CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Southwark

67-71 Tanner Street, London SE1 3PL

Agreed Planning 4 papers

Planning Sub-Committee A (decommissioned, for planning committees after agreed this item on Saturday 20 May 2023. Below is the council's own wording, with the papers it was decided on.

Item7.1

Resolved

That planning permission for application 16/AP/5180 be granted subject to the completion of a legal agreement by 30 September 2017, and subject to the conditions set out in the report and the addendum report including an amended condition 13 to stipulate that any deliveries, unloading and loading shall only take place Monday to Saturday - 08:00 to 20:00. Having declared a pecuniary interest in the next agenda item Councillor Octavia Lamb left the meeting.
Word for word from the decision Southwark published for this meeting. Source: moderngov.southwark.gov.uk

Follow this further

Built from Southwark's papers

What the report saysPro

Report to Planning Sub-Committee A (decommissioned, for planning committees after, 19 pages

Recommendation

1. a. That planning permission is granted subject to conditions and the completion of a legal agreement.

b. In the event that the legal agreement is not completed by 30 September 2017, that the Director of Planning be authorised to refuse planning permission for the reasons set out in paragraph 53 of this report.

BACKGROUND INFORMATION

Site location and description

2. The application site is triangular in shape and approximately 0.046 hectares in size. The plot fronts Tanner Street to the south and is bounded by the railway viaduct serving London Bridge Station to the north/east and by the flank wall of the 7 storey mixed-use "Leatherworks" west. The site is currently vacant - the previous commercial building having being demolished - though it is acknowledged that planning permission was granted in 2015 for a part7/part 8-storey development comprising a ground floor retail unit with 9 residential units above.

3. The local area is characterised by the complex overlapping of road and rail networks and a mix of land uses. Ground floor office units along Tanner Street complement commercial activities along Tower Bridge Road, to the west, and Maltby Street to the east. Upper floors are typically residential, though there are exceptions to this along Tanner Street. The recently completed "Arc" building opposite comprises office accommodation at ground floor level with residential use above and rises to 10 storeys. In general, the surrounding architectural character is very mixed, but there is a robust, industrial character woven through much of the townscape. Whilst this site is close to the Bermondsey Street Conservation Area (the boundary of which is 55m to the west), it is not considered that it will impact upon its setting.

4. The site is located within the urban zone, the borough's air quality management area and within the Bermondsey, Borough and Rivers Archaeological Priority Zone.

Details of proposal

5. The proposal is for the erection of a 9 storey (+ basement) office building (use class B1a) and associated works. The proposal comprises a total of 2,998sqm of office floorspace and rises to a height of 29.91m.

6. The footprint on each of the floors covers the majority of the site, with the exception of a strip of hard landscaping to the north east of the site adjacent to the viaduct. This means that the proposed building immediately adjoins the flank wall of "the Leatherworks" building to the south, though the floorplate does recede on the upper three storeys, peeling away from the neighbouring building in a stepped fashion.

7. The proposal is for a predominantly brick built building with a buff/London stock type brick. The principal facade fronting Tanner Street will be characterised by deep window reveals with floor-to-ceiling windows that are angled back into the brick frame. This facade will tightly follow the back of the pavement edge and mirror the curvature of the Arc building, opposite.

8. Ancillary cycle parking, shower facilities and plant enclosures are located at basement level, with direct access provided from the main lift lobby.

Planning history

9. 10/EQ/0132 Application type: Pre-Application Enquiry (ENQ) 8 storey mixed-use development, with use classes A1-A3 / B1 or similar for ground floor, with residential above, for 25 flats on the upper floors. Decision date 04/07/2011 Decision: Pre-application enquiry closed (EQC)

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Pre-application advice 16/EQ/0211Appendix 3 5 pages Download
PDF
RecommendationAppendix 4 6 pages Download
PDF
Report: 67-71 Tanner Street. London SE1 3PLReport 19 pages DownloadRead as text
PDF
Site plan: 67-71 Tanner Street, London SE1 3PLPlan 1 pages Download

At this meeting

Whole meeting

Who was there

5 of 10 attended
LP
Councillor Leo PollakChair, present
BJ
Councillor Ben JohnsonVice-Chair, present
ND
Councillor Nick DolezalCommittee Member, apologies
TF
Councillor Tom FlynnCommittee Member, apologies
OL
Councillor Octavia LambCommittee Member, present
DN
Councillor David NoakesCommittee Member, present
KW
Councillor Kath WhittamCommittee Member, apologies
SK
Councillor Sarah KingReserve, present as substitute
CA
Chidilim AgadaSecretary, expected
GG
Gerald GohlerSecretary, expected

On this subject at Southwark

Search all
  1. 67-71 Tanner Street, London SE1 3PLThis decision
  2. Sati, The Tannery, Bermondsey Street, London SE1 3XNDecided

More from Southwark Planning Sub-Committee A (decommissioned, for planning committees after

All decisions
MeetingDecisionOutcome
20 May 2023 Introduction and welcomeThat Councillor Nick Dolezal chair the meeting. The chair welcomed councillors , members of the public and officers t... Decided Open
20 May 2023 Items of business that the Chair deems urgentThat the determination of planning applications, or formal observations and comments, the instigation of enforcement ... Agreed Open
20 May 2023 MinutesThat the minutes of the meeting held on the 3 October 2017 be approved as a correct record and signed by the chair. Approved Open
20 May 2023 MinutesThat the minutes of the meeting held on 9 May 2017 be approved as a correct record and signed by the chair. Approved Open
20 May 2023 MinutesThat the minutes of the meeting held on 18 July 2017 be approved as a correct record and signed by the chair. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies