Tendring District Council
Cabinet, Friday 14 November 2025 at 10.30am

Cabinet Members' Items - Report of the Economic Growth, Regeneration & Tourism Portfolio Holder - A.4 - Community Regeneration Partnership (CRP2) - Programme Update and Reallocation of Funding

Approved Executive 2 papers

AI summaryTendring Cabinet reallocated Community Regeneration Partnership funding, dropping the £5m Ten_13 Town Centre Building project, rescoping Tudor Fields and Jaywick Healthy Homes, and adding to budgets of other schemes to meet MHCLG's March 2026 deadline.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedReallocation of CRP2 programme funding, Ten_13 dropped
Money£5m reallocatedfrom dropped Ten_13, plus additional sums to other projects
What happens nextChange Control approvalby Portfolio Holders, then delivery to March 2026
Who it affectsClacton and Jaywickten wards plus Tendring-wide delivery partners

What was decided

Cabinet approved reallocation of funding within the Community Regeneration Partnership programme, removing Ten_13 Town Centre Building and rescoping Ten_05 Tudor Fields and Ten_06 Jaywick Healthy Homes. Report P14, P70

Additional capital allocations were made to Ten_04, Ten_07, Ten_08, Ten_09, Ten_10, Ten_11 and Ten_12, with £200,000 of revenue funding added to Ten_06. Report P14, P75

Authority to approve Change Control Notices was delegated to the Portfolio Holder for Economic Growth, Regeneration and Tourism, in consultation with supporting Portfolio Holders. Report P15

Why

Feasibility work found Ten_05 Tudor Fields and Ten_13 Town Centre Building carried prohibitive deliverability risks, while Ten_06 cannot be funded from capital because enforcement work is revenue expenditure. Report P8, P21, P70

Substantial inflation and cost uplift in the construction industry since the original MHCLG Deep Dive in January 2024 has eroded project budgets. Report P14

MHCLG requires the Council to demonstrate substantial start and commitment to the programme by March 2026; not reallocating would risk the funding being returned to MHCLG. Report P16, P17, P23

What happens next

Change Control Notices will be approved by the relevant Portfolio Holders, with updated Project Initiation Documents prepared for Ten_05 and Ten_06. Report P12, P51, P76

A formal close-out report on Ten_13 Town Centre Building will be completed by the Project Delivery Unit, including lessons learned. Report P51

A Project Delivery Unit review is planned for spring 2026, with the current PDU budget set to expire on 11 November 2026. Report P44

The money

  • £5m Capital funding from Ten_13 Town Centre Building reallocated elsewhere in the programme
  • £1.5m Capital funding reallocated away from Ten_05 Tudor Fields, leaving £1m for walking and cycling route
  • £100,000 Capital funding reallocated from Ten_06 Jaywick Healthy Buildings to Enterprise Centre works
  • £50,000 Additional capital to Ten_04 Sunspot Solar Panels, raising total to £200,000
  • £2.5m Additional capital to Ten_07 Clacton Town Centre Public Realm, raising total to £3.8m
  • £200,000 Additional capital to Ten_08 Jaywick and Clacton Shopfront Improvements, raising total to £700,000, with £150,000 ringfenced for Jaywick Sands grants
  • £1.2m Additional capital to Ten_09 Jaywick Sands Open Spaces, raising total to £3.2m
  • £400,000 Additional capital to Ten_10 Seafront Micro Venue, raising total to £900,000
  • £1.5m Additional capital to Ten_11 Martello Tower E, raising total to £3.5m
  • £750,000 Additional capital to Ten_12 Active Wellbeing Centre Phase 1, raising total to £3.75m
  • £200,000 Revenue funding allocated to Ten_06 Jaywick Healthy Buildings for enforcement approach, delivered via capitalisation of PDU project management time Report P14
  • £19,890,000 Total programme value Report P37
  • £5,414,239 Total committed spend to date across the programme Report P37

