Resolved
- That ENFORCEMENT ACTION be AUTORISED to include (if/as necessary) the service of an Enforcement Notice under Section 172 of the Act and the pursuance of proceedings whether by prosecution or injunction to secure compliance with the requirements of the Enforcement Notice] to require those issued with a copy of the Enforcement Notice to: a) Remove the front gabled roof extension in its entirety; AND b) Remove the rear “L”-shaped dormer in its entirety; AND c) Restore the building to its condition before the breach took place; OR d) Construct the front and rear roof extensions in full accordance with the plans approved under planning permission 21/00111/AMDT or 21/01920/AMDT .; AND e) Remove from site all materials resulting from compliance with a) and b) and c) or d) above. With time for compliance of 6 calendar months. For the following reason: 01 The position, design and scale of the front gabled roof projection and the rear dormer are materially at odds with the prevailing townscape, forming unduly dominant and incongruous features which are not well integrated with their surroundings to the significant detriment of the character and visual amenities of the site, locality and the wider townscape. This is unacceptable and contrary to the National Planning Policy Framework (2024), National Design Guide (2021), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).