Resolved
That planning permission for application number 16-AP-3968 be granted subject to the conditions outlined in the report and amended conditions outlined in the addendum report.
Planning Sub-Committee B (decommissioned, for planning committees after decided this item on Saturday 20 May 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That planning permission for application number 16-AP-3968 be granted subject to the conditions outlined in the report and amended conditions outlined in the addendum report.
1. Grant Planning permission subject to Planning Obligations Agreement and conditions.
BACKGROUND INFORMATION
Site location and description
2. The application site is a piece of land between the north-south railway viaduct between Elephant and Castle and Loughborough Junction, and Pelier Park. The site is currently enclosed behind hoardings, and has in the past contained a car wash and a scrap yard. There is an existing scaffold and corrugated plastic canopy structure over an area to the east of the site, adjacent to the viaduct and covering the entrance to some arches. The surrounding area has a predominantly residential character, with some low key industrial uses adjacent to the rail viaduct. There is also a public house (Sir Robert Peel) to the west of the site.
3. The site is designated within the Core Strategy Proposals Map as follows: Air Quality Management Area Urban Density Zone Flood Risk Zone 3 PTAL 5 (High access to Public Transport) Controlled Parking Zone
4. There are no designated heritage assets on or near to the site. Pelier Park, which borders the northern and western boundaries of the site is protected open space, designated as Other Open Space, OS84 in the Core Strategy Proposals Map. Details of proposal
5. The proposal consists of the construction of a seven-storey residential development containing 17 dwellings for social rent, consisting of 4 x 1 bed flats, 9 x 2 bed flats and 4 x 3 bed flats. A three and two bed duplex would be split across ground and first floor with an additional three bed flat at first floor. two x two beds and one x one bed would be on floors 2-5 and two x three bed units would be provided at sixth floor level.
6. Cycle and refuse storage are proposed at ground floor level as well as a plant machine room which would partially extend into a lower ground floor of the building.
7. The proposed materials would consist of a facing brick work as the main material with soldier brick courses and circular brick columns. The windows and doors would consist of aluminium composite material with steel balustrades to the balconies.
Planning history
8. 11/EN/0062 Enforcement type: Unauthorised building works (UBW) - motor mechanics operating in archway under bridge Sign-off date 04/07/2012 Sign-off reason: Final closure - breach immune (FCBI)
9. 14/EN/0356 Enforcement type: Change of use (COU) - Unauthorised industrial use. Sign-off date 29/10/2014 Sign-off reason: Final closure - no breach of control (FCNB)
10. 13/AP/3300 for: Outline Planning Permission was granted for the erection of a Four storey development of 7 dwellings comprising 5 x 1 bed flats and 2 x 3 bed flats (outline application with access, appearance, landscaping, layout and scale reserved for future consideration).
Planning history of adjoining sites
11. 1-9 Pelier Street - Planning permission was granted in 2001 for the continued use of site and arch for car repairs. (This site is further south of the application site).
12. 11-13 Dartford Street - 08-AP-1382 - Conversion of archway and land adjacent to viaduct to form a live/work unit with the commercial component within the archway.
KEY ISSUES FOR CONSIDERATION
Summary of main issues
13. The main issues to be considered in respect of this application are:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Item 7.2: Report 16AP3968Report | 20 pages | DownloadRead as text |
PDF |
Item 7.2: Site plan 16AP3968Plan | 1 pages | Download |
PDF |
Item 7.2: draft recommendation 16AP3968Report | 6 pages | Download |
Follow Planning Sub-Committee B (decommissioned, for planning committees after at Southwark and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 May 2023 | MinutesThat the minutes of the meeting held on the 10 March 2015 be approved as a correct record and signed by the chair | Approved | Open |
| 20 May 2023 | Items of business that the Chair deems urgentThat the determination of planning applications, or formal observations and comments, the instigation of enforcement ... | Decided | Open |
| 20 May 2023 | MinutesThat the minutes of the meeting held on the 13 December 2017 be approved as a correct record and signed by the chair. | Approved | Open |
| 20 May 2023 | MinutesThat the minutes of the meeting held on the 11 September 2017 be approved as a correct record and signed by the chair. | Approved | Open |
| 20 May 2023 | MinutesThat the minutes of the meeting held on 31 October 2017 be approved as a correct record and signed by the chair. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.