Resolved
(i) That officers draw ... view the full minutes text for item 841.
Sutton South, Cheam and Belmont Local Committee decided this item on Thursday 9 October 2008. Below is the council's own wording, with the papers it was decided on.
Resolved
(i) That officers draw ... view the full minutes text for item 841.
Page 13 Agenda Item 6
London Borough of Sutton Environment & Leisure Executive Head of Planning, Transport & Highways Darren Richards
Your Ref Direct Line: 020 8770 6455 My Ref: T3042/RT/32consultation Fax: 0208 770 6556 e-mail: [email protected] Date 22 May 2008
The Occupier Banstead Road South Please reply to: Belmont London Borough of Surrey Sutton Transport Planning & Please ask for Raj Thayaparan Works 24 Denmark Road Dear Resident, CARSHALTON Surrey SM5 2JG
Re: Informal Consultation - Banstead Road South Safety Scheme nd Further to my letter of the 22 April 2008, I am writing to you in response to a request by your Ward Councillors. It is understood that my previous letter may have contributed to several queries being raised, which I hope to clarify.
In March 2000, the Government published its road safety strategy and casualty reduction targets for 2010, which we as a Highway Authority are required to achieve. The new targets are:
• A 40% reduction in the number of people killed or seriously injured (KSI) in road accidents. • A 50 % reduction in the number of child KSI’s. • A 10% reduction in slight casualty rate expressed as the number of people slightly injured per 100 million vehicle kilometres.
During the last three years there have been thirteen reported personal injury accidents along Banstead Road South. Four involved serious injuries and nine slight injuries. Furthermore, the speed survey along the section of Banstead Road South, between West Way and The Warren, indicates that the 85%ile speed (i.e. the average speed beneath which 85% of vehicles travel) in both directions is 40.2 mph. Both, the number of accidents and the 85%ile speed are considered to be high for such a road in our borough. We had also received several requests from residents requesting that this road be considered for speed reducing measures. In response to these, the Council is proposing to introduce various speed reducing measures along Banstead Road South, which have been designed in liaison with your Ward Councillors, the emergency services and Transport for London’s Bus representatives.
The proposals include: -
1) Two speed cushions adjacent to the existing traffic island, outside property number 11, and one either side of existing pedestrian refuge outside property number 63 and 70;
E:\moderngov\Data\AgendaItemDocs\0\1\7\AI00009710\322ndConsultationLettertoOccupiers0.doc Agenda Item 6 Page 14 2) ‘At any time’ waiting restrictions at the Banstead Road South/Beeches Walk junction to help maintain visibility splays; 3) Three speed cushions across the carriageway near property numbers 22, 39, 86 and 106; 4) Four 30 mph speed activated signs near property numbers 21, 22, 121 and 134; and 5) The installation of the necessary signage for the above measures, although this will be kept to a minimum.
Speed cushions were developed by the Department for Transport (DfT) in response to the concerns from the emergency services regarding their ‘response times’ attending emergencies. Unlike other speed reducing measures that incorporate vertical deflection, speed cushions can be straddled at reasonable speeds. Hence they are unlikely to result in the breaking and acceleration associated with some other form of traffic calming measures.
Other calming measures such as ‘chicanes’ and ‘pinch points’ have been considered, but are not feasible for this road due to the location of private driveways. Mini roundabouts have also been considered. However, it is not advisable to convert existing ‘T-junctions’, where the traffic flows on the approaches differ significantly, as previous studies show that they would continue to operate as a priority junction. This may give some drivers emerging from the side road a false sense of security in respect of traffic approaching them from their left.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
32 2nd Consultation Letter to OccupiersReport | 108 KB | DownloadRead as text |
PDF |
Banstead Rd Report 091008Report | 73 KB | Download |
Follow Sutton South, Cheam and Belmont Local Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 11 Jun 2026 | Minutes of the previous meetingthat the minutes of the meeting held on 5 February 2026 be agreed as an accurate record. On behalf of the Committee, ... | Agreed | Open |
| 5 Feb 2026 | Minutes of the previous meetingthat the minutes of the meeting held on 18 September 2025 be agreed as an accurate record. | Agreed | Open |
| 18 Sep 2025 | Minutes of the previous meetingRESOLVED : That the minutes of the meeting held on 3 July 2025 be agreed as an accurate record. | Agreed | Open |
| 3 Jul 2025 | Minutes of the previous meetingRESOLVED : that the minutes of the meeting held on 3 April be agreed as an accurate record. | Agreed | Open |
| 3 Apr 2025 | Minutes of the previous meetingRESOLVED : that the minutes of the meeting held on 6 February 2025 be agreed as an accurate record. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.