That the lighting scheme for the Tramway Bridge be reinstated, as per the original design concept, with programmable coloured lighting and that this should be fully functional by April 2016, in time for the 400 th anniversary of Shakespeare’s death. NOTE: This item is subject to call-in to the OSC
Word for word from the decision Stratford-on-Avon published for this meeting.Source: democracy.stratford.gov.uk
(1) That a preferred works option from section 2.1 of the report is selected.
(2) That a preferred resolution option from the Exempt Appendix - Section 2.2 is selected.
1 Background 1.1 As part of the World Class Stratford initiative, a scheme of feature lighting was installed on the Tramway Bridge. 1.2 The scheme was designed and installed in 2010 by a company called Urban Projects and the project was managed by another company called Bridges Pound. The cost of the works was £137,927.46. 1.3 The installation was initially successful; however, the lighting scheme developed problems and became unreliable. The lighting scheme currently has only limited functionality. 1.4 During the defects liability period, Urban Projects made a number of attempts to remedy the defects within the installation; however, the result was never fully satisfactory and Urban Projects eventually reached the point where they refused to carry out any further work. 1.5 In view of this, an expert investigation and report was commissioned to establish what was wrong with the installation and what needed to be done to provide a reliable lighting scheme. Details of the findings in relation to this report and resolution options are identified within a exempt appendix to this report. 1.6 The expert report suggests a better solution, to create a scheme that would be more reliable and estimates the cost of this works to be in the region of £84,000, plus strip-out costs in the sum of £6,000, estimated as a total of £90,000. 1.7 Alternative solutions at a lower cost are available if a simplified design is to be considered. 1.8 To resolve this matter a decisions is required; the first, to decide the scope of the remedial work that will need be carried out to ensure the lighting works effectively. A further decision will be required in relation to how to proceed in to the original contract as discussed in the exempt appendix. 1.9 In recent times, comments have been received from the public regarding the low level of general pedestrian lighting on the bridge, especially in the area close to the boat club. The general lighting is provided by fittings attached to the parapet of the bridge. SDC is currently working with WCC to increase the number of light fittings to improve this situation. 2 Options available to The Cabinet 2.1 Works options 2.1.1 To fully reinstate the lighting scheme as per the original design concept, with programmable coloured lighting. Estimated cost £90,000. 2.1.2 To install a reduced scheme of feature lighting. It would be possible to install a simpler scheme. The features would be largely dictated by budget. Examples of options that could be considered include:- Lighting the arches and providing non-programmable coloured lighting on the bridge deck that could be controlled by a timer. Estimated budget requirement £60,000; Lighting the arches and providing lighting to the bridge deck that could simply be switched on and off. Estimated budget requirement £30,000; Lighting the arches, removing the lighting to the deck and reinstating the surface of the bridge. Estimated budget requirement £12,000; Removing all feature lighting and reinstating the surface of the bridge, estimated cost £6,000; To do nothing, leave the light fittings in situ representing the former tram lines and electrically isolate the installation. The costs of this option could be accommodated within existing budgets.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Future of Southam United Football Club(1) That subject to the conditions identified in paragraph 1.4.3 of the agenda report, and subject to the above amend...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.