Item61
Resolved
Resolved that the planning application be dealt with as shown below: P/2024/0070/FP3 Bishop Road Playing Field, Bishop Road Construction of 3.5m wide footway and cycleway facility, from Elderflower Road to Bishop Road, installation of litter bins, lighting columns, chicane barrier/bollards, cycle parking, and associated landscaping works The Development Control Manager presented the application to Members, during which a presentation was screened detailing the following: · Aerial view · Site Photographs · Proposed Site Plan The Principal Transport Officer, Policy was present at the meeting to present their case on behalf of the applicant. Grant Planning Permission Subject to the following conditions, w ith authority delegated to the Head of Planning Services to add, amend, or remove conditions as they deem necessary : 1. The works hereby permitted must be begun within 3 years of the date of this decision notice. 2. The development shall be carried out in accordance with the following application drawings/documents: · Location Plan (dwg no. 23-3002-01-003) · Bishop Road Playing Field, Planning Submission General Arrangement (dwg no. 23-3002-01-002) received 04.04.2024 · Proposed Plan (Chicane Barrier and Access Distances) · Street Lighting Design (dwg no. SHD1287-SHD-HLG-COWL-DR-EO-Lighting Layout-R1 – Rev. R1) · Bishop Road Playing Field, Planning Submission Hedgerow Re-planting (dwg no. 23-3002-01-004) received 05.04.2024 3. Prior to any above ground works taking place, a final report with details of the specific measures to minimise the spread of air-borne dust from the site during the construction period shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be implemented in accordance with the approved details. 4. All soft landscaping and proposed tree and hedgerow planting as shown on the approved plans shall be fully implemented prior to the first use of the footway facility or the first planting and seeding season post use of the footway facility if first use occurs outside of the planting season. Any trees, hedgerow, plants, or grassed areas which within a period of 5 years from the date of planting die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size, species and quality unless the Local Planning Authority gives written consent to the variation. 5. No site preparation, delivery of materials or construction works shall place outside the hours of 08.00am - 18.00pm hours Monday to Friday, 08.00am - 13.00pm hours Saturday and not at all on Sundays/Public Holidays. 6. No hedgerow removal or works that may affect nesting birds on the development site shall take place between 1 st March and 31 st August inclusive. If it is necessary to undertake works during the bird breeding season, then all hedgerow is to be checked first by an appropriately experienced ecologist to ensure no breeding birds are present. If found to be present, details of how they will be protected are required to be submitted and approved in writing by the Local Planning Authority. P/2024/0069/FP3 Cooper Street Open Space, Cooper Street Construction of Pocket Park facility at the land bound ... view the full minutes text for item 61.
Word for word from the decision St Helens published for this meeting.
Source: sthelens.moderngov.co.uk