Agreed ( i ) - Cabinet agree to the redevelopment proposals on each of the sites within the parameters as detailed with the report at Appendix A. Agreed (ii) - In agreeing to ( i ) above, Cabinet grants delegated authority to the Director of Housing Development & Growth, in consultation with the Cabinet Member for Housing, Regeneration and Planning to agree the final scheme design for each of the sites. Agreed (iii) - Cabinet grants delegated authority to the Director of Housing Development & Growth, in consultation with the Cabinet Member for Housing, Regeneration and Planning to enable the successful delivery of the scheme by agreeing the steps identified in the report at 3.4.
Word for word from the decision Stoke-on-Trent published for this meeting.Source: moderngov.stoke.gov.uk
+218.790 Note Screening Site plan shows Level 1 floor plan. Refer to planting to 1SK2-MHA-XX-X-DR-02-001 for full GA floor plans and bin store statistics.
℄ ℄
Cycle ℄ ℄ Existing parking area to be lined out to create Store Bin store 2 13 spaces allocated to new development plus Parking 8 spaces retained for bungalows 26-33 24 parking spaces for proposed development including 3 accessible 1:20 (52% of total 46 flats) +219.10 36m +219.425 1:80 +219.350 1:20 8 spaces for existing bungalows including 2 accessible spaces.
Accessible bays Above figures are to determine overall provision; spaces on adopted +220.050 highway will not be allocated other than to define accessible bays. D D 4 covered cycle stands (9%) Stair 1
Refu ECP denotes charging point for electric vehicles to M&E engineers' +220.120 +218.700 se v details. ehic le sw ept p 26 ath Bin storage
m 34.5 Bin Store 1: Ne w 4 x 1100 litre general waste
1: dr
20 220.40+ op 4 x 770 litre recycling ke Drop-off layby 27 rb +218.580 Bin Store 2: +219.350 25 4 x 1100 litre general waste +220.470 Accessible bays 4 x 770 litre recycling Turning and refuse collection area D Bin Store 3: D 2 x 1100 litre general waste +220.000 +218.410 4 x 770 litre recycling 28 +219.425 Entrance New Provision is calculated on 1.1 x 1100 litre per 10 persons and 1.3 x 1:20 drop 770 litre per 10 persons. Assumed occupancy is approximately 92 +218.210 kerb +220.050 persons (30 x 1 bed 2 person flats and 16 x 2 bed 3 person flats = +218.165 maximum possible occupancy of 108 with 0.85 diversity factor Riser
24 Riser
Lift Lift +218.375 1:15 applied based on over-55s user group). 11 +218.120 Bin store 3 shown with lower capacity to minimise number of 12 +220.050 13 receptacles requiring movement over longer distance to collection Screening planting to point.
Retaining wall +220.050 bin store Reinforced grass vehicle access route to Bin Refuse vehicle swept path tracking
1:80 1:2
plant room store 1 0
+218.450 29m Vehicle tracking is based upon Phoenix 2-23W with Elite 2 6x2 Service access to plant room RS chassis (10.250m L x 2.530m W) +219.620 Trees
1:15 23 Stair 2 +220.050 Refer to arboricultural impact assessment for full details of works to existing trees. + +218.785 15 14 223.200 +218.815 Denotes existing trees to be removed.
g 5
wa ainin 1:1 +219.900
et ll wr +223.20022 Line of level change: +222.34
Lo +222.170 3-storey to north; Screening planting to +219.150 2-storey to south bin store 29m +219.200 Denotes existing trees to be retained 1:15 subject to recommendations of +219.900 arboricultural report. External steps +219.535 Bin store 3
7 +219.580 + 1:15 223.200 UP +219.900 21
16 +222.330 +221.760
+221.625 2 20 P7 2020-11-06 Stairs revised and pathways adjusted to suit. DJW PC
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.