Resolved
Resolved – That this Committee notes (a) the action taken to complete Promise 25 and (b) the results of the 2009 survey on the condition of the Rights of Way network indicating that Promise 25 has been completed
Way Committee decided this item on Wednesday 27 January 2010. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved – That this Committee notes (a) the action taken to complete Promise 25 and (b) the results of the 2009 survey on the condition of the Rights of Way network indicating that Promise 25 has been completed
Completion of Promise 25 Footpath and Rights of Way Committee Date: 27th January 2010
Author: Director of Planning & Transport
Parish / Wards Affected: All
Purpose To update the Footpath and Rights of Way Committee on the progress of Promise 25.
Recommendation The Footpath & Rights of Way Committee is requested to • Note both the action taken to complete Promise 25 and the results of the 2009 survey on the condition of the rights of way network indicating that Promise 25 has been completed. • Provide comments on the completion of Promise 25.
1. Reasons 1.1 To advise the Footpaths and Rights of Way Committee of the completion of Promise 25.
1.2To enable the Footpaths and Rights of Way Committee to comment on whether the objectives for Promise 25 have been met.
1.3The Footpaths and Rights of Way Committee, at its meeting on the 14th October 2009, requested a report on this matter to be presented to this meeting.
2. Detail 2.1 What is Promise 25 Promise 25 is one of the 50 promises that the council has committed to completing by 2010. The promise states: “We value the importance of our rural environment and will improve access to the countryside by ensuring that 90% of our rural footpaths and cycleways reach the government standard of ‘easy to use’”
2.2What is the government standard of easy to use 2.2.1 The government standard on ease of use is identified by Best Value Indicator 178. This refers to the percentage of total length of rights of way in the local authority area, which are easy to use by the general public. Local authorities are directed to use the County Surveyors Society (CSS) methodology as a benchmark standard. This standard is applied to a random sample totalling 25 kilometres of Swindon’s rights of way network. Further
Further information on the subject of this report can be obtained from Rachel Ind on 01793 466337 or Email [email protected]. Completion of Promise 25 Footpath and Rights of Way Committee Date: 27th January 2010
details may be obtained from the report submitted to the Footpath and Rights of Way Committee on 14th October 2009.
2.2.2 The first half yearly survey was conducted in May 2009 over 27 footpaths with a total length of 12.749 kilometres. Of these 27 footpaths only one failed (Swindon 285) as a result of a missing bridge. The second half yearly survey was conducted in November 2009 again over 27 footpaths with a total length of 13.244 kilometres. Of these 27 footpaths there were 3 failures (Wanborough 33, Swindon 51 and Stanton Fitzwarren 9)
2.2.3 The total survey undertaken for the year was 25.993 kilometres with a pass rate for 23.966 kilometres. Applying the CSS form the following result was obtained:
23.966km / 25.993 = 0.922 x 100 = 92.20
2.2.4 92.20% is therefore the final yearly indicator for the total length of Swindon’s Rights of Way network that is easy to use. This exceeds the Promise 25 target of 90% and therefore indicates that Promise 25 has been successfully completed.
2.3Progress on the Rights of Way Improvement Plan and Promise 25 2.3.1 The provision of a Rights of Way Improvement Plan (RoWIP) was identified through Promise 25 Milestone 3
2.3.2 The RoWIP identified six key issues and these are linked to Promise 25 as they support the promise in more detail. The RoWIP is however a 10 year plan and therefore completion on the work identified in the RoWIP is ongoing
2.3.3 The RoWIP identifies six key issues and work has been carried out on the following:
Key Issue No.1 - Maintenance of the existing network Maintenance of the existing network is ongoing and the improvement in the BVPI 178 figure of the last 5 years supports the effectiveness of the continuing maintenance programme.
Key Issue No.2 - Lack of Signage and Information The signage programme for 2009/2010 is practically complete with the final signage to be erected by the end of February 2010 weather permitting.
Key Issue No.3 - More links to centres of population with the countryside. Significant work on this issue is yet to be undertaken.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Promise 25: UpdateReport | 22 KB | DownloadRead as text |
Follow Way Committee at Swindon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jan 2013 | Terms of Reference of the Footpaths and Rights of Way CommitteeResolved – (1) That the report be noted and that an annual report be produced listing the Footpaths works carried out... | Noted | Open |
| 5 Apr 2012 | Application for the registration as a Town or Village Green of Buckhurst Field at Buckhurst Crescent Walcot SwindonResolved – That the application for the registration of land as a town or village green in respect of land known as B... | Refused | Open |
| 5 Apr 2012 | Rights of Way Improvement Plan - Summary 2007-2011Resolved – (1) That the progress to date on the Key Issues identified within the Rights of Way Improvement Plan be no... | Noted | Open |
| 2 Mar 2011 | Proposed Diversion of Footpath 10 Blunsdon St AndrewResolved – That this Committee refuse to confirm the diversion order for a length of Footpath 10 Blunsdon St Andrew u... | Refused | Open |
| 2 Mar 2011 | Proposed Diversion of Footpath 285 Swindon and 59 WroughtonResolved – That the Director of Planning and Transport be authorised to submit the proposed diversion order of Footpa... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.