Options considered

  • Chosen: Ten_05 Tudor Fields: deliver lighter touch walking and cycling route with reduced £1m budget and reallocate remaining funding. Highways-led escape route not viable within funding envelope; Environment Agency requirements increased Report P24, P74
  • Rejected: Ten_05 Tudor Fields: cease project and reallocate total sum of funding. Would fail to deliver improvements to active travel in Jaywick Sands Report P24
  • Chosen: Ten_06 Jaywick Healthy Homes: use capital funding for improvements to Enterprise Centre and allocate revenue funding for enforcement. Capital cannot fund enforcement activity; Enterprise Centre improvements extend scope to support the team's operations Report P24, P27
  • Rejected: Ten_06 Jaywick Healthy Homes: proceed with property acquisition. Limited opportunity to improve the area at this level of funding Report P24
  • Chosen: Ten_13 Town Centre Building: end project and reallocate funding. Asking price substantially above fair market value; access for surveys not granted; unable to demonstrate substantial start by March 2026 Report P24, P74
  • Rejected: Ten_13 Town Centre Building: proceed with acquisition. Discrepancy between market value and asking price prevents value for money under Treasury Green Book Report P24, P32
  • Rejected: Not reallocating funding away from at-risk projects. Funding would be subject to return to MHCLG, which could impact the Council's ability to access future Government funding Report P23

Implications

  • Financial: Section 50 grant administered by TDC; S151 Officer will need to provide signed statement that grant has been used for funded activities; further reallocations between projects may be required as tenders return. Report P28, P38, P46, P53
  • Legal: Ten_06 enforcement approach relies on Town and Country Planning Act 1984 Section 215 and Building Act Sections 77 and 79; HRA-held land on Ten_05 and Ten_09 is subject to the Housing Act 1985; Levelling Up and Regeneration Act 2023 High Street Rental Auction power has been appraised for Ten_13. Report P32, P33, P34
  • Equalities: An Equality Impact Assessment has been completed for each project within the Project Initiation Documents. Report P58
  • Climate: Projects offer benefits in line with the Council's Climate Action Strategy 2024 to 2027; detailed sustainability strategies are included within consultant scopes as part of RIBA Stage 1 deliverables. Report P64
  • Risk: Ten_11 Martello Tower E presents the highest deliverability risk due to its inherent complexities and the need for Scheduled Monument Consent; Senior Finance Manager recruitment has been unsuccessful on first advert and is out to advert a second time. Report P48, P53, P55
  • Staffing: Project Delivery Unit now has Manager, Administrative Support, Project Manager and Communications Lead in post, with Senior Finance Manager recruitment ongoing; PDU review planned for spring 2026. Report P39, P44
  • Other: Assets affected or created by CRP2 will be relevant to a future combined authority under Local Government Reorganisation; assignment clauses are to be included in contract documentation to pass rectification periods to any successor authority. Report P62, P63

Who and where

  • West Clacton and Jaywick Sands; St James; Coppins; Bluehouse; Cann Hall; Pier; St Paul's; St John's; Burrsville; Eastcliff; St Bartholomew's wards Report P67
  • Ministry of Housing, Communities and Local Government as funder under the Memorandum of Understanding dated 18 September 2024 Report P30, P77
  • Essex County Council and East Suffolk and North Essex NHS Foundation Trust as partner delivery bodies Report P7, P69
  • Local groups based at the Jaywick Enterprise Centre including Dig for Jaywick, Signpost, Jaywick Sands Community Forum and Essex Pedal Power Report P27
  • Tendring District Council as accountable body, including the Project Delivery Unit and the Regeneration Capital Delivery Board Report P18, P39, P46

