Swansea Bay Tidal Bay Lagoon - Local Impact Report and Written Representation.

Decided Committee 6 papers

Development Management and Control Committee decided this item on Thursday 3 July 2014. Below is the council's own wording, with the papers it was decided on.

Item16

Resolved

RESOLVED that: (1) the Local Impact Report be accepted as the Local Impact Report for the City and County of Swansea and be submitted to the Examining Authority of the Planning Inspectorate in accordance with the timetable for the examination process; (2) delegated powers be granted to the Head of Economic Regeneration and Planning to make minor amendments to the Local Impact Report to rectify such matters as typing or grammatical errors; (3) that the findings of Kenneth Pye Associates and White Consultants be accepted and presented to the Examining Authority of the Planning Inspectorate as representing the views of the City and County of Swansea and formally form part of the Council’s Local Impact Report; (4) that the written representation be accepted as the written representation for the City and County of Swansea and be submitted to the Examining Authority of the Planning Inspectorate in accordance with the timetable for the examination process along with a summary version; (5) delegated powers be given to the Head of Economic Regeneration and Planning to formally contribute to a statement of common ground to be submitted to the Examining Authority of the Planning Inspectorate in accordance with the timetable for the examination process and within the terms of the Council’s Local Impact Report and written representations; (6) delegated powers to be given to the Head of Economic Regeneration and Planning to formally respond to the Examining Authority’s Inspector’s questions in accordance with the timetable for the examination process during the course of the examination and also to make comment on the submissions of other parties including the applicant; (7) delegated powers be given to the Head of Economic Regeneration and Planning to formally represent the views of the City and County of Swansea in any topic specific hearing and subsequent requirements in accordance with the timetable for the examination process during the course of the examination, within the terms of the Council’s Local Impact Report and written representation. (8) delegated powers be given to the Head of Economic Regeneration and Planning to add formal comments on the draft requirements (conditions) of the Development Consent Order; (9) delegated powers be granted to the Head of Economic Regeneration and Planning to continue negotiations on the precise level of contribution required towards the Fabian Way Corridor Study Works; (10) that an examination progress report be reported to the Development Management and Control Committee scheduled for 9 October 2014.
Word for word from the decision Swansea published for this meeting. Source: democracy.swansea.gov.uk

Follow this further

Built from Swansea's papers

What the report saysPro

Report to Development Management and Control Committee

APPENDIX 1

1.0Detailed Description of the Proposed Scheme

1.1Tidal Lagoon Swansea Bay Ltd proposes to design, construct and operate a tidal lagoon for the purpose of generating renewable energy. This will be achieved by harnessing the power of the high tidal range in Swansea Bay (where the maximum Spring tidal range reaches over 10m).

1.2As illustrated below, the lagoon created as part of the project would enclose part of the seabed and the foreshore of Swansea Bay. The associated seawalls would be approximately 9.5km in length and extend in a distorted U-shape from the eastern side of the River Tawe to the eastern edge of the new Swansea University Bay Campus.

1.3The new seawalls of the lagoon would extend approximately 1.5km directly offshore from the eastern landfall at the Bay Campus (the eastern landfall), adjacent to Crymlyn Burrows SSSI. The seawalls would then extend in a south-westerly direction for approximately 4.3km. A turbine and sluice gate housing structure would be located in the south west of the lagoon, at an oblique angle to the dredged channel of the River Tawe. The seawall would then extend towards Swansea Port for approximately 2.5km, close to the mouth of the River Tawe parallel to the dredged channel for the River Tawe to rejoin the land (the western landfall). 1.4 The seawalls would enclose an area of approximately 11.5km2 of seabed and foreshore to create the lagoon. The hydro turbines used for the project would be bi-directional, meaning they are able to generate power with flows of water in both directions (i.e. on both incoming and outgoing tides). At high water a “head” of water (a difference in water level between the inside and outside of the Lagoon) would be held within the Lagoon using sluice gates located within the turbine and sluice gate housing. About 2.5 hours after high water, the water held within the Lagoon would be released, and power would be generated when the resulting flow is channelled through the turbines on the outgoing tide. This process would be repeated on the flood tide for bi-directional generation. The project would therefore generate electricity four times per day (on each of two ebb and flood tides) totalling, on average, 14 hours of generation every day.

