That planning permission be granted for application No. D2011/64908/FUL, subject to (a) the written conclusion of a ‘section 106’ agreement within a period of six months from the date of this decision, or such longer period as may be agreed in writing by the Executive Head of Planning and Transportation, after which time the decision to grant planning permission will be rescinded; and (b) the conditions, reasons and informatives set out in the Appendix to these Minutes.
Word for word from the decision Sutton published for this meeting.Source: moderngov.sutton.gov.uk
1.1Site and surroundings: 1.2 The Beddington Sewage Treatment Works (hereafter STW) is located within a large area of open land to the west of Beddington Lane. The Beddington Lane Industrial Area is located to the east of Beddington Lane. The Beddington Lane Asda superstore is also located to the east of the site.
1.3There is a Scheduled Ancient Monument (hereafter SAM) site immediately to the south of the proposed development. This area is currently used as sludge beds. There is residential development to the south of the SAM site. There are views of the rear of some of the houses in Crispin Crescent from the application site. These houses are some 310 to 320 metres to the south of the proposed Dutch Barns. There are also two smaller groupings of residential houses immediately to the east of the Beddington STW. The nearest is some 146 metres from the easterly proposed Dutch Barns. These distances have been measured from the rear building line of the houses; each house has a rear garden area.
1.4Humus beds lay immediately to the west of the larger proposed building. It is understood these beds are no longer used. Whilst there are a number of trees in this area their low height means they would not screen the buildings from the proposed Country Park. The proposed Wandle Valley Regional Park lies to the west of the humus beds; this area of land is subject of the 2012 resolution to grant planning permission reference D2005/54794/FUL for the extension of the existing waste management centre comprising the construction of a plant for the anaerobic digestion of household waste and two additional gas engines, the lateral extension of landfill activity to encompass a lagoon, the export of clay from the base of the existing landfill phases and formation of a temporary clay stockpile, revisions to the landfill phasing plan and extension of the duration of waste management activities at the site to 2023.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.