12 items, 46 papersAbout 21 MB, led by Corporate Plan Progress Report.
No exempt items listedEvery item is due to be heard in public.
This meeting was held10 February 2025
12items
46papers
9decisions
–exempt
Running order, sized by papersItem 18/25 to 29/25
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Corporate Plan Progress Report is the main business.

18/25
Procedure

Apologies and Substitutes

To receive apologies for absence and notification of substitutions.

19/25
Report

Minutes

The minutes of the meeting held on 20 January as to follow. : The minutes of the meeting held on 20 January 2025 were agreed as a correct record. A member queried why information that had been requested at the previous meeting had not been provided. The Committee were advised that this information could be found within Appendix 3 attached to the Detailed Budget Report. The Committee were advised that information...

1 paper, 275 KBSearch inside with Pro
ReportMinutes275 KBDownload
20/25
Procedure

Disclosures of Interest

To receive any disclosures of interest from councillors in accordance with the Council’s Code of Conduct for members aside from those councillors that are also Surrey County Councillors.

21/25
Report

Proposed Fees and Charges for 2025-26

/25 /25 The Committee is asked to review and agree the Fees and Charges for 2025-26 and make a recommendation to Council.

Decision: The Committee resolved to agree the Fees and Charges for 2025-26. Decision page

9 papers, 1.7 MBSearch inside with Pro
AppendixAppendix 1: SBC Fees and Charges by Committee 27-1-2025 /25190 KBDownload
AppendixAppendix 2: E&S Fees and charges budget summary 31-01-25 /25198 KBDownload
AppendixAppendix 3: BIG Committee Fees and Charges budget summary /25180 KBDownload
AppendixAppendix 4: CWHC Fees and charges budget summary 31-01-25 /25198 KBDownload
AppendixAppendix 5: CPRC Fees and charges budget summary 31-01-25 /25183 KBDownload
ReportCPRC Fees and Charges Committee Report 25-26 31-1-25 /25345 KBDownload
ReportProposed Fees and Charges for 2025-26346 KBDownload
ReportView as HTML (21/25/2) 35 KB35 KBCopy on its way
ReportView item 21/25 as HTML 35 KB35 KBCopy on its way
22/25
Report

Detailed Budget for 2025/26

/25 /25 Committee is asked to make a recommendation to Council as per the attached report.

Decision: The Committee resolved to recommend that Council consider and approve the following: 1. To approve a 2.9% increase on the Spelthorne Borough Council element of the Council Tax for 2025-26. Moreover: a. The Revenue estimates as set out in Appendix 1 be approved. b. £400,100 as et out in this report are to be appropriated from Earmarked Reserves other than sinking fund reserves in support of Spelthorne’s local Council Tax for 2025-26. c. Net use of £5,037,300 of Earmarked Sinking Funds reserves.... Decision page

7 papers, 1.6 MBSearch inside with Pro
AppendixAppendix 1: Detailed Budget 2025-26 @ 31.1.25 /25140 KBDownload
AppendixAppendix 2: Net Expenditure Budget 2025-26 by Committee @ 31.1.25 /25112 KBDownload
AppendixAppendix 3: General Fund Subjective Analysis 2025-26 @ 31.1.25 /2517 KBDownload
AppendixAppendix 4: Calculation of Ctax Base WP /2523 KBDownload
AppendixAppendix 5: Calc of CTax (SBC only) for different valuation bands for 2025-26 /2545 KBDownload
ReportDetailed Budget for 2025/261.1 MBDownload
ReportView item 22/25 as HTML 156 KB156 KBCopy on its way
23/25
Report

Capital Strategy 2025/26 to 2026/27

/25 /25 The Committee is asked to make a recommendation to Council to approve the Capital Strategy for 2025/26 to 2026/27 as set out in the report.

Decision: Committee resolved to recommend that Council approves the Capital Strategy as set out in the report. Decision page

3 papers, 755 KBSearch inside with Pro
ReportCapital Estimate 2025-26 to 2028-29 Final /25120 KBDownload
ReportCapital Strategy 2025/26 to 2026/27521 KBDownload
ReportView item 23/25 as HTML 114 KB114 KBCopy on its way
24/25
Report

Estimated 2025/26 to 2028/29 Capital Programme

/25 /25 The Committee is asked to make a recommendation to Council to approve the Estimated 2025/26 to 2028/29 Capital Programme.