1.5The electricity generated would be fed into the National Electricity Transmission System (NETS) via National Grid's substation in Baglan by way of an underground cable connection from the generating station. It is anticipated that the Project will produce some 400 GWh net of electricity on an annual basis, which is enough to power around 121,000 homes.

1.6It is stated that the project will also offer additional benefits to the Swansea Bay area and the wider population, promoting educational, sport, recreational art and cultural activities for public use.

1.7The offshore works during the construction and operation phases would comprise the following:

• Turbines and sluice gates, their housing structure, gantry crane and other facilities, such as generators and switchgear; • Temporary cofferdam to facilitate the construction of the turbine and sluice gate housing structure; • Temporary rock storage areas; seawalls and associated dredging works; • Dredging to create boating area; access road on the seawalls including public realm works, lighting structures and shelters; • Offshore Building incorporating operation and maintenance (O&M) facilities, with integral visitor centre, leisure facilities and public realm; • Emergency facilities; works to Swansea Port Channel; demolition of existing eastern breakwater wall at the entrance to the Port of Swansea; • Works to Neath Harbour Channel including the widening of the entrance to the channel and replacement of its training wall; water quality enhancement works (if required or implemented); • Navigation facilities including lighting; reef habitat creation works, provision of oyster spatting ponds, herring mitigation and Sabellaria habitat works. 1.8 The onshore works would comprise:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
REPORTAppendix 1 3.5 MB DownloadRead as text
PDF
REPORT: LIRAppendix 3 556 KB Download
PDF
LIRAppendix A 917 KB Download
PDF
LIRAppendix B 13 MB Download
PDF
LIRAppendix C 319 KB Download
PDF
Swansea Bay Tidal Bay Lagoon: Local Impact Report and Written Representation.Report 187 KB Withheld: personal details

At this meeting

Whole meeting
15Disclosures of Personal & Prejudicial Interests.On the agenda
16Swansea Bay Tidal Bay Lagoon - Local Impact Report and Written Representation.This decision

Who was there

52 of 72 attended
RF
Robert Francis-DaviesChair, present
JB
John BaylissCommittee Member, present
PB
Peter BlackCommittee Member, apologies
NB
Nick BradleyCommittee Member, apologies
JB
June BurtonshawCommittee Member, present
MC
Mark ChildCommittee Member, present
BC
Bob ClayCommittee Member, present
UC
Uta ClayCommittee Member, present
TC
Tony ColburnCommittee Member, present
DC
David ColeCommittee Member, present
AC
Ann CookCommittee Member, present
SC
Sybil CrouchCommittee Member, present

All 72 on the meeting page

On this subject at Swansea

Search all
  1. Swansea Bay Tidal Bay Lagoon - Local Impact Report and Written Representation.This decision
  2. Neath Port Talbot & Swansea Drug and Alcohol Leadership Board (formerly known as Western Bay Area Planning Board (APB)) Strategy and Delivery Plan 2026–2029.Decided
  3. Election of Swansea Bay City Region Joint Committee Chair.Decided
  4. Swansea Bay City Deal Internal Audit Recommendation Report 2025-26.Decided
  5. Deed of Variation to the Swansea Bay City Region Joint Committee Agreement (JCA).Noted
  6. Swansea Bay City Deal Portfolio Business Case.Approved

More from Swansea Development Management and Control Committee

All decisions
MeetingDecisionOutcome
4 Dec 2014 Minutes.RESOLVED that the minutes of the Development Management & Control Committees held on 30 September & 9 October 2014 be... Agreed Open
4 Dec 2014 Planning Application No.2008/1615 - Former Bernard Hastie and Co. Site, Morfa Road, Swansea.RESOLVED that the application BE APPROVED and the Section 106 Obligation be amended and that minor amendments to the ... Approved Open
4 Dec 2014 Proposals for the Enhancement of Existing Powers Generation Facilities at Tata's Port Talbot Steelworks - Written Representations.RESOLVED that:- (1) Delegated Powers be granted to the Head of Economic Regeneration and Planning to submit written r... Decided Open
4 Dec 2014 Minutes of the Rights of Way Sub Committee. (For Information)RESOLVED that the Minutes of the Rights of Way Sub Committee held on 13 August 2014 and 8 October 2014 be noted. The ... Noted Open
9 Oct 2014 Minutes.RESOLVED that the minutes of the Development Management & Control Committee held on 14 August 2014 be agreed as a cor... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies