Resolved
DECISION It was unanimously agreed that planning permission be GRANTED subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with Section 91 of the Town and Country Planning Act 1990. The District Planning Authority does not consider that there are overriding reasons to set a different duration for the permission. 2. The development shall not be occupied until the existing vehicular access to the site has been remodelled so as to provide an access width of 5.0 metres for a distance of 15.0 metres into the site , measured from the near edge of the public highway carriageway. Reason: In the interests of highway safety. 3. The building hereby permitted shall not be brought into use unless and until the access has been surfaced with a bound asphalt, bitumen or macadam material for a distance of 15.0 metres into the site, measured from the near edge of the public highway carriageway. Reason: In the interests of highway safety. 4. The access to the site for vehicles shall not be used until it has been provided with not less than 6.0 metre radius turnouts on each side. Reason: In the interests of highway safety. 5. The access to the site shall not be reconstructed in such a manner as to reduce the effective capacity of any drain or ditch within the limits of the public highway. Reason: In the interests of highway safety. 6. The building hereby permitted shall not be brought into use until visibility splays have been provided to the vehicular access to the site with an ‘x’ distance of 2.4 metres and ‘y’ distances of 160.0 metres to the near edge of the public highway carriageway. No structure, tree or shrub shall be erected, planted or retained within the splays exceeding, or likely to exceed at maturity, a height of 0.6 metres above the level of the public highway carriageway. Reason: In the interests of highway safety. 7. The development shall not be occupied until a turning area has been provided within the site so as to enable vehicles to leave and re-enter the public highway in a forward gear. Reason: In the interests of highway ... view the full minutes text for item 247.