CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council

Grounds Maintenance Savings Report

Approved Committee 1 paper

Environmental Services and Climate Change Committee approved this item on Thursday 10 July 2025. Below is the council's own wording, with the papers it was decided on.

Item172

Resolved

(1) That the proposed savings and extension of the current Grounds Maintenance Contract between 14 January 2027 and 14 January 2029 be approved.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Environmental Services and Climate Change Committee

Background

2.1The GMC was previously tendered in 2021, covering the period January 2022 to January 2027. It provides for the maintenance of public open space including grass, facilities, hard landscape maintenance, litter/fly tip clearance, leaf clearance, shrub/herbaceous/rose bed and hedge maintenance, football/rugby pitch/tennis court and cemetery maintenance and management and play area maintenance. The 2025/26 value of the GMC is £1,768,443.13.

2.2A reduction in cost is only possible by varying the GMC and, ultimately, by reducing the specification of works that are required. Discussions with the Contractor have produced a set of options for Members to consider which would deliver some of the targeted savings. These include;

2.3Reduce the ‘amenity grass cutting’ specification from a ‘performance’ based criteria (removing the height tolerances outlined in clause 1.3.3 of the current contract specification) of approximately fifteen to sixteen times per year, to a ‘frequency’ based criteria with the contract crews visiting each site eight times per year. There are some amenity grass areas currently within the bill of quantities that are either high profile and/or service dependent (play areas as an example) which will need to continue on a ‘performance’ basis – these will be added to the ‘general amenity’ route and round list. As with all the proposed changes, a schedule will be agreed between the principal client officer and the GMC manager.

2.4Reduce the ‘leaf collection’ specification from a ‘performance’ based criteria (removing the time frames outlined in clause 5.2 of the current contract specification) of approximately five to six times per year, to a ‘frequency’ based criteria with the contract crews visiting all currently listed areas three times per year.

2.5Amend the current ‘shrub/herbaceous/rose bed” maintenance specification from categorised zones with varying visit schedules to one list with a frequency visit rate of six times per year.

2.6Remove all ‘annual bedding’ (including planted graves) from the GMC. This would mean that these areas reverted to either amenity grass and/or shrub bed at a cost to the Council. Most planted grave agreements are historical, with most plots no longer visited or supported by family members. They hold minimal financial value, so any claim against the change in management is unlikely to adversely affect existing budgets.

2.7Together, these changes will deliver an annual £75,000 saving against the existing budget (the value reducing to £1,693,443.13 based on the 25/26 value). Whilst a reduced level of service will undoubtedly change the aesthetic of the Borough, the reductions are considered to be feasible when weighed against the financial challenges facing the Council.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Grounds Maintenance Savings ReportReport 114 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

16 of 33 attended
MA
Michelle AndersonOfficer, in attendance
AA
Alister AndrewsOfficer, in attendance
BA
Billy AttawayOfficer, expected
AB
Andre BowenOfficer, in attendance
LB
Lloyd BowenCommittee Member, present as substitute
MC
Martyn CassellOfficer, in attendance
SC
Shelley CheesmanCommittee Member, present
AE
Alex EyreCommittee Member, apologies, sent representative
AG
Alastair GouldCommittee Member, present as substitute
RH
Robin HarrisOfficer, in attendance
DH
Duncan HaynesOfficer, in attendance
CJ
Carole JacksonCommittee Member, present

All 33 on the meeting page

On this subject at Swale

Search all
  1. Grounds Maintenance Savings ReportThis decision
  2. Award of Grounds Maintenance ContractDecided
  3. Grounds Maintenance Extension of ContractApproved

More from Swale Environmental Services and Climate Change Committee

All decisions
MeetingDecisionOutcome
8 Jul 2026 Chairs Briefing(1) That support be given to the work being undertaken to improve water quality in Milton Creek. (2) That similar sup... Decided Open
8 Jul 2026 Forward Decisions Plan(1) That the be noted. Noted Open
8 Jul 2026 Waste Collection and Street Cleansing Service Update(1) That the Annual Performance Report for the Waste Collection and Street Cleansing Service 2025/26 be noted. Noted Open
8 Jul 2026 Public Conveniences Review and Community Toilet Scheme Update(1) That the Committee did not support any further closures of public conveniences in Swale to create additional savi... Decided Open
13 May 2026 Election of Chair(1) That Councillor Dolley Wooster be elected Chair for the municipal year 2026/27. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies