Resolved
That planning application 11/AP/3481 be granted, subject to the conditions set out in the report.
Planning Sub-Committee B (decommissioned, for planning committees after decided this item on Saturday 20 May 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That planning application 11/AP/3481 be granted, subject to the conditions set out in the report.
1 Grant planning permission subject to conditions.
BACKGROUND INFORMATION
Site location and description
2 The application site is known as 1a Sumner Road, which was originally a 1930s light industrial building formerly used as a clothes manufacturing warehouse.
3 It is surrounded to the north, west and east by Burgess Park and to the south by a new mixed use development, known as Galleria Court. This neighbouring development comprises a 5-10-storey building, which contains 47 small light industrial/office studios, 4 live/work units and 98 flats, together with 97 car-parking spaces.
4 The premises is currently occupied by the Christ Apostolic Church of Mount Zion International (CACMZI) and is used as a place of worship.
5 The site is located within the Peckham and Nunhead Action Area, and is not located within the setting of any listed building or within a conservation area.
Details of proposal
6 Planning permission is sought for the continued use of premises as a place of worship (D1), on a permanent basis.
7 Temporary permission (09-AP-2300) has previously been granted which expired on 19 October 2011. There has been in a delay in processing this application due to the need to undertake site visits to monitor how the use was operating.
8 Both internal and external alterations were undertaken in association with the limited period permission (09-AP2300) granted at a Peckham Community Council planning meeting on 2 April 2010 and detailed in the planning history setion. The previous permission included the repositioning of the main entrance to the north face of the building fronting Burgess Park with a canopy over, and covered cycle storage to the front of the building. There were no further external changes proposed.
9 The programme of church services being sought are in line with that previously granted. Monday to Thursday 18:00 to 21:00; Friday 18:00 to 21:30; Saturday 10:00 to 21:00; Sunday 09:30 to 16:00. There is also proposed a special new years eve service between 21:00 and 01:00.
10 The applicant has submitted a programme of church services which show a range of different types and sizes of meetings within the building, such as choir practice, bible study, and prayers throughout the week in addition to the main Sunday services.
11 The record of attendance submitted previously showed a range of congregation numbers for the main weekly services to between 82 to a maximum of 371. With this submission, the applicant has stated that the normal number of attendees is within the range of approximately 220 to 260 persons.
Planning history
12 Planning permission (9800089) was refused in March 1998 for a change of use from light industrial to church use for the following reasons:
The proposal would result in the unacceptable loss of existing employment floor space contrary to Policy B.1.2 ‘Protection Outside Employment Areas and Sites of the then Southwark Unitary Development Plan 1995.
The proposed use is likely to generate high levels of on-street parking which would prejudice the safety of pedestrians and other road users and generate noise and disturbance for local residents contrary to policy E.3.1 of the then Southwark Unitary Development Plan 1995.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Recommendation: Christ Apostolic Church Mount Zion International, 1A Sumner Road, London SE15 6LAAppendix 3 | 3 pages | Download |
PDF |
Report: Christ Apostolic Church Mount Zion International, 1A Sumner Road, London SE15 6LAReport | 17 pages | DownloadRead as text |
PDF |
Site plan: Christ Apostolic Church Mount Zion International, 1A Sumner Road, London SE15 6LAPlan | 1 pages | Download |
Follow Planning Sub-Committee B (decommissioned, for planning committees after at Southwark and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 May 2023 | MinutesThat the minutes of the meeting held on the 10 March 2015 be approved as a correct record and signed by the chair | Approved | Open |
| 20 May 2023 | Items of business that the Chair deems urgentThat the determination of planning applications, or formal observations and comments, the instigation of enforcement ... | Decided | Open |
| 20 May 2023 | MinutesThat the minutes of the meeting held on the 13 December 2017 be approved as a correct record and signed by the chair. | Approved | Open |
| 20 May 2023 | MinutesThat the minutes of the meeting held on the 11 September 2017 be approved as a correct record and signed by the chair. | Approved | Open |
| 20 May 2023 | MinutesThat the minutes of the meeting held on 31 October 2017 be approved as a correct record and signed by the chair. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.