Resolved

That no further action be taken. A short adjournment was taken at 11.20 a.m.
Word for word from the decision Stratford-on-Avon published for this meeting. Source: democracy.stratford.gov.uk

Follow this further

Built from Stratford-on-Avon's papers

What the report saysPro

Report to Overview and Scrutiny Committee

OVERVIEW AND SCRUTINY COMMITTEE 23 APRIL 2014

Subject: Stratford-on-Avon Leisure and Visitor Centre Lead Officer: Tony Perks Contact on 01789 260620

Lead Member: Councillor L Organ

Summary This report provides additional information requested to support the call-in of The Cabinet decision relating to the future of the Stratford Leisure and Visitor Centre.

1 Background/Information 1.1 At its meeting of 7 April 2014, The Cabinet considered a report on the future of Stratford-on-Avon Leisure Centre. In summary, The Cabinet:- • Endorsed the revisions to the previously agreed design; • Agreed the tender evaluation criteria; • Agreed to invite tenders for the project; • Agreed to award the contract subject to it being deliverable within the agreed budget. Full details are available within The Cabinet report and Minutes. 1.2 This decision has now been called in for review by the Overview and Scrutiny Committee who has requested further details about the additional expenditure and project delays that could result from a change in the design of the changing area and further details of the user engagement exercise. 1.3 Design Costs and Delays 1.4 During the feasibility phase of the project, a range of design options were explored and these were presented to The Cabinet which endorsed a preferred option at its meeting of 3 December 2012. 1.5 This option included a village change facility which is integral to the design that has been developed. It has enabled a number of facilities to be created; an example of which is the additional studio space. It has also, to a large extent, determined the services strategies for the building, as well as being integral to the cost-modelling. 1.6 It would be possible to produce a design for a re-modelled leisure centre built around either separate male and female changing, or separate male, female and family changing but this would be a different design to the one currently in place. 1.7 The interdependency of spaces means that it is not good practice to re- design the changing element in isolation. 1.8 A re-design would not necessitate going right back to the beginning, as elements of the work carried out could be reused, examples of which include survey work and circulation analysis. However, significant re- design would be required to ensure that we produce a holistic design that fits within the acceptable cost envelope. 1.9 Appendix A attached sets out an estimate of the revised design costs and project programme that could be reasonably anticipated. These estimates are based on evidence supplied by MACE the appointed project managers for the project. Their report is attached as Appendix B. 1.10 Consultation Responses 1.11 The consultation attracted 104 responses. Of these 86% of respondents were in favour of the overall scheme. Within this number, when asked specifically about the village change, 54% expressed a negative preference. 1.12 When this was presented to The Cabinet, the interpretation of this was ‘that overall, 86% of respondents support the scheme as designed, 54% of respondents would prefer single sex changing but when viewed as a whole they supported the scheme’. 1.13 This is supported by the feedback that indicated that only 22% of respondents stated that they were ‘not likely’ to use the village change facility. 1.14 Since The Cabinet meeting it has since been suggested that this data could be interpreted that the 86% supported for the scheme was conditional on single-sex changing being retained.

2 Conclusion 2.1 It would be possible to re-design the project to include separate sex changing rooms and Appendix A estimates the financial and time consequences of this. 2.2 Any revised proposals would need to be subject to further consultation. There is a risk that feedback from this consultation would generate further issues that would need to be addressed by further re-design work.

Tony Perks HEAD OF TECHNICAL SERVICES APPENDIX A

Estimated Revised Time Line

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Leisure Centre: Call-inReport 47 KB DownloadRead as text
PDF
MACE SDC: Changing Village RedesignReport 149 KB Download

At this meeting

Whole meeting

On this subject at Stratford-on-Avon

Search all
  1. Leisure Centre - Call-inThis decision
  2. Solar Panel Installations at Southam and Studley Leisure CentresApproved
  3. Shipston Leisure Centre Solar Panel Match FundingDecided
  4. Solar Canopies at Stratford Leisure CentreAgreed
  5. Proposed Lease of Land at Southam Leisure CentreDecided
  6. Re-opening of Leisure CentresApproved

More from Stratford-on-Avon Overview and Scrutiny Committee

All decisions
MeetingDecisionOutcome
28 Oct 2026 Urgent BusinessThat, pursuant to Section 100A (4) of the Local Government Act 1972 (as amended), the public be excluded from the rem... Noted Open
2 Sep 2026 Cost of LivingThat, in principle, a Task and Finish Group on the Cost of Living would be formed at the next meeting of the Overview... Decided Open
2 Sep 2026 Urgent Business - The Three TunsThat, pursuant to Section 100A (4) of the Local Government Act 1972 (as amended), the public be excluded from the rem... Noted Open
27 May 2026 Start time of meetingsThat the meetings of the Overview and Scrutiny Committee during 2026/27 commence at 10.00 a.m. Decided Open
27 May 2026 The Cabinet Meeting - 13 April 2026It was agreed that the Climate Change Project Officer would be asked to provide an assessment of the project. It was ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies