Resolved
to defer decision on the introduction of the scheme until next meeting to permit further consultation
Sutton South, Cheam and Belmont Local Committee deferred this item on Thursday 11 October 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
to defer decision on the introduction of the scheme until next meeting to permit further consultation
Page 17 Agenda Item 6
Report to: Sutton South, Cheam and Belmont Local Committee
Date: 11 October 2012
Report of: Executive Head of Planning and Transportation
Ward Location: Author(s) and Contact Phone Number(s): Belmont Lynn Robinson 020 8770 6461
Area Served: Chair of the Committee: Belmont Councillor Tony Shields
Report title: Brighton Road Belmont – Proposed shared use footway for pedestrians and cyclists
Summary This report outlines the results of a public consultation to allow cyclists to share the footway with pedestrians on the western side of Brighton Road between Downs Road and Hulverston Close and on the east side of Brighton Road between the borough boundary and Downs Road. The report recommends to agree to allow cycling on both sections of shared use footway and implement the route ensuring there are adequate measures installed to minimise any possible conflict between cyclists and pedestrians.
Recommendations a. Note the comments received during the consultation, as detailed in Appendix A; b. Agree to allow cycling on the footway as shown on drawing no. T30040/REP/01 under Section 66 (4) of the Highways Act 1980 and designate the new unsegregated cycle / pedestrian shared facility under Section 65 (1) of the Highways Act 1980 and proceed to implementation; c. Delegate authority to the Executive Head of Planning and Transportation, in consultation with the Chair and Ward Councillors, to agree the final scheme and make any changes necessary as a result of detailed site surveys. Agenda Item 6 Page 18
Background Documents and Previous Decisions None
Signed:
Strategic Director Date:
1. Background 1.1 The Council has a number of policies to promote the use of sustainable transport and encourage more trips by bicycle and on foot. There is an existing section of off-road shared use footway in Brighton Road between Hulverston Close and The Downsway. This is part of an east – west cycle route between Cheam and Roundshaw. There is an existing shared use footway along the A217 between the borough boundary and Banstead. To expand the off road cycle facility in this area and link these two existing sections of cycle route, two schemes were submitted in the Local Implementation Plan (LIP) bid to Transport for London to install a second and third section of shared use footway on Brighton Road between Hulverston Close and Downs Road and between Downs Road and the borough boundary with Surrey. 1.2 The Council has been allocated £60,000 for the scheme – ‘New Cycle Route – Belmont’ in the 2012/13 Local Implementation Plan programme from Transport for London to establish a cycle route between Sutton and Belmont. And the Council has been allocated £5,000 for the scheme – ‘New Cycle Route – Brighton Road, Belmont’ to establish a cycle route between Downs Road and the borough boundary. 1.3 Initial discussions with the Ward Councillors found their preferred route for an off road cycle route was to construct a cycle track alongside the railway line between Epsom Downs and Sutton as a good, safe and attractive off-road cycle facility. Officers investigated the concept but found in the short term this route was not possible due to the site constraints and difficulty in providing more access points whilst the railway line was still operating the train service. 1.4 A site meeting with the Ward Councillors agreed that, as the railway option was not viable, the next direct available route between the borough boundary and Sutton was to use the footways on Brighton Road. The object of the scheme is to link existing sections of cycle route to establish a continuous route from Banstead to South Sutton and link to other borough cycle routes to the east and west of Brighton Road.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Brighton Road report finalReport | 92 KB | DownloadRead as text |
PDF |
SUMMARY of footway consultationrevAReport | 32 KB | Download |
PDF |
T30040_REP_001_A_190912_ISSUEReport | 3.3 MB | Download |
Follow Sutton South, Cheam and Belmont Local Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 11 Jun 2026 | Minutes of the previous meetingthat the minutes of the meeting held on 5 February 2026 be agreed as an accurate record. On behalf of the Committee, ... | Agreed | Open |
| 5 Feb 2026 | Minutes of the previous meetingthat the minutes of the meeting held on 18 September 2025 be agreed as an accurate record. | Agreed | Open |
| 18 Sep 2025 | Minutes of the previous meetingRESOLVED : That the minutes of the meeting held on 3 July 2025 be agreed as an accurate record. | Agreed | Open |
| 3 Jul 2025 | Minutes of the previous meetingRESOLVED : that the minutes of the meeting held on 3 April be agreed as an accurate record. | Agreed | Open |
| 3 Apr 2025 | Minutes of the previous meetingRESOLVED : that the minutes of the meeting held on 6 February 2025 be agreed as an accurate record. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.