Decision: The Committee resolved to recommend that Council approves the proposed Capital Programme for 2025/26 to 2028/29. Decision page

3 papers, 507 KBSearch inside with Pro
AppendixAppendix A: 202526 to 202829 Capital Programme /2566 KBDownload
ReportEstimated 2025/26 to 2028/29 Capital Programme359 KBDownload
ReportView item 24/25 as HTML 82 KB82 KBCopy on its way
25/25
Report

Car Park Management system award

/25 /25 The Committee is asked to: 1. Approve the tender award as set out in this report; and 2. Delegate authority to the Group Head of Corporate Governance to enter into necessary legal documentation to formalise the appointment of the preferred contractor.

Decision: The Committee resolved to: 1. Approve the tender award as set out in this report; and 2. Delegate authority to the Group Head of Corporate Governance to enter into necessary legal documentation to formalise the appointment of the preferred contractor. Decision page

6 papers, 3.3 MBSearch inside with Pro
AppendixAppendix 1: Specification of Requirements /251.7 MBDownload
AppendixAppendix 2: Pricing schedule /25374 KBDownload
AppendixAppendix 3: Table of evaluation scores /25358 KBDownload
ReportCar Park Management system award635 KBDownload
AppendixView as HTML (25/25/2) 109 KB109 KBCopy on its way
ReportView item 25/25 as HTML 60 KB60 KBCopy on its way
26/25
Report

Pay Policy 2025/26

/25 /25 The Committee is asked to make a recommendation to Council to approve the Pay Policy Statement for 2025/26.

Decision: The Committee resolved to recommend to Council that the Pay Policy Statement is approved. Decision page

6 papers, 1.1 MBSearch inside with Pro
AppendixAppendix 2: Discretions Policy /25244 KBDownload
AppendixFINAL: Pay policy statement 2025_26 Appendix 1 /25272 KBDownload
ReportPay Policy 2025/26369 KBDownload
AppendixView as HTML (26/25/2) 90 KB90 KBCopy on its way
AppendixView as HTML (26/25/3) 73 KB73 KBCopy on its way
ReportView item 26/25 as HTML 42 KB42 KBCopy on its way
27/25
ReportMain business

Corporate Plan Progress Report

Report to follow

Decision: The Committee resolved to: 1. Note the update on progress with the planned actions under each of the Corporate Plan priorities, which are summarised in Appendix A; and 2. Agree to a review of the planned actions under the Corporate Plan to take account of the factors outlined in this report, in particular the proposed reorganisation of Local Government in Surrey and for progress with any revised prioritisation of actions to be reported back to the next meeting of this Committee. Decision page

5 papers, 11 MBSearch inside with Pro
AppendixAppendix A: Summary of progress with Key Actions under the Corp Plan 2024-28 ) /25634 KBDownload
AppendixAppendix B: CORPORATE PLAN 2024-28 /259.7 MBDownload
ReportCorporate Plan Progress Report384 KBDownload
AppendixView as HTML (27/25/2) 67 KB67 KBCopy on its way
ReportView item 27/25 as HTML 55 KB55 KBCopy on its way
28/25
Procedure

Urgent Actions

To note those urgent actions which have been taken by the Chief Executive in consultation with the Leader since the last Corporate Policy and Resources meeting on 20 January 2025. Committee are advised that one urgent action has taken place in respect of the Shared Prosperity Fund (documents attached).

Decision: The Committee resolved to note the two urgent actions that had been taken since the last meeting. Decision page

4 papers, 537 KBSearch inside with Pro
ReportPotential projects for SPF underspend final /25204 KBDownload
ReportUrgent Action: Appointment of a Director to KGE Board /25103 KBDownload
ReportUrgent Actions207 KBDownload
ReportView as HTML (28/25/2) 23 KB23 KBCopy on its way
29/25
Report

Forward Plan

To consider the for committee business.

Decision: The Committee resolved to note the contents of the . Decision page

2 papers, 98 KBSearch inside with Pro
ReportForward Plan49 KBDownload
ReportView item 29/25 as HTML 49 KB49 KBCopy on its way
Read inside all 46 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: Corporate Plan Progress Report

Item 27/25 is where most of this meeting's papers sit: 5 papers, about 11 MB.

Item 27/25

Corporate Plan Progress Report

Report to follow

What is in the pack5 papers, about 11 MB
Appendix A
Summary of progress with Key Actions under the Corp Plan 2024-28 ) /25Supporting paper
634 KB
Appendix B
CORPORATE PLAN 2024-28 /25Supporting paper
9.7 MB
Report
Corporate Plan Progress ReportThe report to the committee
384 KB
Appendix
View as HTML (27/25/2) 67 KBSupporting paper
67 KB
Report
View item 27/25 as HTML 55 KBThe report to the committee
55 KB
Read and search every page of this itemPro opens all 5 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

20 January 2025Corporate Plan Progress Report/25 /25 Report to follow
10 February 2025Corporate Plan Progress ReportThis meeting.

