Resolved
Approved.
Climate Change Corporate Delivery Committee approved this item on Monday 20 March 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
Approved.
Appendix 1
MORE HOMES Swansea City Council Building Services has successfully delivered its first new build Council houses in a generation, on time and on budget. This achievement was remarkable on several levels given the lack of experience in, cutting edge M&E technology, fast track construction methodology, a shift from 85% of core work being retrofit, to new build construction. The Authorities decision to not only build new homes first time in a generation but, build to a PassivHaus accredited standard, was by far the biggest challenge.
The Passivhaus specification was chosen because it’s extremely thermally efficient, reduces annual running costs for tenants. These new homes have been built in one of the most economic and socially deprived areas of Swansea, so reducing fuel poverty for tenants was a high priority for the Council.
The construction technique ensured high levels of mass insulation, no thermal bridging, extremely high levels of airtightness which reduces heat loss, high performance windows and doors for solar gain, and continuous ventilation via a mechanical ventilation heat recovery system (MVHR). To give an example of how extreme this construction methods were, and tolerances allowed, effectively the structure is wrapped in two layers of airtight and wind tight membrane, when pressurised if the internal membrane has 3 holes £1 coin in size, the building will fail the air tightness test
Measurable, 450 on site learning days for apprentices, the project also involved getting 6 long term unemployed individuals who achieved 34 weeks of work experience with 2 securing permanent full-time employment.
Attainment of IIP Accreditation, ISO14002 in a range of business areas and Green Dragon Level 5 for its waste and sustainability initiatives. Appendix 1
Left Cllr Rob Stewart leader of Swansea Council, Right Honourable First Minister for Wales Carwyn Jones (2017)
Improvements Achieved
A review of the More Homes pilot project identified that whilst accredited PassiveHaus design build costs resulted in a 15% uplift on traditional build costs, the additional investment was by far, outweighed by the benefit the tenants were enjoying of massively reduced energy consumption and resulting lower energy bills.
The lessons learned exercise revealed the marketplace was restricted, lacked competition and drove up costs with in both the supply chain and specialist sub- contractor field. In addition, whilst carrying out an impact assessment exercise, it was perfectly clear the PassiveHaus model was predominantly fed by the European / National markets with any supply or services requiring PassiveHaus accreditations, increasing Swansea Carbon footprint. Timber frame (Ireland) windows & doors (Belgium) insulation (Czechoslovakia) resulting in 65% project supply chain spend went international/National.
Swansea Council’s dilemma, the key priority of tackling fuel poverty was absolutely right, the performance of PassiveHaus met the needs of the key priority, but the concept failed on so many other levels. The project team met several times, engaging BRE, before the “Swansea Standard” evolved. The new design brief based on fabric first approach in conjunction with Homes As Power Stations (HAPS) were finalised and presented at Client Housing Future board meeting, before being signed off at Cabinet and then Council, as the blueprint for all future developments. Appendix 1
In preparation and as part of Building Services commitment to creating safe working environment within the heart of built up and established communities, a stay safe campaign was launched and delivered in the local primary schools.
Outcomes
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
04 (2 of 5): Appendix 1: More HomesAppendix | 398 KB | DownloadRead as text |
PDF |
04 (3 of 5): Appendix 2: Social Value Recording v3Appendix | 406 KB | Download |
PDF |
04 (4 of 5): Appendix 3: Method Statement Questions rev003 FinalAppendix | 232 KB | Download |
PDF |
04 (5 of 5): Appendix 4: IIA_screening_form_(June_22) CDC ClimateAppendix | 161 KB | Download |
PDF |
Procurement and the Net Carbon Zero Agenda.Agenda | 357 KB | Download |
Follow Climate Change Corporate Delivery Committee at Swansea and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 Mar 2023 | Disclosures of Personal & Prejudicial Interests.In accordance with the Code of Conduct adopted by the City & County of Swansea, no interests were declared. | Approved | Open |
| 20 Mar 2023 | MinutesApproved. Resolved that the Minutes of the Climate Change Corporate Delivery Committee held on 20 February 2023 be ap... | Approved | Open |
| 20 Mar 2023 | Work Plan.For information. | Decided | Open |
| 20 Feb 2023 | Disclosures of Personal & Prejudicial Interests.In accordance with the Code of Conduct adopted by the City & County of Swansea, the following interests were declared... | Approved | Open |
| 20 Feb 2023 | MinutesApproved. Resolved that the Minutes of the Climate Change Corporate Delivery Committee held on 16 January 2023 be app... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.