Resolved
That planning permission be granted for application No. B2007/57756/3FR, subject to the conditions, reasons and informatives set out in the Appendix to these Minutes.
Development Control Committee decided this item on Wednesday 18 July 2007. Below is the council's own wording, with the papers it was decided on.
Resolved
That planning permission be granted for application No. B2007/57756/3FR, subject to the conditions, reasons and informatives set out in the Appendix to these Minutes.
1.1Site:
1.2The site is situated on the eastern side of Grennell Road, Sutton. It compromises Greenshaw High School. The site is considerably large in area and compromises of buildings predominantly 1 and 2 storeys in height with flat roofs.
1.3The entrance to the building where the proposed work would take place is located near the main car park on the South Western part of the site. The building in this location is one storey in height.
1.4Surroundings:
1.5The school is set within a residential area, with a mixture of various styles of housing found nearby. This includes flats; semi detached, and detached homes. The school does have a separate field to the north of the site that is used for games, however the remaining adjoining properties to the school’s boundary are residential properties.
1.6Site specific UDP designation: 1.7 The school is not sited within any specific UDP designations as outlined on the adopted proposals map.
1.8Relevant Planning History:
1.9The site has a long and varied planning history that dates back to 1969. The most recent application received was under 05/54351/3FR for the erection of a front boundary fence and gates up to 2.54 metres in height, which was granted permission on the 9 August 05.
1.10The most recent application that dealt with any alterations to the front of the school was made under application 95/39255/3FR, where the Reception office at the front was enlarged. This was granted with conditions on the 23 January 1995.
2.0APPLICATION PROPOSALS
2.1Details of Proposal:
2.2The applicant seeks full planning permission a provide a new entrance to the school and to undertake associated alterations to the internal layout of the entrance.
2.3The main entrance to the school is currently through a set of double doors, located on the right hand side of the front entrance. On entering the building there is a store room to the left of the doors with a waiting area opposite and a door leading into the reception/administration office.
2.4The proposed extension would extend out 1.7m would become level with the existing building line on the front elevation. The width of the entrance would remain the same at 7.5m a height of 3.15metres. The roof will contain a mono pitched roof with a gabled front.
2.5The proposed change to the office would see an extension to the front of the building, which would provide a new entrance to the school. The extension would provide room for a smaller reception area and a registration room. The existing storeroom and entrance lobby would be demolished and replaced with an office to the left and a room to the right. The entrance to the room would be from the reception/administration area.
2.6The proposed entrance will be coloured ‘RL6005 Green’ to match the colour on the schools logo. The materials used for the extension include a durable aluminium frame with double glazed toughened walls and a mono pitched roof extending from the existing entrance canopy.
2.7Significant amendments to application since submitted:
2.8There have been no significant amendments to the application since it was submitted.
3.0PUBLICITY 3.1 Adjoining Occupiers Notified
3.2Method of Notification:
3.3A total of 11 letters were sent out to the adjoining and surrounding neighbours.
3.4Number of Letters Received: 0
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Greenshaw High SchoolReport | 405 KB | DownloadRead as text |
Follow Development Control Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Apr 2014 | Election of chairThat Councillor Hamish Pollock be elected Chair of the Committee for the duration of the meeting. | Decided | Open |
| 23 Apr 2014 | Felnex trading estate, 190 london road, hackbridge - application no. c2014/68760/fulThat planning permission be granted for application No. C2014/68760/FUL, subject to (a) the written conclusion of a ‘... | Agreed | Open |
| 23 Apr 2014 | Tauranga, the wood end, wallington - application no. d2014/68776/hhaThat planning permission be granted for application No. D2014/68776/HHA, subject to the conditions, reasons and infor... | Decided | Open |
| 23 Apr 2014 | Thomas wall park pavilion, green lane, morden - application no. c2014/69143/nmaThat planning permission be granted for application No. C2014/69143/NMA, subject to the conditions, reasons and infor... | Decided | Open |
| 23 Apr 2014 | Land at margaret's pool, corner of pound street and west street, carshalton - application no. c2014/68989/advThat planning permission be granted for application No. C2014/68989/ADV, subject to the conditions, reasons and infor... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.