Every paper for this meeting

All 46 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
MinutesItem 19/25, Minutes
275 KB
Kept 30 Sep
SBC Fees and Charges by Committee 27-1-2025 /25Appendix 1, item 21/25, Proposed Fees and Charges for 2025-26
190 KB
Kept 30 Sep
E&S Fees and charges budget summary 31-01-25 /25Appendix 2, item 21/25, Proposed Fees and Charges for 2025-26
198 KB
Kept 30 Sep
BIG Committee Fees and Charges budget summary /25Appendix 3, item 21/25, Proposed Fees and Charges for 2025-26
180 KB
Kept 30 Sep
CWHC Fees and charges budget summary 31-01-25 /25Appendix 4, item 21/25, Proposed Fees and Charges for 2025-26
198 KB
Kept 30 Sep
CPRC Fees and charges budget summary 31-01-25 /25Appendix 5, item 21/25, Proposed Fees and Charges for 2025-26
183 KB
Kept 30 Sep
CPRC Fees and Charges Committee Report 25-26 31-1-25 /25Item 21/25, Proposed Fees and Charges for 2025-26
345 KB
Kept 30 Sep
Proposed Fees and Charges for 2025-26Item 21/25, Proposed Fees and Charges for 2025-26
346 KB
Kept 30 Sep
View as HTML (21/25/2) 35 KBItem 21/25, Proposed Fees and Charges for 2025-26
35 KB
Copy queued
Copy on its wayRead here
View item 21/25 as HTML 35 KBItem 21/25, Proposed Fees and Charges for 2025-26
35 KB
Copy queued
Copy on its wayRead here
Detailed Budget 2025-26 @ 31.1.25 /25Appendix 1, item 22/25, Detailed Budget for 2025/26
140 KB
Kept 30 Sep
Net Expenditure Budget 2025-26 by Committee @ 31.1.25 /25Appendix 2, item 22/25, Detailed Budget for 2025/26
112 KB
Kept 30 Sep
General Fund Subjective Analysis 2025-26 @ 31.1.25 /25Appendix 3, item 22/25, Detailed Budget for 2025/26
17 KB
Kept 30 Sep
Calculation of Ctax Base WP /25Appendix 4, item 22/25, Detailed Budget for 2025/26
23 KB
Kept 30 Sep
Calc of CTax (SBC only) for different valuation bands for 2025-26 /25Appendix 5, item 22/25, Detailed Budget for 2025/26
45 KB
Kept 30 Sep
Detailed Budget for 2025/26Item 22/25, Detailed Budget for 2025/26
1.1 MB
Kept 30 Sep
View item 22/25 as HTML 156 KBItem 22/25, Detailed Budget for 2025/26
156 KB
Copy queued
Copy on its wayRead here
Capital Estimate 2025-26 to 2028-29 Final /25Item 23/25, Capital Strategy 2025/26 to 2026/27
120 KB
Kept 30 Sep
Capital Strategy 2025/26 to 2026/27Item 23/25, Capital Strategy 2025/26 to 2026/27
521 KB
Kept 30 Sep
View item 23/25 as HTML 114 KBItem 23/25, Capital Strategy 2025/26 to 2026/27
114 KB
Copy queued
Copy on its wayRead here
202526 to 202829 Capital Programme /25Appendix A, item 24/25, Estimated 2025/26 to 2028/29 Capital Programme
66 KB
Kept 30 Sep
Estimated 2025/26 to 2028/29 Capital ProgrammeItem 24/25, Estimated 2025/26 to 2028/29 Capital Programme
359 KB
Kept 30 Sep
View item 24/25 as HTML 82 KBItem 24/25, Estimated 2025/26 to 2028/29 Capital Programme
82 KB
Copy queued
Copy on its wayRead here
Specification of Requirements /25Appendix 1, item 25/25, Car Park Management system award
1.7 MB
Kept 30 Sep
Pricing schedule /25Appendix 2, item 25/25, Car Park Management system award
374 KB
Kept 30 Sep
Table of evaluation scores /25Appendix 3, item 25/25, Car Park Management system award
358 KB
Kept 30 Sep
Car Park Management system awardItem 25/25, Car Park Management system award
635 KB
Kept 30 Sep
View as HTML (25/25/2) 109 KBItem 25/25, Car Park Management system award
109 KB
Copy queued
Copy on its wayRead here
View item 25/25 as HTML 60 KBItem 25/25, Car Park Management system award
60 KB
Copy queued
Copy on its wayRead here
Discretions Policy /25Appendix 2, item 26/25, Pay Policy 2025/26
244 KB
Kept 30 Sep
FINAL: Pay policy statement 2025_26 Appendix 1 /25Item 26/25, Pay Policy 2025/26
272 KB
Kept 30 Sep
Pay Policy 2025/26Item 26/25, Pay Policy 2025/26
369 KB
Kept 30 Sep
View as HTML (26/25/2) 90 KBItem 26/25, Pay Policy 2025/26
90 KB
Copy queued
Copy on its wayRead here
View as HTML (26/25/3) 73 KBItem 26/25, Pay Policy 2025/26
73 KB
Copy queued
Copy on its wayRead here
View item 26/25 as HTML 42 KBItem 26/25, Pay Policy 2025/26
42 KB
Copy queued
Copy on its wayRead here
Summary of progress with Key Actions under the Corp Plan 2024-28 ) /25Appendix A, item 27/25, Corporate Plan Progress Report
634 KB
Kept 30 Sep
CORPORATE PLAN 2024-28 /25Appendix B, item 27/25, Corporate Plan Progress Report
9.7 MB
Kept 30 Sep
Corporate Plan Progress ReportItem 27/25, Corporate Plan Progress Report
384 KB
Kept 30 Sep
View as HTML (27/25/2) 67 KBItem 27/25, Corporate Plan Progress Report
67 KB
Copy queued
Copy on its wayRead here
View item 27/25 as HTML 55 KBItem 27/25, Corporate Plan Progress Report
55 KB
Copy queued
Copy on its wayRead here
Potential projects for SPF underspend final /25Item 28/25, Urgent Actions
204 KB
Kept 30 Sep
Urgent Action: Appointment of a Director to KGE Board /25Item 28/25, Urgent Actions
103 KB
Kept 30 Sep
Urgent ActionsItem 28/25, Urgent Actions
207 KB
Kept 30 Sep
View as HTML (28/25/2) 23 KBItem 28/25, Urgent Actions
23 KB
Copy queued
Copy on its wayRead here
Forward PlanItem 29/25, Forward Plan
49 KB
Kept 30 Sep
View item 29/25 as HTML 49 KBItem 29/25, Forward Plan
49 KB
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 20 January 2025. 3 of its items lead into this meeting; 6 items are new. Point at any item to follow a thread. Procedural items are left out.

