(i) That planning permission be granted for application No. B2005/55178/FUL, subject to the conditions set out in the Appendix to these Minutes. (ii) That the committee is minded not to grant permission for any further antenna or radio base stations at this site. Councillors Hamish Pollock and Tony Shields abstained. The meeting adjourned for three minutes.
Word for word from the decision Sutton published for this meeting.Source: moderngov.sutton.gov.uk
Page 25 Agenda Item 3 DEVELOPMENT CONTROL COMMITTEE - Date:14 JUNE 2006
Item:
Report of the Executive Head of Planning, Transportation and Highways.
Ref: B2005/55178/FUL WARD: B05 / SUTTON Time Taken: NORTH 26 weeks, 1 days
Site: Helena House 348-352 High Street Sutton Surrey SM1 1PU
Proposal: Installation of a radio base station comprising three 1.7 metre high panel antennas, four transmission dish antennas, radio equipment housing and ancillary development on roof top. Applicant: Hutchison 3G (UK) Ltd. Agent: Mono Consultants Ltd.
Recommendation: GRANT PLANNING PERMISSION
1.0INTRODUCTION
1.1This application was originally reported to Sutton Area Committee on the 29 March 2006, with a recommended to grant planning permission. Following discussion, Members decided to defer the application, in order that further information on the health aspects of the proposal could be obtained, with the application reported back to the next available committee. The report to that committee is included as an appendix to this report.
2.0FURTHER INFORMATION
2.1The applicant’s agent has supplied the following additional information:
2.2“The Hutchison 3G UK Ltd Compliance Methodology is derived from the Mobile Operators Association document, "RF compliance Policy and Methodology (for UK Cellular Base Stations)", MOA 28/2000. This is the same document as referred to in the letter accompanying the ICNIRP Certificate (Referenced: FEI/MTAC/RFCG/28/2000). The document referenced 49/2001 currently exists, but is in the process of being withdrawn and superseded by a bigger and more comprehensive 28/2000.
2.3“The purpose of the two aforementioned documents and the emerging 28/2000 are to describe a common approach to RF exposure compliance assessment to be used by UK mobile network operators. The aim is to ensure that technical communication between operators and toward site-providers and the general public is consistent and sound. Its objectives are to assist operators to interpret and comply with national and international exposure guidelines and standards, facilitate the adoption of a common approach to RF compliance and define compliance methodology for site design and build. Page 26
2.4“Document 28/2000 provides a working methodology such that UK mobile phone operators will operate Mobile Phone Base Stations in accordance with the RF exposure guidelines as expressed in the EU Council Recommendation of 12 July 1999, "On the limitation of the general public to electromagnetic fields (0 Hz to 300 GHz)". The UK mobile 'phone operators will, as a minimum, build base station sites to comply with the ICNIRP public and occupational guidelines.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.