Cabinet, Wednesday 10 February 2016

Capital Programme 2016/17 (Minute for Confirmation)

Noted Executive 2 papers

Cabinet noted this item on Wednesday 10 February 2016. Below is the council's own wording, with the papers it was decided on.

Item60

Resolved

Resolved – That the Council be recommended: a) That the position and future budget requirement for the additional Children’s Services schemes, referred to at paragraphs 3.7 of the report, be noted. b) That a budget of £2.090m for the schemes referred to at paragraph 3.8 in the report and detailed in Appendix 1 to the report, be approved. c) That a total budget of £3.944m for the 2016/17 local priority Highways and Transport schemes, referred to at paragraph 3.9 in the report and detailed at Appendix 2 to the report, be approved. d) That a total budget of £2.391m for 2016/17 for Repairs and Maintenance on Corporate Property, as referred to in paragraphs 3.11 and detailed at Appendix 3 to the report, be approved. e) That a total budget requirement of £1.188m for Older Peoples and other capital schemes, referred to in paragraph 3.15 and detailed at Appendix 4 to the report, be approved. f) That a budget of £38,507 for refurbishment work to the Highdown play area, funded from Abbey Stadium S106 monies, as detailed at paragraph 3.18 in the report, be approved. g) That an increase in the budget for Waterside improvement works, from £3.8m to £4.0m, as detailed at paragraphs 3.19 to 3.21 of the report, be approved. The reasons for the decision and alternative options are as set out in the report to the meeting. (CM: EF)
Word for word from the decision Swindon published for this meeting. Source: ww5.swindon.gov.uk

Follow this further

Built from Swindon's papers

What the report saysPro

Report to Cabinet

Appendix 1- Children’s Services proposals

16/17 17/18 Total For For Approval Approval

Condition Programme 2016/17 500,000 500,000 Crowdys Primary (was Chalet) & Westrop Expansion 890,000 700,000 1,590,000

TOTAL BUDGET REQUIRING APPROVAL 1,390,000 700,000 2,090,000

Funding Estimate Maintenance Grant - to be confirmed 1,378,698 1,378,698 Basic Need Grant - to be confirmed 165,609 165,609 s106 Contributions 191,302 191,302

Total Funding Available 1,735,609 1,735,609 Total Shortfall - Borrowing Requirement 354,391 Revenue Budget Impact p.a. @ £80k per £1m 28,351 Appendix 2 - Highways and Transport proposals

Project Name 15/16 16/17 17/18 Total Comments For For Budget Approval information Local Transport Plan Highways Maintenance 3,384,000 2,566,000 2,489,000 5,055,000

This is made of Highway Maintenance (Carriageway surfacing, Rights of Way improvements, Structural maintenance, Pavement maintenance, Street lighting, Drainage and Traffic Signals) and Integrated schemes (Locality schemes, Casualty and congestion reduction schemes, Sustainable transport schemes).

Integrated Schemes 543,000 1,108,000 1,113,000 2,221,000 Bridge Strengthening Programme 20,000 20,000 Coleshill and Lynt Bridges require strengthening for 40t vehicles. This will bring them up to the normal load carrying capacity and reduce the risk of damage from HGVs and the future possibility of traffic restrictions or road closures. The £20k will cover detailed design for the 2 bridges, and the cost estimates will be ascertained once this work is completed.

Car Park maintenance 250,000 250,000 265,000 515,000 Maintenance of Multi-Storey Car Park assets (5no.) to keep them safe, serviceable and attractive environments for customers. Works include general repairs to structure to ensure long lasting durable assets with minimal maintenance liability TOTAL BUDGET REQUIRING APPROVAL 4,177,000 3,944,000 3,867,000 7,811,000

Funding Estimate Estimate LTP Maintenance Grant - indicative grant figures 2,799,000 2,566,000 2,489,000 5,055,000 LTP Integrated Grant - indicative grant figures 1,378,000 1,378,000 1,378,000 2,756,000

Total Funding Available 4,177,000 3,944,000 3,867,000 7,811,000 Appendix 3 - Property Proposals

Project Name 15/16 16/17 17/18 Total Comments Budget For For Approval Approval information

SBC are required to ensure that any reservoirs within the Borough, are inspected for safety on a regular basis by a specialist Reservoir Panel Engineer. The Southern half of the concrete wave wall has collapsed and needs to be repaired. Stanton Park & Peatmoor Reservoir Refurbishment - 131,000 131,000 Peatmoor: The penstock control valve should be repaired and improvements carried out to reduce the susceptibility to vandalism

To be utilised to undertake required works in a planned manner informed by condition surveys and to address the current backlog on the property estate. To keep operational buildings and properties that are leased to others where we have General Repairs & Maintenance including Disability contractual obligations, safe and serviceable. In addition some monies will be 2,000,000 2,000,000 2,000,000 4,000,000 Discrimination Access requirements targeted towards enabling asset transfers to third parties in consultation with the communities and cultural property assets change programme.

We have a legal duty to undertake a planned programme of surveys and re- inspection to assess the condition of any asbestos containing materials in our Management of Asbestos 260,000 260,000 520,000 corporate buildings to enable us maintain a management plan to comply with the Control of Asbestos Regulations 2012. - Total 2,000,000 2,391,000 2,260,000 4,651,000

Funding 16/17 17/18 Total None

Total - - - Shortfall - Borrowing 2,391,000 2,260,000 4,651,000 Revenue Budget Impact p.a. @ £80k per £1m 191,280 180,800 372,080 Appendix 4 - Older Peoples & Other proposals Budget Requirement Project Name 16/17 17/18 Total Comments For For Approval information

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Capital Programme 16-17 Appendicies 1-4 FinalReport 126 KB DownloadRead as text
PDF
Capital Programme 2016/17 (Minute for Confirmation)Report 243 KB Download

At this meeting

Whole meeting

On this subject at Swindon

Search all
  1. Capital Programme 2016/17 (Minute for Confirmation)This decision
  2. Capital Programme 2026/2027 (Minute for Confirmation)Approved
  3. Capital Programme 2025-2026Approved
  4. Capital Programme 2024/2025 (Minute for Confirmation)Approved
  5. Capital programme 2023-24 (Minute for Confirmation)Approved
  6. Capital Programme to 2026/27 (Minute for Confirmation)Approved

More from Swindon Cabinet

All decisions
MeetingDecisionOutcome
8 Oct 2026 Budget Management UpdateNon-Key Decision Following consideration of the report and its appendices, Cabinet resolved : (1) That the Council’s ... Noted Open
8 Oct 2026 Capital Monitoring – Quarter 1 2026/2027Key Decision Following consideration of the report and its appendices, Cabinet resolved : (1) That the 2026/27 expend... Noted Open
8 Oct 2026 Consultation and Engagement PolicyKey Decision Following consideration of the report and its appendix, Cabinet resolved that the updated Consultation a... Approved Open
8 Oct 2026 CSC Ofsted Monitoring Visit UpdateNon-key Decision Following consideration of the report and its appendix, Cabinet resolved : (1) That the progress mad... Noted Open
8 Oct 2026 Housing Policy ReviewNon-Key Decision Following consideration of the report and its appendices, Cabinet resolved that the nine housing pol... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies