Resolved
That the Heat Mapping and Energy Masterplanning Study 2016, with the inclusion of the SUA.4 addendum as detailed in the ... view the full minutes text for item 605.
The Cabinet decided this item on Monday 16 January 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That the Heat Mapping and Energy Masterplanning Study 2016, with the inclusion of the SUA.4 addendum as detailed in the ... view the full minutes text for item 605.
SUA.4: ATHERSTONE AIRFIELD 1.1 A heat mapping and master planning study has been carried out for SUA.4: Atherstone Airfield. 1.2 The site is allocated in the Core Strategy as a strategic site for employment purposes. It relocates existing businesses in Canal Quarter to assist with the regeneration for the latter site, and also for B1c, B2 and B8 uses relocating from elsewhere in the district. 1.3 The study assessed the potential heat networks opportunities using the CIBSE methodology as used in the other heat mapping and master planning study and recommended by the Government’s Heat Network Delivery Unit. 1.4 Four initial heat networks options scenarios were tested to assess the heat network potential on the site. These included the following; Scenario 1: Expel Oil Seed Processing Ltd development is brought forward without the biomass CHP; Scenario 2: Assumed energy to Camgrain, Expel and RMCA developments is supplied by Expel biomass CHP and a separate network is developed for the remainder of the heat map area/site; Scenario 3: Network connects proposed Atherstone Airfield development and all Wealmoor buildings; Scenario 4: Network connects proposed Atherstone Airfield development only The initial network options assessments are presented in section 3.4 of the study. A summary of assessment of the initial network options is presented below in Table 1.
Table 1: Initial network options
Cluster Cluster name Scenario 1 Scenario 2 Scenario 3 Scenario 4 number
1 Camgrain, Expel and RMCA 2 Wealmoor 3 Atherstone Airfield 4 Aviagen and Woodyard Low carbon technology High level 25 year IRR
Biomass heat 18.2 % 6.3 % -8.6 % No IRR Biomass CHP 21.8 % 7.6 % -6.1 % No IRR Not technically GSHP 6.7 % -2.0 % -8.0 % viable
Heat offtake from Syn2gen biomass CHP (assumed Not assessed 8.8 % -1.9 % -7.1 % heat offtake tariff of 2.5 p/kWh)
1.5The findings of study conclude that at the present moment, SUA.4 is not identified as a district heating priority area. The study shows that only heat networks for scenarios 1 and 2 are likely to be financially viable for the private sector (12% and above). 1.6 Connection to the planned development for SUA.4 is likely to reduce the viability, as the businesses relocated from the Canal Quarter are anticipated to be B2/ B8 units. These types of units are not heat/ cooling intensive and tend not to have a consistent 24 hour energy demand, as energy demand in these types of units is mainly for space and hot water heating. 1.7 However, it is considered that if in the future more heat/cooling intensive businesses are to locate at the site or the Council decides to encourage more heat/cooling intensive businesses to the site, then the viability for the site as a district heating priority area should be reassessed.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Atherstone Airfield StudyReport | 74 KB | DownloadRead as text |
PDF |
Final Heat Mapping and Masterplanning Report for Atherstone AirfieldPlan | 5.9 MB | Download |
PDF |
Heat Mapping and Energy Masterplanning StudyPlan | 65 KB | Download |
Follow The Cabinet at Stratford-on-Avon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Nov 2026 | Future of Southam United Football Club(1) That subject to the conditions identified in paragraph 1.4.3 of the agenda report, and subject to the above amend... | Decided | Open |
| 2 Nov 2026 | Strategic Risk RegisterThat the , attached as Appendix 1 to the agenda report, be endorsed. Note: In accordance with the Council’s Constitut... | Decided | Open |
| 2 Nov 2026 | Options for Boosting the Supply of Housing Land Update Report(1) That the progress in delivering the Housing Land Supply Action Plan, the September 2026 housing land supply calcu... | Noted | Open |
| 2 Nov 2026 | Youth Catalyst Project – Service Specification and Permission to Tender(1) That permission to procure a Youth Catalyst Project provision to meet the requirements of the specification, as d... | Approved | Open |
| 2 Nov 2026 | Revenue Budget Monitoring Period 1 - 6 2026/27(1) That the actual net variance as at Period 6, and the estimated revenue outturn for 2026/27, be received; and (2) ... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.