RESOLVED – that that DELEGATED AUTHORITY be granted to the Development Management Service Delivery Manager to GRANT FULL PLANNING PERMISSION subject to a Section 106 Agreement to secure Financial Contributions, Condition(s) and Informative(s).
Word for word from the decision Telford & Wrekin published for this meeting.Source: democracy.telford.gov.uk
DO NOT SCALE THIS DRAWING STN 6 IMPORTANT DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL ENGINEER'S DRAWINGS & INFORMATION PLEASE NOTE
Due to the age, materials, construction & layout of existing buildings dimensions and EXISTING HGV levels may vary according to location. WORKSHOP BUILDING Whilst best efforts are made, wall thicknesses sometimes differ according to height & walls which are not straight & may 'bend' mid-run. Also due to slightly sloping ceilings/floors, clear heights may differ dependant on where existing measurements are taken.
This drawing and the works depicted are the copyright of Design and Planning EXISTING HGV WORKSHOP PARKING(2) Associates Ltd (DPA) and may only be reproduced with written permission. No alteration to the design or specification in part or whole to be made without the written approval of DPA 63.90
All dimensions and levels depicted are subject to checking and verified on site prior to construction. Any discrepancies are to be immediately notified to DPA. Figured dimensions to be used only.
The information contained in this drawing must only be used at the named location. The 63.88 63.88 STN 4 location of any services indicated on this drawing are approximate only and must be checked on site by the main contractor before commencing works.
Client/Contractor is to be responsible for locating any underground services. Storm IC cl 63.88 STN 5 il 63.33 CDM Regulations - Where applicable the designers hazard identification sheets to be all 150mm read in conjunction with all consultants drawings, specifications and existing record EXISTING HGV WASHING drawings. It is considered that a competent contractor will be able to identify hazards
62 .5
.5 1
.5 .5 associated with the project from the information above, and take the necessary 63
3. 63 FACILITY 63
6 cl
cl
cl
cl cl
IC precautions to deal with any risks to health and safety. IC
IC
IC IC
63.6463.63 Tank 63.64 63.64 CDM - for the avoidance of doubt the Principal Contractor is reminded that he is fully 63.64 63.64 and solely responsible for the day-to-day management of site safety.
Compliance with the construction design and management regulations(CDM) is the sole responsibility of the client unless we are otherwise instructed in writing.
CONSTRUCTION NOTES GENERALLY: 63.86 2194 5 Notwithstanding anything contained in this document or any other document forming
forkl 2086 63.86 part of the basis of the works every aspect of the works/installation is to comply with all 9
ift requirements and all recommendations of all relevant Associations, Manufacturers,
in/ou 63.92 BRE Digests, British Standards, Codes of Practice, Building Regulations, Bye-Laws, Acts, Regulations, Planning Authority, Environmental Health Department, Fire
t trailer EV Authorities, Water Authorities, Gas Autghority, Electricity Authority, Institute of Heating hookup 11 and Ventilating Engineers and IEE Regulations. 29 TRAILER PARKING Parking: trailer EV hookup 10 EXISTING CONCRETE Offices:
1 trailer EV Existing car spaces retained - 14 bays
5011 hookup 9
trailer EV EXISTING ACCESS hookup 8 Proposed car spaces
2 -6 No EV trailer EV hookup 7 63.86 63.87 -2 no Disable spaces
WOOD 66
2 63.73
1002 63.78 63.68 63.68 63.74 -24 additional bays
3 trailer EV Storm hookup 6 IC cl 63.89 il 63.08 all 150mm 63.80 Total Office/Warehouse Staff bays - 46 bays 63.70 63.78
DOCK LEVE
4 Storm Existing Workshop - 4 spaces
LLING IC cl 63.67 trailer EV
PIT il 62.63
5011 all 150mm hookup 5
Existing HGV Drivers Spaces - 50 spaces
CK LE DO 63.70 Proposed HGV Drivers Spaces - 8 spaces
5 VELL ING PI trailer EV
5011 T hookup 4 HGV Trailers at any one time - 70 trailers
ill Sto Ch HGV Trailer parking shown - 73 Trailers
(+115
1261 - 1172sq r a 0) DOCK
g 0sqft e LEVE
6 LLING trailer EV
PI
5011 T hookup 3
m 63.71
DOCK LEVE
7 LLING trailer EV
PIT
2 5 6514 hookup 2
6591 STN 3
DOCK LE
8 VELL EXISTING CONCRETE
ING PI
5011 PARKING(14)
T 63.71 1:250 trailer EV 10m 20m hookup 1
9 Scale bars for information only and not for construction
5011 NOT APPROVED FOR CONSTRUCTION
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the Previous MeetingRESOLVED – that the minutes of the meeting of the Planning Committee held on 18 March 2026 be confirmed and signed by...
Minutes of the Previous MeetingRESOLVED – that the minutes of the meeting of the Planning Committee held on 4 February 2026 be confirmed as a correc...
Minutes of the Previous MeetingRESOLVED – that the minutes of the meeting of the Planning Committee held on 10 December 2025 be confirmed and signed...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.