- That planning permission be REFUSED for the following reason: It has not been demonstrated that the proposed hours of operation would not result in material and significant harm to the residential amenity of neighbouring occupiers in the area due to increased noise and disturbance. This is unacceptable and contrary to the National Planning Policy Framework (2024), Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
Proposal: Application to vary condition 13 (hours of operation) opening times for non-residents amended from 7am to 11pm on any day to 7am to midnight on Sundays to Thursdays and 7am to 1am on Fridays and Saturdays with the opening times extended by one hour on the Friday and Saturday from 7am to 2am and on the Sunday from 7am to 1am prior to certain bank and public holidays with exceptions (Material amendment of planning permission 20/01199/FULM dated 17.03.2022).
Address: Roslin Hotel, Thorpe Esplanade, Thorpe Bay, Essex, SS1 3BG
Applicant: Regis Entertainment Limited
Agent: [name removed] of Davies Murch
Consultation Expiry: 28.11.2024
Expiry Date: 13.12.2024
Case Officer: Oliver Hart WP-0753-A-0000-P-00 Rev A; WP-0753-A-0001-P-00 Rev A; Plan Nos: WP-0753-A-0003-P-00 Rev A; WP-0753-A-0004-P-01 Rev A; WP-0753-A-0005-P-02 Rev A; WP-0753-A-0006-P-03 Rev A; WP-0753-A-0020-E-XX Rev A; WP-0753-A-0021-E-XX Rev A; WP-0753-A-0030-S-XX Rev A Additional information: Application Form; Cover Letter from Agent; Supporting Letter from the applicants
Recommendation: GRANT PLANNING PERMISSION subject to conditions 1 Site and Surroundings
1.1The application site on the northern side of Thorpe Esplanade is occupied by a cluster of interlinked buildings used as a hotel and associated facilities. The complex also accommodates space for bars, a restaurant and a wedding venue, some spa and gym facilities, most of which can be used by non-residents of the hotel on site.
1.2The existing buildings are mainly two-storey in scale with some having accommodation within the roofspace and with several single-storey extensions to the front and rear. The site currently accommodates car parking spaces to the rear. There are raised outdoor terraces to the front. The terraces are used for outdoor seating space, surrounded by glazed panels. The whole of the frontage is used for external seating seasonally. Low boundary walls and soft landscaping delineate the site to the front and sides, with higher timber boards to the rear boundary.
1.3To the south of the site is the public beach and the Thames Estuary which is subject of several designations for the protection of the natural environment. The rest of the surrounding area is residential in nature. A small part of the application site’s frontage lies within Flood Zone 2. The site and the surrounding area are part of the Seafront Character Zone 6 as defined in Policy DM6 of the Development Management Document. No other planning related designations affect the site or the surrounding area.
2 The Proposal
2.1Planning permission was granted on 17th March 2022 under application reference 20/01199/FULM for the “Partial demolition of the hotel and the erection of three storey extensions to the east, fronting Walton Road and to the west fronting Clieveden Road, reconfiguration of the main hotel elevation fronting Thorpe Esplanade, reconfiguration of the car park to provide 60 parking spaces, increase in floorspace from 3,140sqm to 5,708sqm, increase in hotel rooms from 62 to 67, creation of a part basement, provision of 44 cycle parking spaces, and hard and soft landscaping”
2.2This application seeks to vary condition 13 of the above permission which limits the function and hours of operation of that approved development as follows: “The premises of the hotel hereby approved shall not be open to non-residents outside the hours of 07:00 am to 11:00 pm on any day.
Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2021), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM4 of the Development Management Document (2015) and the advice contained within the National Design Guide (2021) and the Design and Townscape Guide (2009).”
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.