A01 F/TH/25/0961 Land West Of Thanet Offshore Wind Port Of Ramsgate Royal Harbour Approach Ramsgate KentPlanning Committee
AGREED, subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. GROUND: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Purchase Act 2004). 2 The development hereby approved shall be carried out in accordance with the submitted drawings numbered 0120 Rev P01 received 08/04/2026, 0130 Rev P07, 0131 Rev P07, 0132 Rev P07, 0133 Rev P06, 0100 Rev P04 received 20/03/2026, RAMS-TFCGC-00-D-L-1001 Rev P10 received 17/03/2026, ECO-3288-XT-001 Rev 02, EDS-073102.01 Sht 1 of 3 Rev A, EDS-07-3102.01 Sht 2 of 3 Rev A, EDS-07-3102.01 Sht 3 of 3 Rev A GROUND: To secure the proper development of the area. 3 Development shall not begin in any phase until a detailed sustainable surface water drainage scheme for the site has been submitted to (and approved in writing by) the local planning authority. The submitted scheme shall demonstrate compliance with the required technical standards at the time of submission and shall demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100 year storm) can be accommodated and disposed of without increase to flood risk on or off-site. The drainage scheme shall also demonstrate (with reference to published guidance): · that silt and pollutants resulting from the site use can be adequately managed to ensure there is no pollution risk to receiving waters. · appropriate operational, maintenance and access requirements for each drainage feature or SuDS component are adequately considered, including the proposed arrangements for future ongoing management and maintenance. The drainage scheme shall be implemented in accordance with the approved details. GROUND: To ensure the development is served by satisfactory arrangements for the disposal of surface water and to ensure that the development does not exacerbate the risk of on/off site flooding. These details and accompanying calculations are required prior to the commencement of the development as they form an intrinsic part of the proposal, the approval of which cannot be disaggregated from the carrying out of the rest of the development. 4 No building on any phase (or within an agreed implementation schedule) of the development hereby permitted shall be occupied until a Verification Report, pertaining to the surface water drainage system and prepared by a suitably competent person, has been submitted to and approved by the Local Planning Authority. The Report shall demonstrate that the drainage system constructed is consistent with that which was approved. The Report shall contain information and evidence (including photographs) of details and locations of inlets, outlets and control structures; landscape plans; full as built drawings; information pertinent to the installation of those items identified on the critical drainage assets drawing; and, the submission of an operation and maintenance manual for the sustainable drainage scheme as constructed. GROUND: To ... view the full minutes text for item 4a