CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swansea Council
Climate Change Corporate Delivery Committee, Monday 20 March 2023 at 5.30pm

Procurement and the Net Carbon Zero Agenda.

Approved Committee 5 papers

Climate Change Corporate Delivery Committee approved this item on Monday 20 March 2023. Below is the council's own wording, with the papers it was decided on.

Item35

Resolved

Approved.
Word for word from the decision Swansea published for this meeting. Source: democracy.swansea.gov.uk

Follow this further

Built from Swansea's papers

What the report saysPro

Report to Climate Change Corporate Delivery Committee

Appendix 1

MORE HOMES Swansea City Council Building Services has successfully delivered its first new build Council houses in a generation, on time and on budget. This achievement was remarkable on several levels given the lack of experience in, cutting edge M&E technology, fast track construction methodology, a shift from 85% of core work being retrofit, to new build construction. The Authorities decision to not only build new homes first time in a generation but, build to a PassivHaus accredited standard, was by far the biggest challenge.

The Passivhaus specification was chosen because it’s extremely thermally efficient, reduces annual running costs for tenants. These new homes have been built in one of the most economic and socially deprived areas of Swansea, so reducing fuel poverty for tenants was a high priority for the Council.

The construction technique ensured high levels of mass insulation, no thermal bridging, extremely high levels of airtightness which reduces heat loss, high performance windows and doors for solar gain, and continuous ventilation via a mechanical ventilation heat recovery system (MVHR). To give an example of how extreme this construction methods were, and tolerances allowed, effectively the structure is wrapped in two layers of airtight and wind tight membrane, when pressurised if the internal membrane has 3 holes £1 coin in size, the building will fail the air tightness test

Measurable, 450 on site learning days for apprentices, the project also involved getting 6 long term unemployed individuals who achieved 34 weeks of work experience with 2 securing permanent full-time employment.

Attainment of IIP Accreditation, ISO14002 in a range of business areas and Green Dragon Level 5 for its waste and sustainability initiatives. Appendix 1

Left Cllr Rob Stewart leader of Swansea Council, Right Honourable First Minister for Wales Carwyn Jones (2017)

Improvements Achieved

A review of the More Homes pilot project identified that whilst accredited PassiveHaus design build costs resulted in a 15% uplift on traditional build costs, the additional investment was by far, outweighed by the benefit the tenants were enjoying of massively reduced energy consumption and resulting lower energy bills.

The lessons learned exercise revealed the marketplace was restricted, lacked competition and drove up costs with in both the supply chain and specialist sub- contractor field. In addition, whilst carrying out an impact assessment exercise, it was perfectly clear the PassiveHaus model was predominantly fed by the European / National markets with any supply or services requiring PassiveHaus accreditations, increasing Swansea Carbon footprint. Timber frame (Ireland) windows & doors (Belgium) insulation (Czechoslovakia) resulting in 65% project supply chain spend went international/National.

Swansea Council’s dilemma, the key priority of tackling fuel poverty was absolutely right, the performance of PassiveHaus met the needs of the key priority, but the concept failed on so many other levels. The project team met several times, engaging BRE, before the “Swansea Standard” evolved. The new design brief based on fabric first approach in conjunction with Homes As Power Stations (HAPS) were finalised and presented at Client Housing Future board meeting, before being signed off at Cabinet and then Council, as the blueprint for all future developments. Appendix 1

In preparation and as part of Building Services commitment to creating safe working environment within the heart of built up and established communities, a stay safe campaign was launched and delivered in the local primary schools.

Outcomes

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
04 (2 of 5): Appendix 1: More HomesAppendix 398 KB DownloadRead as text
PDF
04 (3 of 5): Appendix 2: Social Value Recording v3Appendix 406 KB Download
PDF
04 (4 of 5): Appendix 3: Method Statement Questions rev003 FinalAppendix 232 KB Download
PDF
04 (5 of 5): Appendix 4: IIA_screening_form_(June_22) CDC ClimateAppendix 161 KB Download
PDF
Procurement and the Net Carbon Zero Agenda.Agenda 357 KB Download

At this meeting

Whole meeting
33Disclosures of Personal & Prejudicial Interests.Approved 34MinutesApproved
35Procurement and the Net Carbon Zero Agenda.This decision
36Work Plan.Decided

Who was there

18 of 21 attended
KR
Kelly RobertsChair, apologies
AO
Angela O'ConnorCommittee Member, present, as expected, virtual
SR
Stuart RiceCommittee Member, present
RD
Ryland DoyleCommittee Member, present, as expected, virtual
SK
Sara KeetonCommittee Member, present, as expected, virtual
NM
Nicola MatthewsVice-Chair, in the Chair, present
HL
Hannah LawsonCommittee Member, present, as expected, virtual
DP
David PhillipsCommittee Member, absent
OJ
Oliver JamesCommittee Member, present, as expected, virtual
AL
Andrea LewisAdvisory Member, apologies
DH
David HopkinsAdvisory Member, present
CA
Cyril AndersonAdvisory Member, present, as expected, virtual

All 21 on the meeting page

More from Swansea Climate Change Corporate Delivery Committee

All decisions
MeetingDecisionOutcome
20 Mar 2023 Disclosures of Personal & Prejudicial Interests.In accordance with the Code of Conduct adopted by the City & County of Swansea, no interests were declared. Approved Open
20 Mar 2023 MinutesApproved. Resolved that the Minutes of the Climate Change Corporate Delivery Committee held on 20 February 2023 be ap... Approved Open
20 Mar 2023 Work Plan.For information. Decided Open
20 Feb 2023 Disclosures of Personal & Prejudicial Interests.In accordance with the Code of Conduct adopted by the City & County of Swansea, the following interests were declared... Approved Open
20 Feb 2023 MinutesApproved. Resolved that the Minutes of the Climate Change Corporate Delivery Committee held on 16 January 2023 be app... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies