That funding of £25,500 be allocated from the Public Realm budget 2012/13 to construct the zebra crossing, as detailed in Drawing T20090/FEA/04, subject to a satisfactory consultation . It was noted that, subject to consultation, it was hoped to construct the zebra crossing in the school summer holidays.
Word for word from the decision Sutton published for this meeting.Source: moderngov.sutton.gov.uk
Report to St. Helier, The Wrythe and Wandle Valley Local Committee
Page 7 Agenda Item 7
Report to: St. Helier, The Wrythe & Wandle Valley Local Committee
Date: 31 May 2012
Report of: Executive Head of Planning and Transportation
Ward Location: Wandle Valley Author(s) and Contact Phone Number(s): Paul Tugwell – 020 8770 4122
Area Served: St. Helier Chair of the Committee: Anisha Callaghan
Report title:
Green Wrythe Lane (Adjacent to Shaftesbury Road) – Proposed Pedestrian Crossing
Summary This report informs Members of several proposals to introduce a pedestrian crossing along Green Wrythe Lane (adjacent to Shaftesbury Road).
Recommendations It is recommended that funding is made available from the Public Realm Budget in 12/13, so the proposed zebra crossing is progressed to implementation (subject to a satisfactory statutory consultation). Background Documents and Previous Decisions Minute references 884 and 304 of the St. Helier, The Wrythe and Wandle Valley Local Committee of the 4 October 2011 and 27 March 2012, respectively. At the last meeting it was resolved to “To proceed with a design study for a zebra crossing across Green Wrythe Lane, at a location either North or South of Shaftesbury Avenue, at a cost of £2,500, the results of the study to be made available to be part of the agenda for the meeting of the Local Committee on 31 May”.
Signed:
Strategic Director of Environment and Neighbourhoods Date:
PT/T20090-M393/final- 120518 Agenda Item 7 Page 8
1. Background On the 18 January 2012, public realm funding was allocated towards a feasibility study, for the introduction of a zebra crossing along Green Wrythe Lane, adjacent to its junction with Shaftesbury Road.
2. Issues It has previously been established that a zebra crossing would not meet the ‘Department for Transport’s’ criteria for their introduction. However, a recent pedestrian crossing count showed that during 8am and 9am, 54% of the 61 people who crossed the road, were children.
3. Options Considered Consideration has been given to the following options:-
• Option 1 - the realignment of the kerbline to the north of the junction, with the ‘Give Way’ lines offset (Shaftesbury Road (East)) and a pedestrian crossing facility just to the north of the junction. This would reduce the distance that pedestrians need to cross (just south of the junction), would highlight the established crossing point, would improve driver/pedestrian visibility and would improve the visibility of drivers exiting the side road. The budgetary estimate for this proposal is £13,300.
• Option 2 – the realignment of the kerbline to the east of the junction, with the ‘Give Way’ lines offset and a pedestrian crossing facility just to the north of the junction. This would have the same benefits as option 1. The budgetary estimate for this proposal is £18,000.
• Option 3 – the realignment of the kerbline to the east of the junction, enabling the existing ‘Give Way’ lines to be offset and the introduction a pedestrian crossing just to the south of the junction. This would have the same benefits as options 1 and 2. The budgetary estimate for this proposal is £15,000.
• Option 4 – the introduction of a zebra crossing adjacent to property number 456, incorporating a kerb buildout along the inside of the bend. This would meet the ‘Department for Transport’s’ requirement of locating the crossing 10 metres from the junction (allowing drivers to straighten up at the stopline, when exiting the side road). This option would result in the loss of one on-street parking space, but would introduce a legal obligation on drivers to stop, should pedestrians be waiting to cross the road. The budgetary estimate for this proposal is £25,500.
• Option 5 – the introduction of a pedestrian refuge, just south of the junction. This would enable pedestrians to cross the road in two stages, requiring them to only look in one direction at a time. The budgetary estimate for this proposal is £15,500.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow St. Helier, The Wrythe and Wandle Valley Local Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.