Timeline

  • 2 September 2025: Proposed decision published in the Notice of forthcoming decisions Report P28
  • Q3 2025/6: Procurement of main contractor for Ten_04 Sunspot Solar Panels; pre-construction services agreement for Ten_05 Tudor Fields; enforcement action enacted on Ten_06; outreach and grant delivery for Ten_08; design development for Ten_09; planning application submission for Ten_10 Report P51
  • Q4 2025/6: Construction and delivery of Ten_04; statutory consent preparation for Ten_05 and Ten_12; variation to ECC funding agreement and funding transfer for Ten_07; grant delivery close for Ten_08; main contractor procurement for Ten_09 and first stage of Ten_10 and Ten_11 Report P51
  • March 2026: MHCLG deadline for demonstrating substantial start and commitment to CRP2 projects Report P16, P17
  • April 2026: Expected completion of Ten_14 Cultural masterplanning Report P72
  • Q1 2026/7: Determination of Ten_10 planning application at Planning Committee; construction delivery agreement for Ten_12 Report P51
  • Q2 2026/7: Commencement of works on site for Ten_10 Seafront Micro Venue Report P51
  • 11 November 2026: Current expiration date of the Project Delivery Unit, subject to review in spring 2026 Report P44
  • 2027: Fit out of Clacton Skills Hub (Ten_03) to complete following construction of the new Clacton Library by ECC Report P72

Plain English for the jargon

  • CRP2: Community Regeneration Partnership, the second wave programme of funding from MHCLG for Clacton and Jaywick
  • MHCLG: Ministry of Housing, Communities and Local Government, the government department providing the funding
  • MOU: Memorandum of Understanding dated 18 September 2024 between the Council and MHCLG
  • PID: Project Initiation Document setting out scope, governance, costs and timeline for each project
  • ECC: Essex County Council, a delivery partner for several projects
  • ESNEFT: East Suffolk and North Essex NHS Foundation Trust, delivery partner for the Urgent Treatment Centre
  • PDU: Project Delivery Unit, the team managing the CRP2 and related programmes
  • HRA: Housing Revenue Account, holding some of the land affected by Ten_05 and Ten_09
  • S151 Officer: The Council's Chief Finance Officer, required to sign a statement that the grant has been used for the funded activities
  • LGR: Local Government Reorganisation, affecting the future status of the assets created by CRP2
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item77

Resolved

RESOLVED that Cabinet - (a) approves the reallocation of funding within the programme as set out below, for t he purposes of contingency; the opportunity to add quality and value to the schemes; deliver within tight programme deadlines; and manage organisational capacity: i. to no longer pursue the Ten_13 Town Centre Building project, reallocating the £5m capital funding set out within the MOU elsewhere within the programme; ii. reallocate £1.5m of the capital funding allocated to the Ten_05 Tudor Fields project within the programme, and for this Council to progress the delivery of a iii. walking and cycling route only with the remaining £1m allocation, and for a Project Initiation Document to be presented to the Portfolio Holders for iv. Leisure & Public Realm and Housing & Planning for their approval; v. reallocate £100,000 the capital funding allocated to the Ten_06 Jaywick Healthy Buildings project within the programme, and to rescope the project to include works to the Enterprise Centre to support the team’s operations, with a Project Initiation Document to be presented to the Portfolio Holders for Assets & Community Safety and Housing & Planning for their approval; vi. allocate an additional £50,000 Capital to the Ten_04 Sunspot Solar Panels project, raising the total project budget to £200,000; vii. allocate an additional £2.5m Capital to the Ten_07 Clacton Town Centre Public Realm project, raising the total project budget to £3. 8m; viii. allocate an additional £200,000 Capital to the Ten_08 Jaywick and Clacton Shopfront Improvements project, raising the total project budget to ix. £700,000, with a sum of £150,000 ringfenced for grants in Jaywick Sands; x. allocate an additional £1.2m Capital to the Ten_09 Jaywick Sands Open Spaces project, raising the total project budget to £3. 2m; xi. allocate an additional £400,000 Capital to the Ten_10 Seafront Micro Venue project, raising the total project budget to £900,000; xii. allocate an additional £1.5m Capital to the Ten_11 Martello Tower E project, raising the total project budget to £3.5m; and xiii. allocate an additional £750,000 Capital to the Ten_12 Active Wellbeing Centre Phase 1 project, raising the total project budget to £3.75m. (b) allocates £200,000 of revenue funding to the Ten_06 Jaywick Healthy Buildings project to progress an approach to achieve the intended outputs & outcomes through enforcement; (c) requires the £200,000 funding to be delivered via the capitalising of project management time of the Project Delivery Unit across the various CRP2 projects through existing delegations and / or financial performance reports as necessary; (d) authorises the Portfolio Holder for Economic Growth, Regeneration and Tourism, in consultation with the supporting Portfolio Holder for each project, to approve Change Control Notices setting out the detailed implications and implementation of the above; and (e) notes the requirement from MHCLG that a substantial start and commitment to projects within the Community Regeneration Partnership (CRP2) programme can be demonstrated by March 2026.
Word for word from the decision Tendring published for this meeting. Source: tdcdemocracy.tendringdc.gov.uk

