That, subject to the completion of a Section 106 Agreement to secure the following: · Affordable housing (35% units); · Highway contributions – to be confirmed following receipt of final comments from the highway authority, but to include provision of £6,000 for a Traffic Regulation Order (seeking to extend the 30mph speed limit further west away from the new site access); · Education – approximately £390,556 towards Early Years, Primary and Secondary SEN education provision; · Provision, management and maintenance of public open space on-site (LAP/LEAP and amenity/incidental), and SUDS area; · Contribution towards off-site Youth and Adult active use play facility; and · Libraries – approximately £25,433 for Bidford Community library; Planning Application 13/03323/OUT be GRANTED subject to the following (the detailed wording of which be delegated to Officers): · the 28 conditions contained in the report, as amended by the deletion of condition 19 in accordance with the update sheet; · the additional condition agreed at the meeting for the provision of access arrangements for emergency vehicles; and · the 3 notes contained in the report. A further note would be added to clarify that in seeking to discharge additional condition 29, Members were not satisfied with the provision of emergency vehicular access solely from Salford Road as shown on the ... view the full minutes text for item 503.
Word for word from the decision Stratford-on-Avon published for this meeting.Source: democracy.stratford.gov.uk
Five Year Housing Land Supply Position The District Council has published its Five Year Housing Land Supply Calculation Summary (as of 30 September 2014) confirming the District has a 5 year housing land supply. The full information notes are attached at Appendixes 1-3.
13/03323/OUT – 18 Salford Road, Bidford-on-Avon
Members’ Site Visit
A Members’ site visit was undertaken at 09:30 on Wednesday 26 November and was attended by Councillors Pemberton (Committee Chairman and Ward Member), Matheou, Cargill, Gittus, Payne and Kerridge. The Planning Case Officer and Ben Simm, the relevant Highway Engineer from Warwickshire County Council, were also present.
Members approached the site on foot from the east and observed other development along Salford Road. Volumes and speed of traffic along the highway were noted. The extent of the site frontage was clarified and plans of the new access road junction were viewed. Visibility in both directions was considered and Members were advised of the proposed position of the new pedestrian refuge and bus shelters to the west of the entrance. Members then entered the site and walked through to the bottom of the rear garden, noting the neighbouring properties as they did so. From the rear boundary the extent of the site was clarified. Members noted the topography of the site, location of boundary planting, type and location of adjoining dwellings and existing land uses/buildings. The likely position of SUDS drainage features was noted having regard to the illustrative layout plan. Members then either drove or walked to the location of the proposed pedestrian/cycle link onto The Meadows. Those on foot noted the location of the pedestrian path from Victoria Road through to Westholme Road (from where it continues through to the Primary School) en route. The legal status of the access track was clarified and Members noted its location and physical characteristics. The location and appearance of houses adjoining the site were noted and the route of the public footpath along Marriage Hill to the west was highlighted.
Third party responses
7 additional letters of objection received, raising the following additional points not already summarized in the agenda:-
• New application for 75 houses at Marriage Hill Nurseries – both schemes will mean traffic chaos. • Salford Road is a B Road but carries A road levels of traffic • Only single in-out route to the site • Emergency access along pavement of main access unsafe and undesirable • Wider bellmouth will encourage higher speeds for traffic turning into the site which would be dangerous • New estate should have 20mph speed limits • Smaller scheme of less than 75 units would be more appropriate
Page 1 of 3 • Danger to children at bus stops • Loss of privacy to Gable Mews • Concerns/recommendations in sections 6.1 and 6.2 of Road Safety Audit re need for right turn lane haven’t been addressed • Noise concerns and lack of noise mitigation for neighbouring properties
6 letters of support have also been received making the following additional points:
• Will attract new customers to local shops, businesses and services in village • Will support the vitality and sustainability of the village centre and local jobs • Will provide around 50 affordable housing units • Creation of construction jobs and follow-on benefits to the local economy
Additional consultation response
A further consultation with an independent highway consultant has been carried out who was asked to assess the junction design and the information regarding the tracking drawings for lorries (specifically large refuse vehicles) into and out of the site from Salford Road. His conclusions are summarized as follows:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.