CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Sutton
Development Control Committee, Wednesday 17 July 2013 at 7.30pm

1, 4, 6, 10, 11, 24, 25 AND 26 SAWTRY CLOSE AND 45 AND 118 TITCHFIELD ROAD, CARSHALTON - APPLICATION NOS. C2013/67321, 67320, 67318, 67314, 67322, 67317, 67227, 67319, 67316 AND 67315/3FR

Decided Planning 1 paper

Development Control Committee decided this item on Wednesday 17 July 2013. Below is the council's own wording, with the papers it was decided on.

Item710

Resolved

That planning permission be granted for application Nos. C2013/67321, 67320, 67318, 67314, 67322, 67317, 67227, 67319, 67316 and 67315/3FR, subject to the conditions, reasons and informatives set out in the Appendix to these Minutes.
Word for word from the decision Sutton published for this meeting. Source: moderngov.sutton.gov.uk

Follow this further

Built from Sutton's papers

What the report saysPro

Report to Development Control Committee

Background

2.1Site and surroundings:

2.2The application sites comprise two storey terrace houses faced in either red or yellow brick with tiled pitched roofs. The houses each had previously existing Agenda Item 11 Page 124

single storey rear extensions and their recent replacement is the subject of these applications.

2.3The sites are located in the St Helier Estate, which is characterised by inter-war two storey terraced housing, mostly faced in either red brick or brown brick, although some are currently faced in painted timber or render.

2.4Site Specific Designation:

2.5None.

2.6Relevant Planning History:

2.7None.

3.0APPLICATION PROPOSALS

3.1Background to Proposals:

3.2Timber box bathrooms were installed during the 1960s to terraced and semi- detached houses built during the 1930s in order to provide an attached bathroom. Those existing pod units installed in the 1960s are now far beyond their economic life. Typical problems relate to moisture ingress such as decayed timber elements, leaking roofs and structural distortions. Between 2004 and 2007 some 200 of these units were replaced with a larger 4m deep pre-fabricated pod incorporating a bathroom and utility room. However, this type of pod had disadvantages as it took 3 or 4 days to install and involved the assembly of pre- fabricated parts within the rear gardens once the existing pod had been removed. Also, because the pods were permitted development at the time and built in pre- cast ‘pebbledash’ style panels they did not harmonise with the brick built houses.

3.3The current applications, submitted by Sutton Housing Partnership, form part of the Council’s decent homes programme which affects 750 dwellings across St Helier and aims to replace all remaining box bathrooms over the next 5 years. The benefit of the new box bathrooms are that they improve access for disabled users, having wider doors, provide more room for users (including a utility room), are faced in external materials that better match the existing house and can be installed more quickly as they are craned into position fully assembled. The removal of the existing pod and the provision of the replacement bathroom can be completed in around 3-5 hours. The new pod bathrooms have been installed in the same position as the previously existing units, although they are about 0.6m deeper and 0.15m higher. The design and layout of the new bathrooms were initially drawn up with the involvement of residents and local Councillors.

3.4Details of Proposals:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
6: Box Bathrooms: Various: REPORTReport 74 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 11 attended
JL
Councillor John LeachChair, present
MC
Councillor Monica ColemanVice-Chair, present
MB
Councillor Mary BurstowCommittee Member, present
MB
Councillor Moira ButtCommittee Member, present
EJ
Councillor Edward JoyceCommittee Member, present
TS
Councillor Tony ShieldsCommittee Member, present
KF
Karen FossettOfficer, present
AW
Andy WebberOfficer, present
PL
Peter LovedayOfficer, present
CW
Charles WardOfficer, present
PS
Peter SnowOfficer, present

More from Sutton Development Control Committee

All decisions
MeetingDecisionOutcome
23 Apr 2014 Election of chairThat Councillor Hamish Pollock be elected Chair of the Committee for the duration of the meeting. Decided Open
23 Apr 2014 Felnex trading estate, 190 london road, hackbridge - application no. c2014/68760/fulThat planning permission be granted for application No. C2014/68760/FUL, subject to (a) the written conclusion of a ‘... Agreed Open
23 Apr 2014 Tauranga, the wood end, wallington - application no. d2014/68776/hhaThat planning permission be granted for application No. D2014/68776/HHA, subject to the conditions, reasons and infor... Decided Open
23 Apr 2014 Thomas wall park pavilion, green lane, morden - application no. c2014/69143/nmaThat planning permission be granted for application No. C2014/69143/NMA, subject to the conditions, reasons and infor... Decided Open
23 Apr 2014 Land at margaret's pool, corner of pound street and west street, carshalton - application no. c2014/68989/advThat planning permission be granted for application No. C2014/68989/ADV, subject to the conditions, reasons and infor... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies