Resolved
RESOLVED that planning permission be GRANTED subject to the following conditions and informatives : 1 The development hereby permitted shall be carried out in accordance with the following approved plans: BMS-MB 05; BMS-MB 06; 2 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 3 The materials to be used in the construction of the external surfaces of the proposed development hereby permitted shall as per the submitted plans and associated documents to the satisfaction of the Local Planning Authority. 4 If the implementation of this planning permission would result in the Published Admissions Number (PAN) exceeding 270 students then a further planning application shall be submitted to the Local Planning Authority to assess any potential impacts. 5 No demolition or construction work, including site clearance and demolition, that is audible at the site boundary, relating to this permission shall be carried out on any Sunday, Public or Bank Holiday nor at any other time, except between the hours of 07:30 and 18:00 on Mondays to Fridays and between the hours of 08:00 and 13:00 on Saturdays. These restrictions also apply to deliveries arriving at, and leaving, the site. 6 Any installation of air-conditioning units, air-handling units or any plant and machinery, shall be subject to the following: For areas above WHO Guideline levels, where the existing external ambient noise level exceeds WHO Guideline levels of either LAeq , 16hrs 55dB daytime (07.00-23.00 hrs) or LAeq , 8hrs 45dB night-time (23.00-07.00hrs). (1) Where noise emitted from the proposed plant and machinery will not contain tones or will not be intermittent, the 'A' weighted sound pressure level from the plant and machinery (including non-emergency auxiliary plant and generators) hereby permitted, when operating at its noisiest, shall not at any time exceed a value of 10 dB below the minimum external background noise, at a point 1 metre outside any window of any residential and other noise sensitive property, unless and until a fixed maximum noise level is approved in writing by the City Council. The background level should be expressed in terms of the lowest LA90, 15 mins during the proposed hours of operation. The plant-specific noise level should be expressed as LAeqTm , and shall be representative of the plant operating at its maximum. (2) Where noise emitted from the proposed plant and machinery will contain tones or will be intermittent, the 'A' weighted sound pressure level from the plant and machinery (including non emergency auxiliary plant and generators) hereby permitted, when operating at its noisiest, shall not at any time exceed a value of 15 dB below the minimum external background noise, at a point 1 metre ... view the full minutes text for item 5.