Jan20
20 January 202517 items, 64 papers
Held
carried over
Feb10
10 February 202512 items, 46 papers
Held
2/25
MinutesTo confirm the minutes of the meeting held on 09 December 2025 as a...
5/25
Corporate Policy and Resources Draft Detailed budget for 2025/26/25 /25 The Committee are asked to consider and approve the draft...
6/25
Corporate Policy and Resources Draft Capital Programme for 2025/26/25 /25 Report to follow
7/25
Treasury Management Strategy Mid-Year Review/25 /25 The Committee is asked to note the performance of the...
8/25
Treasury Management Draft Strategy 2025-26/25 /25 The Committee is asked to: 1. Approve the Treasury Management...
9/25
Refreshed Sinking Fund Model/25 /25 The Committee is asked the note the progress on the Sinking...
10/25
Revised Corporate Complaints Policy/25 /25 The Committee is asked to adopt the proposed revised...
11/25
2023-24 Audited Accounts for KGE/25 /25 The Committee is asked to note the audited financial...
12/25
Eclipse Leisure Centre Additional Spend/25 /25 The Committee is asked to note the updated budget position...
14/25
Terms of Reference for KGE Task & Finish Group/25 /25 The Committee is asked to agree the Terms of Reference for...
15/25
Terms of Reference for Reorganisation Board/25 /25 The Committee is asked to agree the Terms of Reference for...
17/25
Forward PlanTo consider the for committee business.
19/25
MinutesNew this time
21/25
Proposed Fees and Charges for 2025-26New this time
22/25
Detailed Budget for 2025/26/25 /25 Committee is asked to make a recommendation to Council as per...
23/25
Capital Strategy 2025/26 to 2026/27New this time
24/25
Estimated 2025/26 to 2028/29 Capital Programme/25 /25 The Committee is asked to make a recommendation to Council to...
25/25
Car Park Management system awardNew this time
26/25
Pay Policy 2025/26New this time
27/25
Corporate Plan Progress ReportNew this time
29/25
Forward PlanTo consider the for committee business.

The threads

  • Corporate Policy and Resources Draft Detailed budget for 2025/26 leads to item 22/25, Detailed Budget for 2025/26
  • Corporate Policy and Resources Draft Capital Programme for 2025/26 leads to item 24/25, Estimated 2025/26 to 2028/29 Capital Programme
  • Forward Plan leads to item 29/25, Forward Plan

Not carried over

Treasury Management Strategy Mid-Year Review, Treasury Management Draft Strategy 2025-26, Refreshed Sinking Fund Model, Revised Corporate Complaints Policy and 4 more do not return this time.

