A228/M20 Junction 4 - Eastern Overbridge Widening

Decided Committee 1 paper

Joint Transportation Board decided this item on Monday 13 March 2017. Below is the council's own wording, with the papers it was decided on.

ItemJTB 17/6

Resolved

That (1) the Cabinet Member for Environment and Transport, Kent County Council, be advised that the Joint Transportation Board (Tonbridge and Malling ) supports the proposal to publish Traffic Regulation Orders and to carry out works to permanently ban the right hand movement out of Castle Way, including associated works at Park Road Roundabout; and (2) the local community be advised accordingly.
Word for word from the decision Tonbridge and Malling published for this meeting. Source: democracy.tmbc.gov.uk

Follow this further

Built from Tonbridge and Malling's papers

What the report saysPro

Report to Joint Transportation Board

A228/M20 Junction 4 - Eastern Overbridge Widening

To: Tonbridge & Malling Joint Transportation Board - 13 March 2017

Main Portfolio Area: Growth, Environment & Transport

By: Roger Wilkin, Director of Highways & Transportation

Classification: For Decision

Ward: West Malling & Leybourne and Downs & Mereworth Division: Malling North

Summary: Progress report on M20 Junction 4 overbridge widening scheme and Castle Way right turn ban recommendation

1.0Introduction

1.1Members will be aware of the scheme to widen the eastern bridge of M20 Junction 4 (J4) and issues relating to the Castle Way right turn out towards J4 from previous reports and attendance by officers at meetings of this Board - most recently September 2016.

1.2This report gives a further update on completion of the bridge widening scheme and a discussion on the Castle Way right turn issues leading to a recommendation that the existing temporary ban should be made permanent.

2.0J4 Bridge Widening

2.1The scheme, in the sense of the additional lane becoming available for traffic use, was completed at the end of January 2017. The works are substantially complete but at the time of writing there remains some minor signing and safety barrier protection works to be completed.

2.2The scheme has included 'yellow box' markings that have been a frequent request by users of the junction. The provision of 'yellow boxes' only became a viable possibility following the publication of new traffic sign regulations that give more flexibility in terms of layout. As a consequence smaller yellow boxes have been provided at the main crossover areas.

2.3At Highways England's request, and at their cost, some resurfacing of the motorway has been carried on all three lanes in both directions through the junction. It was in a poor condition and advantage was taken to undertake the work while still in occupation of the site. 2.4 The surfacing on the western overbridge is also in a poor condition with potholes frequently requiring attention. The intention had been to resurface the bridge as part of the widening contract but the waterproofing layer also needs to be replaced. It would be more sensible to arrange this work as a separate activity when the weather is more suitable in the spring or summer. Further 'yellow boxes' will be provided on that side of the gyratory after the resurfacing when the road markings are redone.

2.5The bridge widening works have taken over three months longer than originally anticipated. This is regretted by all parties involved in the project who apologise for the added inconvenience this has caused for drivers using the junction. Unfortunately it was only possible to partly recover some of the delays caused by the earlier foundation piling problems. The consequential impacts of reduced daylight and poorer weather further delayed the later construction activities and particularly surfacing works which are particularly weather and temperature dependent.

2.6As with any new road scheme the operation of the junction and signal timings will be monitored and adjusted as necessary so that the junction can operate as efficiently and safely as possible.

3.0Castle Way Background 3.1 The right turn out of Castle Way towards J4 was temporarily banned to assist traffic management during the construction of the bridge widening works. The unusual junction layout has been the subject of comment for many years and the opportunity was taken to review the situation to see if the right turn should be permanently banned. Although the J4 works have been completed the temporary ban is being maintained until a formal decision is taken.

Consultation 3.2 A Newsletter was distributed in August 2016 giving a summary of the likely advantages and disadvantages of making the right turn ban permanent with a simple 'tear off' comment strip asking residents if they agreed or disagreed. Responses could also be made by e mail.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A228/M20 Junction 4: Eastern Overbridge WideningReport 90 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 28 attended
CS
Christopher SmithChairman, present
HR
Councillor Howard RogersVice-Chair, present
DD
Councillor Dave Davis CEng FICECommittee Member, present
MA
Councillor Mrs Ann KempCommittee Member, present
RL
Councillor Russell Lancaster BA (Hons)Committee Member, present
DL
Councillor David LettingtonCommittee Member, present
MP
Councillor Mike Parry-WallerCommittee Member, present
MT
Councillor Mike TaylorCommittee Member, present
MB
Matthew BalfourCommittee Member, present
TD
Trudy DeanCommittee Member, present
SH
Sarah HohlerCommittee Member, apologies
PH
Peter HomewoodCommittee Member, present

All 28 on the meeting page

More from Tonbridge and Malling Joint Transportation Board

All decisions
MeetingDecisionOutcome
2 Dec 2024 Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. Noted Open
2 Dec 2024 Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... Noted Open
17 Jun 2024 Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. Decided Open
21 Nov 2022 Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... Decided Open
6 Jun 2022 Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies