Planning Sub-Committee A (decommissioned, for planning committees after approved this item on Saturday 20 May 2023. Below is the council's own wording, with the papers it was decided on.

Item7.1

Resolved

That planning permission for application number 17/AP/4796 be granted, subject to the following: a) An amendment to condition 3 as set out in the report; so that the condition (concerning materials) will include reference to samples of all external facing materials, including the colour specification, to be presented on site for approval in writing by the Local Planning Authority. b) The inclusion of the following additional condition: That a Construction Method Statement which includes the management of vehicles and deliveries to the site be submitted to the Local Planning Authority for approval in writing . c) That an informative be included for the preparation of a Service Management Plan which respects consistency with the pattern of servicing in the area.
Word for word from the decision Southwark published for this meeting. Source: moderngov.southwark.gov.uk

Follow this further

Built from Southwark's papers

What the report saysPro

Report to Planning Sub-Committee A (decommissioned, for planning committees after, 10 pages

Recommendation

1. That planning permission be granted subject to conditions.

BACKGROUND INFORMATION

Site location and description

2. Blue Lion Place is located to the north of Long Lane whereby it can be accessed. It can also be access via a pedestrian route from Bermondsey Street. The surrounding buildings range in height between 2-7 storeys. Currently existing on the site is a three storey building with a recessed third floor and one principle elevation facing into the courtyard of Blue Lion Place. There are heritage assets in the wider context, namely the Bermondsey Street Conservation Area and listed buildings to the east.

3. The site is located within:

- The Central Activities Zone - An Air Quality Management Area - An Archaeological Priority Zone - The Bankside, Borough and London Bridge Opportunity Area

Details of proposal

4. The proposal is to demolish the existing building and replace with a five storey building encompassing the entire footprint of the site (100.5sqm). The height of the building to the eaves would be 14m with a ridge height of 17.6m. The width of the building would be 11.5m and the length 9.7m. The use of the building would be Office (B1 Use Class).

Planning history 5. 09/AP/2818 Application type: Full Planning Application (FUL) Change of use of existing live/work unit together with associated external alterations to provide 80 sqm of commercial (Class B1) floorspace at ground floor level and 2 x 2 bed residential units above. Decision date 09/08/2011 Decision: Granted with Legal Agreement (GWLA)

17/EQ/0108 Application type: Pre-Application Enquiry (ENQ) Construction of a balcony infill and a two storey rear extension, to be used as B1 Office. Decision date 03/05/2017 Decision: Pre-application enquiry closed (EQC)

17/EQ/0407 Application type: Pre-Application Enquiry (ENQ) Development of an extension and alteration to the external appearance of an existing B1(a) Office. Decision date 11/12/2017 Decision: Pre-application enquiry closed (EQC)

Planning history of adjoining sites 6. 00/AP/0951. ADDRESS: 3 Market Yard Mews, 194-204 Bermondsey Street SE1. DESCRIPTION: Provision of new first floor infill over existing vehicular access off Bermondsey Street to create a self-contained flat. Granted 22/09/2004

06/AP/1973. ADDRESS: 184-192 BERMONDSEY STREET, LONDON, SE1 3TQ. DESCRIPTION: Erection of a part five, part six storey building (18.7m high) plus basement level comprising a 102 bedroom apartment/hotel, a retail unit (Class A use totalling 185m²), 3 commercial units (Class B1 use totalling 225m²) and health & fitness facility. Granted 25/09/2007

KEY ISSUES FOR CONSIDERATION

Summary of main issues

7. The main issues to be considered in respect of this application are:

a) the principle of the development in terms of land use and conformity with strategic policies.

b) the impact of the proposed development on neighbouring properties.

c) the design and visual impact of the proposal.

d) transport impacts.

e) all other relevant planning considerations.

Planning policy

National Planning Policy Framework (the Framework) 8. Section 1 - Building a strong, competitive economy Section 7 - Requiring good design Section 12 - Conserving and enhancing the historic environment

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 7.1 Report 17AP4796Report 10 pages DownloadRead as text
PDF
Item 7.1 draft recommendation 17AP4796Report 3 pages Download
PDF
Item 7.1 site planPlan 1 pages Download

At this meeting

Whole meeting

More from Southwark Planning Sub-Committee A (decommissioned, for planning committees after

All decisions
MeetingDecisionOutcome
20 May 2023 Introduction and welcomeThat Councillor Nick Dolezal chair the meeting. The chair welcomed councillors , members of the public and officers t... Decided Open
20 May 2023 Items of business that the Chair deems urgentThat the determination of planning applications, or formal observations and comments, the instigation of enforcement ... Agreed Open
20 May 2023 MinutesThat the minutes of the meeting held on the 3 October 2017 be approved as a correct record and signed by the chair. Approved Open
20 May 2023 MinutesThat the minutes of the meeting held on 9 May 2017 be approved as a correct record and signed by the chair. Approved Open
20 May 2023 MinutesThat the minutes of the meeting held on 18 July 2017 be approved as a correct record and signed by the chair. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies