To note the comments of the Strategic Planning Group and agree: (i) the Position Statement on the 5-year housing land supply in Sutton now submitted for purposes of development control and inclusion in the emerging Sutton Local Development Framework; and (ii) to forward the Position Statement to the Government Office for London.
Word for word from the decision Sutton published for this meeting.Source: moderngov.sutton.gov.uk
APPENDIX 1 POSITION STATEMENT ON HOUSING CAPACITY - 5 YEAR LAND SUPPLY (2007/8 – 2011/2012) November 2007 SUMMARY: SMALL SITES (<0.5 hectares/20 units) = 148 Units/annum 740
LARGE SITES (>0.5 hectares/20 units)
A - Large Sites Under Construction (at 1.4.07) 483
B - Large Sites with Permission/Resolution to Grant (at 1.4.07) 452
Page 11 C - Other Large Sites Suitable for Housing 307
TOTAL CAPACITY 1982
TOTAL REQUIREMENT 1725
EXCESS OVER REQUIREMENT 257
Agenda Item 6 Agenda Item 6 SMALL SITES ESTIMATE (LESS THAN 0.5 HECTARES OR 20 UNITS)
Small sites estimates formed part of the GLA Housing Capacity Study and, along with identified large sites, helped to determine the current 345 annual housing target for the Borough. The small sites capacity identified for the Borough in the GLA Housing Capacity Study was 244, based on the capacity of sites smaller than 0.5 hectares in size. For the purposes of assessing the 5-year land supply, the Council has assessed the small sites estimate on the basis of sites smaller than 0.5 hectares or with a capacity of fewer than 20 units. Completions based on the above site size/capacity criteria have the effect of reducing the annual level of small sites completions to 148 small sites per annum.
On this basis, the overall sites estimate over the 5 year period would be 5 X148 = 740 units.
Page 12 A - DWELLINGS UNDER CONSTRUCTION ON LARGE SITES (0.5 HECTARES AND OVER AND 20 UNITS OR MORE)
Reference Address Site Size Net Gain (Units) Comment (Hectares) B2004/52951 Administration 0.2 104 House, Sutton Park Road B2005/55081 18-30 Burnell Road 0.5 46 A2005/54899 Former United 0.5 39 Dairies Site, Ewell Road
Page 13 A2002/48600 Former Sewage 15.3 294 Total development (Outline) and Treatment Works & 498 minus Phases Various Later Computer Centre, 1 and 2a completed Consents Green Lane at 1.4.07 (204) Worcester Park TOTAL UNITS UNDER CONSTRUCTION 483
Agenda Item 6 Agenda Item 6 B - LARGE SITES WITH PERMISSION OR RESOLUTION TO GRANT
Location Site Area Net Gain Comment (Hectares) (Units) Sutton Court Road 0.9 256 Planning permission granted, subject to final agreement on Section 106 contributions. The site is located in Sutton town centre, adjacent to the railway station. All the land is available for re-development. Durand Close 4.5 100 Planning permission subject to phased redevelopment of existing social housing,
Page 14 involving a net gain of 203 units of which it is anticipated 100 will be built in the next 5 years. The land is available for development: a partnership including the Council and a private sector partner has been established to re-develop the sites. Kelvin House, Hackbridge 0.3 96 Planning permission granted subject to Section 106 Agreement. Site acquired by new owners. TOTAL 452 C - OTHER LARGE SITES SUITABLE FOR HOUSING
Site Site Area Net Gain Comment (Hectares) (Units) Former Orchard Hill 3.7 133 Major Developed Site in the Green Belt, Hospital Site, Carshalton which is suitable for housing and being sold by Sutton and Merton Primary Care Trust. Planning Brief prepared, with 133 units as the bottom point of the capacity range. A planning application for the development of the site is expected next year. Canon House, Manor 0.5 174 Former office block considered suitable for
Page 15 Road, Wallington Surrey mixed use, including housing. Planning SM6 8SY permission granted on appeal 8 May 2007. TOTAL 307
Agenda Item 6 Page 16 This page is intentionally left blank
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Domestic Violence - Strategic Options(i) That the proposals set out in paragraphs 4 to 6 in the report be endorsed; (ii) To agree to forward the report to...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.