Resolved
It was RESOLVED that application 21/00529/FPM be GRANTED planning permission, subject to the signing of a Section 106 Agreement in respect of the following: · Biodiversity net gain; · Local employment and apprenticeships; · Highways works (S278); · Travel Plan Monitoring; and · Strand 2 highways contributions, and subject to the conditions listed in the report and amended Condition 3 below, with any amendments to those conditions and/or Heads of Terms of the S106 Agreement, and the recommendations of Highway England following cessation of their holding direction, being delegated to the Assistant Director of Planning and Regulation: 3. No development shall take place (including site clearance) until a detailed Construction and Traffic Management Plan (CTMP) produced to CLOCS standards, has been submitted to and approved in writing by the Local Planning Authority. Thereafter the construction of the development shall only be carried out in accordance with the approved CTMP. The Construction Management and Traffic Plan shall include details of the following: a) Map showing the location of construction traffic routes to and from the site, details of their signing, monitoring and enforcement measures; b) Access arrangements to the site; c) Traffic management requirements; d) site set up and general arrangements for storing plant including cranes, materials, machinery and equipment, temporary offices and other facilities; e) Details of provisions for temporary car parking, loading/unloading and vehicle turning areas; f) Details of hoarding; g) Control of dust and dirt on the public highway; h) Siting and details of wheel washing facilities; i ) Cleaning of site entrances, site tracks and the adjacent public highway; j) Timing of construction activities (including delivery times and removal of waste); k) The estimated number and type of vehicles per day/week; l) Details of any vehicle holding area; m) Details of the vehicle call up procedure; n) Access and protection arrangements around the site for pedestrians, cyclists and other customers; o) Coordination with other development projects in the vicinity; p) Post construction restoration/reinstatement of the working areas and temporary access to the public highway; q) Where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, pedestrian routes and remaining road width for vehicle movements; r) Construction programme and phasing plan; s) Details of consultation and complaint management with local businesses and neighbours; t) A Site Waste Management Plan (SWMP) including mechanisms to deal with environmental impacts such as air quality and dust control measures, noise and vibration restriction measures, light and odour and predicted and latterly actual waste arisings and how this is to be managed and where it is sent to; u) Details of any proposed piling operations, including justification for the proposed piling strategy, a vibration impact assessment and proposed control and mitigation measures; and v) A bespoke communication strategy for the occupiers at Foxholm . In particular, contact details for site manager, notice of noisy or disruptive works and air quality mitigation during construction.