CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Southwark
Borough, Bankside and Walworth Community Council, Saturday 16 November 2013 at 1.00pm

Webber and Rushworth Street Streetscape Improvements

Approved Committee 2 papers

Borough, Bankside and Walworth Community Council approved this item on Saturday 16 November 2013. Below is the council's own wording, with the papers it was decided on.

Item14

Resolved

T hat the implementation of the scheme outlined in the report and appendices be approved, subject to statutory consultation, and subject to officers ensuring that this scheme complements the co m m u ni t y cou n c il h i gh w a y s c ap i t a l i n v e s t m e n t fund schemes for the same streets agreed by members earlier this year. Note: At this point Councillor Abdul Mohamed left the meeting. 3.10pm
Word for word from the decision Southwark published for this meeting. Source: moderngov.southwark.gov.uk

Follow this further

Built from Southwark's papers

What the report saysPro

Report to Borough, Bankside and Walworth Community Council, 7 pages

Recommendation

1. That the Borough, Bankside and Walworth Community Council approve the implementation of the above scheme (subject to statutory consultation) in line with the positive public consultation outcome outlined in the attached consultation summary (Appendix A).

BACKGROUND INFORMATION

2. In accordance with Part 3H paragraph 16 of the Southwark Constitution, community councils have the executive function to determine whether to implement non-strategic traffic and highway schemes.

3. The scheme in Webber Street and Rushworth Street is classified as non- strategic.

4. Full details of all results associated with the study can be found in Appendix A the ‘consultation report’.

5. The Cabinet Member for Transport, Environment, and Recycling was notified of the scheme and consultations documents on the 12 July 2012.

6. It is proposed that the following measures be implemented:

a) Rushworth Street

• Proposed 11m loading bay on the western side of Rushworth Street outside community faith centre. Loading bay to be in-filled with block paving.

• Boarding the loading bay are proposed buildouts incorporating planting bed and tree pit to improve the visual amenity of the streetscape and increase street greening.

Existing vehicular crossover adjacent to loading bay location to be removed and area converted to footway.

• ‘At any time’ kerbside waiting controls are proposed between the loading bay and Pocock Street and on the opposite side of the road extending from Pocock Street to the mid point of no. 50 Rushworth Street.

1 • These measures are proposed to ensure adequate sightlines are maintained for pedestrians at the Pocock Street / Rushworth Street junction and to enhance traffic management by maintaining adequate carriageway width past the loading bay.

• To improve traffic management and road safety, further ‘at any time’ kerbside waiting and controls are also proposed in Rushworth Street at the junctions with Webber Street and King’s Bench Street.

b) Webber Street

• Proposed buildout with planting adjacent to the existing cycle hire station to the east of Silex Street to reduce carriageway with and improve the visual amenity of the streetscape at this location.

• Proposed large pit to be located in the wide expanse of footway to the rear of the cycle hire station. Tree pit to be constructed using permeable surfacing to comply with sustainable urban drainage principles.

• Realignment of the existing tactile paving pedestrian crossing point across the junction of Silex Street to meet current specifications.

• ‘Ay any time’ waiting prohibitions proposed on the northern side of Webber Street (extending from opposite the cycle hire station to the junction of Rushworth Street) and across the existing raised table located between the hire station and Rushworth street. The measure is proposed to improve visibility for the Rushworth Street junction and to ensure carriageway width is maintained to assist with turning movements of large vehicles at the junction of Rushworth Street.

For more detail of scheme proposals, please refer to Appendix B

KEY ISSUES FOR CONSIDERATION

7. The new Blackfriars Settlement building, a social hub and community centre for the area has recently opened on Rushworth Street. The centre manager contacted the council to discuss the requirement to install a new loading bay adjacent to the centre to allow for a mini-bus to park and pick-up / drop-off elderly and disabled users to the centre.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Webber Rushworth Scheme Appendix BAppendix 1 pages Download
PDF
Webber and Rushworth CC ReportReport 7 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 15 attended
MS
Councillor Martin SeatonChair, present
PC
Councillor Poddy ClarkVice-Chair, present
CB
Councillor Catherine BowmanCommittee Member, present
NC
Councillor Neil CoyleCommittee Member, present
PD
Councillor Patrick DiamondCommittee Member, present
DG
Councillor Dan GarfieldCommittee Member, present
CH
Councillor Claire HicksonCommittee Member, apologies
LL
Councillor Lorraine Lauder MBECommittee Member, present
RL
Councillor Rebecca LuryCommittee Member, present
TM
Councillor Tim McNallyCommittee Member, apologies
DM
Councillor Darren MerrillCommittee Member, apologies
AM
Councillor Abdul MohamedCommittee Member, present

All 15 on the meeting page

More from Southwark Borough, Bankside and Walworth Community Council

All decisions
MeetingDecisionOutcome
9 Feb 2019 MinutesThat the minutes of the meeting held on 9 July 2018 be agreed as a correct record of the meeting, and signed by the c... Agreed Open
9 Feb 2019 Cleaner Greener Safer: Funding ReallocationThat the reallocation of a total of £61,640 as part of the 2019-20 Cleaner Greener Safer (CGS) programme be approved. Approved Open
9 Feb 2019 Cleaner Greener Safer 2019-20: Capital Funding AllocationThat the following allocations of funds for the 2019-20 Cleaner Greener Safer (CGS) capital programmes in the Borough... Approved Open
9 Feb 2019 Borough, Bankside and Walworth Community Council Highways Capital Investment 2019-2020That the following allocations of funds for the 2019-20 Community Council Highways Capital Investment programmes in t... Approved Open
9 Feb 2019 Allocation of Neighbourhoods Fund 2019-20That the following allocations of funds from Neighbourhoods Fund 2019-20 in the Borough, Bankside and Walworth Commun... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies