Town Lock Capital Project

Noted Planning 1 paper

Planning and Transportation Advisory Board noted this item on Tuesday 11 March 2014. Below is the council's own wording, with the papers it was decided on.

ItemPE 14/11

Resolved

Decision Notice D140031MEM The report provided an update on progress and set out a programme for the implementation of the scheme. Members noted that a start date on site was now anticipated for July 2014, which allowed the majority of the work to be completed during the summer months when working conditions were most favourable. Completion of the project would be around October/November dependent upon the contractor’s approved construction programme. In addition, the Advisory Board had every confidence that the objectives of officers were the same as local Members in getting the Town Lock area reinvigorated. RECOMMENDED : That the progress made towards implementing the Town Lock capital project be noted and the programme as set out in the report be approved.
Word for word from the decision Tonbridge and Malling published for this meeting. Source: democracy.tmbc.gov.uk

Follow this further

Built from Tonbridge and Malling's papers

What the report saysPro

Report to Planning and Transportation Advisory Board

Background

1.1.1 I last reported to members on the Town Lock project at the meeting of this Board on 4 June 2013. At that time the detailed design was being finalised so that the scheme could be costed prior to inviting tenders for construction. Members may recall that, in the context of a fixed scheme budget, I had highlighted the possibility that elements of the design would need to be reviewed if the estimated cost exceeded that budget.

1.1.2 In the event, the estimate did indeed exceed the budget and so I was prevented from proceeding to tender stage. This is frustrating, but not uncommon, particularly with schemes involving features such as engineering near the river which are often difficult to cost. There followed a period of working with the Environment Agency and Halcrow, the designers, to redesign various elements of the scheme such that the costs could be reduced to an affordable level. This process has been necessarily time consuming in order to retain the essential project requirements and function without significant loss of overall quality. The scheme has now reached the limits of what can be achieved by ‘value engineering’ and so it is appropriate to now continue to tender to determine the ‘real’ cost of building the revised scheme.

1.2What has been done?

1.2.1 The scheme ‘plan’ has not had any fundamental changes, although individual elements of the scheme have been critically scrutinised to see how they might be provided in a less expensive way.

1.2.2 The key focus of the value engineering has been upon lighting and upon the flood wall. The lighting has been simplified such that there will be a ‘lit way’ through the

P&TAB-NKD-Part 1 Public 11 March 2014 2

scheme rather than an attempt to provide lighting to all areas of open space. This takes account of reflected light from adjacent buildings and is better in environmental terms such as light pollution and power consumption.

1.2.3 The reinforced concrete flood wall has been replaced for a significant part of the scheme by a masonry wall/earth bund composite structure which will be equally as effective. The brick cladding and coping to the remaining concrete flood wall has been deleted. Some railings have been deleted consistent with the existing similar areas in Medway Wharf Road.

1.2.4 Elsewhere, small changes have been made to a number of other elements which cumulatively will all help in reducing cost.

1.3Programme for Implementation

1.3.1 The revised drawings and tender documents are programmed to be completed by the end of March which will allow tenders to be received and analysed during May.

1.3.2 A start on site is now anticipated for July 2014, which will allow the majority of construction work to be completed during the summer months when working conditions are most favourable. Completion will be around October/November dependent upon the contractor’s approved construction programme.

1.4.1 None arising from this report.

1.5Financial and Value for Money Considerations

1.5.1 The scheme budget is currently fixed at £791,600, funded from a variety of sources including contributions from nearby development, funds from the Environment Agency and the Council’s own capital plan funding.

1.6Risk Assessment

1.6.1 There is still a risk that a tender will not returned within the available budget and a further review might prove necessary in those circumstances.

Recommendations

1.7.1 That Members NOTE the update on progress towards implementing the Town Lock capital project and APPROVE the programme as outlined.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Town Lock Capital ProjectReport 38 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 22 attended
DD
Councillor Dave Davis CEng, FICEChairman, apologies
MP
Councillor Mike Parry-WallerCommittee Member, present
JA
Councillor Julian AtkinsCommittee Member, present
MJ
Councillor Mrs Jeannett BellamyCommittee Member, present
MV
Councillor Ms Vivian BransonCommittee Member, present
RC
Councillor Rodney Chartres BSc (Hons), CEng, CSci, CGeol, CEnv, MICE, FGSCommittee Member, absent
DC
Councillor David CureCommittee Member, present
MD
Councillor Mark DavisCommittee Member, present
MA
Councillor Mrs Ann KempCommittee Member, present
RL
Councillor Russell Lancaster BA (Hons)Committee Member, present
DS
Councillor David SmithCommittee Member, present
AS
Councillor Allan SullivanCommittee Member, present

All 22 on the meeting page

More from Tonbridge and Malling Planning and Transportation Advisory Board

All decisions
MeetingDecisionOutcome
1 Mar 2022 MinutesThat the notes of the meeting of the Planning and Transportation Advisory Board held on 10 November 2021 be approved ... Approved Open
10 Nov 2021 MinutesThat the notes of the meeting of the Planning and Transportation Advisory Board held on 29 June 2021 be approved as a... Approved Open
10 Nov 2021 Exclusion of Press and PublicThat as public discussion would disclose exempt information the following matters be considered in private. Decided Open
29 Jun 2021 MinutesThat the notes of the meeting of the Planning and Transportation Advisory Board held on 17 May 2021 be approved as a ... Approved Open
29 Jun 2021 Exclusion of Press and PublicThat as public discussion would disclose exempt information, the following matters be considered in private. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies