Resolved
That the following be commended to the Borough Council Cabinet The work to date and the next steps as set out in the report be noted.
Joint Transportation Board noted this item on Monday 22 September 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
That the following be commended to the Borough Council Cabinet The work to date and the next steps as set out in the report be noted.
1.1.1 It was agreed by the Joint Transportation Board (JTB) in December that Kent County Council (KCC) would advance the agreed streetscape and traffic management improvements for the lower High Street to their detailed design and costing stage in 2014.
1.1.2 KCC commissioned its design consultant, Amey, to progress the necessary detailed design and costing work for the lower High Street improvement scheme in January 2014. To date, baseline traffic counts and pedestrian crossing surveys have been undertaken, which informed the design process. A full drainage survey was carried out and an Environmental Scoping Assessment produced; the outcomes of which also informed the design process.
1.1.3 The High Street scheme formed part of the South East Local Enterprise Partnership (SELEP) Strategic Economic Plan (SEP), which was submitted to Government at the end of March for a share of the Government’s Single Local Growth Fund (SLGF).
1.2Progress to Date
1.2.1 In July 2014 awards made to each of the 39 LEPs in England were announced. The High Street scheme (Tonbridge town centre regeneration) was awarded a SLGF allocation of £2.37 million.
1.2.2 It should be noted that receipt of the SLGF award of £2.37 million is subject to the scheme business case being accepted by the LEP.
JTB - Part 1 Public 22 September 2014 2
1.2.3 Nevertheless, with £250k from KCC (resulting from the abandonment of the Hadlow Road to London Road link), the total amount available for the High Street scheme is £2.62 million on the basis that other current public and private investment in the town centre is considered as ‘match’ funding.
1.2.4 Detailed design of the scheme is at an advanced stage and includes input from KCC Transport Innovations team in relation to pedestrian information displays and cycling improvement measures.
1.2.5 Surveys have recently been undertaken on delivery arrangements and this has informed the locations of proposed formal loading/unloading bays on the High Street. Loading/unloading bays have been strategically located on the High Street to ensure businesses that do not have on-site delivery facilities are adequately served.
1.3Next Steps
1.3.1 A financial capital business case for the scheme submitted to PAG (KCC’s Project Advisory Group) for approval on 19 September.
1.3.2 Develop scheme business case to the requirements of Department for Transport providing business justification with supporting evidence.
1.3.3 Continue with detailed design including further drainage design and rationalisation of pedestrian crossing facilities.
1.3.4 Liaise with KCC street lighting team about coordinating maintenance work on street lighting.
1.3.5 Investigate interchange improvements outside Tonbridge railway station with buses stopping outside the station.
1.3.6 Arrange a further Member briefing session before presenting the detailed design, including layout plans and cost estimates to the Board for final approval.
1.3.7 Optimise signal timings, and upgrade equipment if necessary at Hadlow Road/Cannon Lane junction. Review position of stop line on Bordyke approach.
1.3.8 Achieve optimum layout of the Five Ways junction (Shipbourne Road/London Road) to reduce queuing at peak times and ensure that school-related pedestrian and cycle traffic is not compromised in terms of safety and flow.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Tonbridge Town Centre Transport Strategy: UpdateReport | 40 KB | DownloadRead as text |
Follow Joint Transportation Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Dec 2024 | Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. | Noted | Open |
| 2 Dec 2024 | Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... | Noted | Open |
| 17 Jun 2024 | Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. | Decided | Open |
| 21 Nov 2022 | Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... | Decided | Open |
| 6 Jun 2022 | Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.