will prevent motorists from proceeding ahead to support compliance with the experimental left turn only traffic order.
4.5Extending the central island at the right turn lane into Bridgwater Drive will make it more difficult to make illegal movements and increase compliance.
5. Other Options
5.1‘Do nothing’ and retain the existing arrangement. 6. Financial Implications
6.1The cost of the works will be covered by the 2023/24 capital budget for minor road safety schemes. The cost of completing the works is estimated at £150k.
Legal implications
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Traffic Regulations Working Party at Southend-on-Sea and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.