Follow this further

Built from Tendring's papers

What the report saysPro

Report to Cabinet

__ CABINET

14 NOVEMBER 2025

REPORT OF PORTFOLIO HOLDER FOR ECONOMIC GROWTH, REGENERATION AND TOURISM

A.4 COMMUNITY REGENERATION PARTNERSHIP (CRP2) – PROGRAMME UPDATE AND REALLOCATION OF FUNDING

PART 1 – KEY INFORMATION

PURPOSE OF THE REPORT To update Cabinet on progress on the Community Regeneration Partnership (CRP2) programme and recommend Cabinet agree the reallocation of funding within the programme, including: - removal of Ten_13 Town Centre Building from the programme scope; - rescoping of Ten_05 Tudor Fields – Jaywick walking route and reduction of funding; - increasing the budget to the following projects: o Ten_04 Sunspot Solar Panels; o Ten_07 Clacton Town Centre and Seafront Public Realm; o Ten_08 Jaywick and Clacton Shopfront Improvements; o Ten_09 Jaywick Sands Public Open Space; o Ten_10 Seafront Arts/Community Micro Venue; o Ten_11 Repurposing Martello Tower E; o Ten_12 Active Wellbeing Centre Phase 1 and inclusive cycling facility; - approval of an alternative approach to Ten_06 Expanding the Housing Work of the Healthy Homes Initiative.

EXECUTIVE SUMMARY Work to date Since Cabinet’s decisions in December 2024 (First Wave) and March 2025 (Second Wave), significant progress has been made across the Community Regeneration Partnership (CRP2) programme. • Project Initiation Documents (PIDs) have been developed for all projects, with eight of the ten Tendring District Council-led projects approved by Portfolio Holders in August 2025. The outstanding two relate to Ten_06 Extending the Work of the Healthy Homes Initiative and Ten_13 Town Centre Building, which are discussed later in this report. • Partner-led projects have also progressed, with agreements sealed with Essex County Council (ECC) and funding transferred—excluding Ten_05 Tudor Fields, which is undergoing rescoping. The agreement with ESNEFT, for Ten_15 Urgent Treatment Centre, has now been sealed and the funding is pending transfer. • Delivery milestones have been achieved across several projects, including sealed funding agreements and active delivery on Ten_01 Bus Infrastructure, Ten_02 Community Transport Buses, Ten_03 Clacton Skills Hub, Ten_14 Cultural Masterplanning, and Ten_15 Urgent Treatment Centre.

Cabinet is reminded that the suite of Capital Regeneration Partnership projects was chosen by Government ministers after a ‘deep dive’ from officials into Clacton and Jaywick. The Council has sought to implement all projects proposed, but it has not been possible in every case. Feasibility work has identified that the deliverable risks (in the context of the funding agreement / milestones) for two projects (Ten_05 Tudor Fields and Ten_13 Town Centre Building) are too high in their original form. As a result, Cabinet approval is now sought to reallocate funding within the programme to ensure full delivery within the terms of the Memorandum of Understanding (MOU), that in turn supports the management of capacity and contingency sums, adding value and meeting associated spending deadlines.