See the 20 January meeting

This committee over time

Every Corporate Policy and Resources Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

55 meetings, 2021 to 2027Dot size shows the number of papers
2021202220232024202520262027
HeldThis meeting
MeetingItemsPapers
18 Jan 2027Monday
0items
0papers
UpcomingOpen
30 Nov 2026Monday
11items
13papers
UpcomingOpen
12 Oct 2026Monday
15items
52papers
HeldOpen
8 Sep 2026Tuesday
13items
39papers
HeldOpen
29 Jul 2026Wednesday
4items
4papers
HeldOpen
13 Jul 2026Monday
17items
35papers
HeldOpen
26 May 2026Tuesday
15items
23papers
HeldOpen
20 Apr 2026Monday
14items
39papers
HeldOpen
23 Feb 2026Monday
0items
0papers
HeldOpen
17 Feb 2026Tuesday
18items
60papers
HeldOpen
3 Feb 2026Tuesday
3items
7papers
HeldOpen
19 Jan 2026Monday
11items
23papers
HeldOpen
1 Dec 2025Monday
14items
18papers
HeldOpen
11 Nov 2025Tuesday
13items
19papers
HeldOpen
13 Oct 2025Monday
13items
43papers
HeldOpen
8 Sep 2025Monday
12items
26papers
HeldOpen
7 Jul 2025Monday
11items
28papers
HeldOpen
12 May 2025Monday
18items
51papers
HeldOpen
24 Mar 2025Monday
16items
40papers
HeldOpen
17 Mar 2025Monday
3items
0papers
HeldOpen
10 Feb 2025Monday, this meeting
12items
46papers
20 Jan 2025Monday
17items
64papers
HeldOpen
9 Dec 2024Monday
23items
68papers
HeldOpen
15 Oct 2024Tuesday
19items
43papers
HeldOpen
9 Sep 2024Monday
19items
55papers
HeldOpen
8 Jul 2024Monday
19items
28papers
HeldOpen
3 Jun 2024Monday
21items
30papers
HeldOpen
15 Apr 2024Monday
22items
40papers
HeldOpen
19 Feb 2024Monday
19items
48papers
HeldOpen
22 Jan 2024Monday
15items
16papers
HeldOpen
27 Nov 2023Monday
19items
31papers
HeldOpen
16 Oct 2023Monday
19items
25papers
HeldOpen
11 Sep 2023Monday
16items
18papers
HeldOpen
17 Jul 2023Monday
13items
17papers
HeldOpen
26 Jun 2023Monday
16items
24papers
HeldOpen
5 Jun 2023Monday
0items
0papers
HeldOpen
17 Apr 2023Monday
9items
11papers
HeldOpen
21 Mar 2023Tuesday
6items
0papers
HeldOpen
20 Feb 2023Monday
23items
37papers
HeldOpen
16 Jan 2023Monday
21items
25papers
HeldOpen
28 Nov 2022Monday
19items
27papers
HeldOpen
23 Nov 2022Wednesday
3items
0papers
HeldOpen
10 Oct 2022Monday
14items
12papers
HeldOpen
27 Sep 2022Tuesday
16items
21papers
HeldOpen
12 Sep 2022Monday
16items
18papers
HeldOpen
11 Jul 2022Monday
22items
33papers
HeldOpen
20 Apr 2022Wednesday
20items
31papers
HeldOpen
14 Mar 2022Monday
12items
19papers
HeldOpen
7 Feb 2022Monday
17items
34papers
HeldOpen
19 Jan 2022Wednesday
21items
25papers
HeldOpen
29 Nov 2021Monday
25items
35papers
HeldOpen
15 Nov 2021Monday
0items
0papers
HeldOpen
19 Oct 2021Tuesday
4items
0papers
HeldOpen
4 Oct 2021Monday
23items
30papers
HeldOpen
5 Jul 2021Monday
16items
26papers
HeldOpen

Follow the Corporate Policy and Resources Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Spelthorne, Corporate Policy and Resources Committee

Corporate Policy and Resources Committee: 3 kinds of updateSpelthorne, sent the same day
PDF
46 papers published for 10 FebruaryCorporate Plan Progress Report and 45 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 10 FebruaryThe committee's resolutions, the day they are recorded
ABC
"corporate" found in 2 papersCORPORATE PLAN 2024-28 /25 and Corporate Plan Progress Report
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Corporate Policy and Resources Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies