That the local planning authority formally determine pursuant to regulation 61 of the Conservation of Habitats and Species Regulations 2010 (as amended), and on the basis of the information available, that the development proposed will not have a likely significant effect on a European site either alone or in combination with other plans or projects. The Committee then considered and debated on the proposal before them and noted that the nearest residential property to the site was approximately 2km away. It was proposed by Councillor Hipsey and Seconded by Councillor Ojetola that the application be approved, subject to the conditions detailed in the report. For: Councillor Hipsey, Councillor Little, Councillor Curtis, Councillor Kelly, Councillor Ojetola, Councillor Palmer, Councillor Ray and Councillor Rice. Against: None Abstain: None That the application be approved subject to the conditions detailed within the report.
Word for word from the decision Thurrock published for this meeting.Source: democracy.thurrock.gov.uk
Planning Committee 5 March 2015 Application Reference: 14/00215/FUL
Reference: Site: 14/00215/FUL Land At Thames Haven The Manorway Coryton Essex
Ward: Proposal: Corringham And Erection of an Energy Recovery Centre [comprising an Fobbing Advanced Conversion Technology (ACT) 8-12 MWe pyrolysis plant and an Anaerobic Digestion (AD) 2-3 MWe facility with an integrated education centre] together with access improvements, landscaping and associated works
Plan Number(s): Reference Name Received CPPL-02/00-01 Site Location Plan 28.02.14 CPPL-02/00-02 Site Location Plan with Aerial Photograph 28.02.14 CPPL-02/05-01 Site Sections 28.02.14 CPPL-02/10-01 Proposed Site Layout 28.02.14 CPPL-02/10-02 Proposed Floor Plan Level 00 28.02.14 CPPL-02/10-03 Proposed Floor Plan Level 01 28.02.14 CPPL-02/10-04 Proposed Floor Plan Roof Level 28.02.14 CPPL-02/10-05 Proposed Floor Plan (Levels 00 & 01) Office, 28.02.14 Education & Reception Areas CPPL-02/20-01 Proposed Sections 28.02.14 CPPL-02/20-02 Proposed Sections 2 (Extended) Sheet 1 of 3 28.02.14 CPPL-02/30-01 Proposed Elevations 1 28.02.14 CPPL-02/30-02 Proposed Elevations 2 AD Tanks 28.02.14
The application is also accompanied by:
Community Involvement Report Environment Statement – Main Text Environment Statement – Technical Appendices Environment Statement – Non-Technical Summary Environment Statement - Addendum Transport Assessment Transport Assessment – Addendum Sequential Test: Evidence Base Energy Statement Sustainability Statement BREEAM Pre-Assessment Planning Statement Planning Committee 5 March 2015 Application Reference: 14/00215/FUL
Design and Access Statement
Applicant: Validated: Clean Power Properties Ltd. & Network Rail 5 March 2014 Infrastructure Ltd. Date of expiry: 31 March 2015 Recommendation: APPROVAL – subject to conditions
1.0DESCRIPTION OF PROPOSAL
1.1In summary, the application proposes the construction and operation of a facility to process non-hazardous household and commercial waste in order generate renewable energy (electricity) using the technologies of Advanced Conversion Technology (ACT) and Anaerobic Digestion (AD). The main elements of the proposals are described in the table below:
Site Area 2.3 hectares Floorspace 5,710 sq.m. Employment Approximately 34 full time employees Vehicle Trips 128 HGV trips (64 lorries) daily 22 car trips (11 cars) daily Based on a worst case scenario assuming all movements by road Inputs approx. 128,000 tonnes per annum of municipal solid and commercial & industrial waste approx. 67,000 tonnes per annum of biodegradable organic wastes
TOTAL 195,000 tonnes per annum Outputs 10-15 MWe electrical power approx. 38,500 tonnes per annum of recyclable material
1.2Inputs:
The proposed facility would process up to 195,000 tonnes of waste per annum, comprising up to 128,000 tonnes per annum (tpa) of municipal solid waste (MSW) and commercial and industrial waste (C&I) and up to 67,000 tpa of biodegradable organic wastes. The facility will not accept hazardous waste and if such waste is encountered during processing it would be separated for transfer to an appropriate treatment or disposal facility.
1.3Processes:
Wastes would be delivered to a sealed reception area located at the northern-end of the treatment building. The application assumes a ‘worst case’ scenario whereby Planning Committee 5 March 2015 Application Reference: 14/00215/FUL
all wastes are brought to the site by road, although the submitted layout plan refers to a future rail interface area to allow for the future transfer of material by rail. The waste reception area is operated under negative pressure, for the purposes of odour control. A dedicated Anaerobic Digestion (AD) bay would receive pure biomass matter with solid biodegradable waste to be macerated, blended and pumped directly to digestion tanks. A slurry tank would receive liquid wastes for AD.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.