Reallocation of funding within the programme The consultation & engagement established the following key principles: - All projects within the programme must be feasible and deliverable; - The balance of funding between Clacton-on-Sea and Jaywick Sands should be retained; - Confidence that the full sum of funding can be expended within the programme; - To prioritise supporting the existing projects within the programme, as per the allocations made by MHCLG as the funder, as opposed to seeking to add additional projects to the programme; - Reallocation to be mindful of the Council’s capacity and seek to collaborate with delivery partners where possible.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A4 Appendix 1: CRP2 UpdateAppendix 226 KB Download
PDF
Cabinet Members' Items: Report of the Economic Growth, Regeneration & Tourism Portfolio Holder: A.4: Community Regeneration Partnership (CRP2): Programme Update and Reallocation of FundingReport 607 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 25 attended
MS
Councillor Mark StephensonChairman, present
IH
Councillor Ivan HendersonCommittee Member, present
AB
Councillor Andy BakerCommittee Member, present
MB
Councillor Mick BarryCommittee Member, present
PK
Councillor Peter KotzCommittee Member, present
GP
Councillor Gina PlaceyCommittee Member, present
GS
Councillor Gary ScottCommittee Member, present
AS
Councillor Adrian SmithCommittee Member, apologies (other health-related reason)
JB
Councillor Jeff BraySpokesperson, in attendance
JC
Councillor Jayne Chapman BEMSpokesperson, in attendance
PH
Councillor Paul HoneywoodSpokesperson, in attendance
ID
Ian DavidsonOfficer, in attendance

All 25 on the meeting page

On this subject at Tendring

Search all
  1. Cabinet Members' Items - Report of the Economic Growth, Regeneration & Tourism Portfolio Holder - A.4 - Community Regeneration Partnership (CRP2) - Programme Update and Reallocation of FundingThis decision
  2. Cabinet Members' Items - Report of the Portfolio Holder for Corporate Finance & Governance - A.1 - Financial Performance Report 2026/27 - General Update at the end of September 2026Approved
  3. Cabinet Members' Items - Report of the Corporate Finance & Governance Portfolio Holder - A.2 - The Local Council Tax Support Scheme, Discretionary Council Tax Exemptions / Discounts / Premiums for 2027/28 and Annual Minimum Revenue Provision Policy Statement 2027/28Agreed
  4. Cabinet Members' Items - Report of the Housing & Planning Portfolio Holder - A.3 - Annual Housing Improvement, Performance & Assurance Report 2025/26Decided
  5. Cabinet Members' Items - Report of the Housing & Planning Portfolio Holder - A.4 - Adoption of the Conservation Area Character Appraisals and Management Plans for St Osyth and Manningtree & MistleyNoted
  6. Cabinet Members' Items - Report of the Portfolio Holder for Corporate Finance & Governance Portfolio Holder - A.1 - Financial Performance Report 2026/27 - General Update at the end of June 2026Approved

More from Tendring Cabinet

All decisions
MeetingDecisionOutcome
13 Nov 2026 Minutes of the Last MeetingRESOLVED that the minutes of the meeting of the Cabinet, held on Friday 23 October 2026, be approved as a correct rec... Approved Open
13 Nov 2026 Cabinet Members' Items - Report of the Portfolio Holder for Corporate Finance & Governance - A.1 - Financial Performance Report 2026/27 - General Update at the end of September 2026RESOLVED that Cabinet – (a) notes the Council’s in-year financial position as at the end of September 2026; (b) appro... Approved Open
13 Nov 2026 Cabinet Members' Items - Report of the Corporate Finance & Governance Portfolio Holder - A.2 - The Local Council Tax Support Scheme, Discretionary Council Tax Exemptions / Discounts / Premiums for 2027/28 and Annual Minimum Revenue Provision Policy Statement 2027/28RESOLVED that Cabinet – a) agrees that the underlying LCTS scheme for 2027/28 remains the same as the current year, a... Agreed Open
13 Nov 2026 Cabinet Members' Items - Report of the Housing & Planning Portfolio Holder - A.3 - Annual Housing Improvement, Performance & Assurance Report 2025/26RESOLVED that Cabinet – (a) notes the contents of the Annual Housing Improvement, Performance & Assurance Report 2025... Decided Open
13 Nov 2026 Cabinet Members' Items - Report of the Housing & Planning Portfolio Holder - A.4 - Adoption of the Conservation Area Character Appraisals and Management Plans for St Osyth and Manningtree & MistleyRESOLVED that – (a) the outcome of the public consultation exercises summarised in this report (A.4) be noted; and (b... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies