Resolved
- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin no later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby approved shall be carried out in accordance with the approved plans: 384/R04/E, 384/R03/H, 384/R02/A, 384/R01/C. Reason: To ensure the development is carried out in accordance with the development plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until details, including full product details, of the materials to be used on all the external elevations of the development hereby approved, including but not limited to the exterior walls and associated brick and cladding details including details of the brick banding; roof, including coping; windows, doors, rooflights and fascias ; have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The development shall be carried out in accordance with the approved details before it is first occupied or brought into first use. Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM1 and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and unless and until full details of hard and soft landscape works and boundary treatments to be carried out at the site have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The approved hard landscape works and boundary treatments shall be completed prior to first occupation of the development hereby approved, and the soft landscaping works within the first planting season following first occupation of the development. The details submitted shall include, but not be limited to: i .) Means of enclosure of the site and plots including any walls, gates or boundary fencing. ii.) Details of external hard surfacing. iii.) Details of the number, size and location of trees, shrubs and plants to be planted together with a planting specification and management. iv.) Details of measures to enhance biodiversity within the site. Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees ... view the full minutes text for item 19.