Agreed ( i ) - That cabinet approves the procurement approach, in accordance with City Council procurement policy. Agreed (ii) - That Cabinet grant delegated authority to the Director of Public Health, in consultation with the Cabinet Member for Strategy, Economic Development, Culture and Sport, to award the relevant contract following the procurement exercise for the required full resurfacing of the 3G carpet at Dimensions Leisure Centre.
Word for word from the decision Stoke-on-Trent published for this meeting.Source: moderngov.stoke.gov.uk
DIMENSIONS LEISURE CENTRE QUOTE FROM SIS PITCHES +44 (0)1900 812 796 [email removed] www.sispitches.com LARGEST THE UK’S ONE-STOP SHOP FOR SPORTS PITCHES AND SURFACES DESIGN
1 SIS Pitches offer the definitive end-to-end solution for both synthetic pitch new build and resurface projects including a full design and pre/post planning support service.
MANUFACTURE
2 SISTurf synthetic surfaces are produced by our specially trained staff, in our UK factory with the most modern synthetic grass backing line in Europe. SISTurf products use yarn of the highest quality and meets all governing body performance standards.
CONSTRUCT
3 We have the capability to construct synthetic pitches in-house from project start to completion. We always provide a dedicated on-site supervisor ensuring the highest quality workmanship, stringent quality control and on-time delivery.
4 INSTALL Installation of our SISTurf synthetic systems is completed by our dedicated in-house installation teams using the latest machinery and innovations in the industry.
5 MAINTAIN SISPlus packages offer regular pitch inspections, reports and tailored maintenance regimes for your project. We only use our own skilled personnel, specialist equipment and SISPlus online maintenance portal to provide the ultimate aftercare solution. FAO Lyndsey Bradbury & Roger Moore JOB REFERENCE: 23-5042 Dimensions Leisure Centre Scotia Road Burslem Stoke-on-Trent 18th July 2023 ST6 4ET
Dear Lyndsey/Roger Proposed resurface of 3G synthetic grass pitches at Dimensions LC Further to your recent request we now provide our revised quotation for the above project. In providing this information we confirm the following points; 1. We have based our offer on our SISTurf Xtra 60 surfacing system which is tested to FIFA Quality. 2. We have assumed access is available from the south end of the pitches as per the original contract. 3. We have researched our files and it would appear that the existing shockpad was retained in 2014. We believe that the pitches were originally constructed in around 2001 meaning that the shockpad is now over 20 years old. We have therefore allowed to remove the existing shockpad and added a provisional sum for any remedial works to the existing macadam base, and a further option if a macadam overlay is required. Once the carpet has been removed we can assess the condition of the shockpad and confirm if its removal is necessary. If it is found to be in good condition (which in our experience is unlikely after over 20 years) then we will advise on the cost of isolated repairs. In this scenario the costs of macadam base repairs or overlay will not be necessary. 4. Please note that our SISTurf Xtra 60 does not require a shockpad to meet FIFA Quality. 5. As requested, our revised quotation is based on resurfacing one of the 7 aside pitches, and an additional cost to resurface both at the same time. 6. Our offer to based on recent Environmental Agency recommendations to recycle the existing surface. 7. Our quote remains open for acceptance for 30 days.
We are a successful British manufacturer, employing many local people at our factory and head office in the North West. Support British industry and British jobs. The above offer is subject to our standard terms and conditions and agreeing a suitable payment schedule. We trust that the above offer is clear and we now look forward to receiving your further instructions. If you have any queries or require any further information please contact the undersigned on [phone removed] or [email removed]
Yours sincerely,
Stephen Spaven Sales Director SIS (UK) Ltd Quotation Summary Dimensions LC - Resurface of Existing AGP 1 nr 60 x 45m - Total Area: 2,700m2
Amount Section Description £ Preliminaries - Includes for mobilisation, site 1 supervision, heras fencing, site accommodation, lop 11,593.80 back tree branches.
Carpet Uplift - Allowance to remove the existing 2 11,881.08 synthetic carpet.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.