That (1) the Cabinet Member for Environment and Transport, Kent County Council, be advised that the Joint Transportation Board (Tonbridge and Malling ) supports the proposal to publish Traffic Regulation Orders and to carry out works to permanently ban the right hand movement out of Castle Way, including associated works at Park Road Roundabout; and (2) the local community be advised accordingly.
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
To: Tonbridge & Malling Joint Transportation Board - 13 March 2017
Main Portfolio Area: Growth, Environment & Transport
By: Roger Wilkin, Director of Highways & Transportation
Classification: For Decision
Ward: West Malling & Leybourne and Downs & Mereworth Division: Malling North
Summary: Progress report on M20 Junction 4 overbridge widening scheme and Castle Way right turn ban recommendation
1.0Introduction
1.1Members will be aware of the scheme to widen the eastern bridge of M20 Junction 4 (J4) and issues relating to the Castle Way right turn out towards J4 from previous reports and attendance by officers at meetings of this Board - most recently September 2016.
1.2This report gives a further update on completion of the bridge widening scheme and a discussion on the Castle Way right turn issues leading to a recommendation that the existing temporary ban should be made permanent.
2.0J4 Bridge Widening
2.1The scheme, in the sense of the additional lane becoming available for traffic use, was completed at the end of January 2017. The works are substantially complete but at the time of writing there remains some minor signing and safety barrier protection works to be completed.
2.2The scheme has included 'yellow box' markings that have been a frequent request by users of the junction. The provision of 'yellow boxes' only became a viable possibility following the publication of new traffic sign regulations that give more flexibility in terms of layout. As a consequence smaller yellow boxes have been provided at the main crossover areas.
2.3At Highways England's request, and at their cost, some resurfacing of the motorway has been carried on all three lanes in both directions through the junction. It was in a poor condition and advantage was taken to undertake the work while still in occupation of the site. 2.4 The surfacing on the western overbridge is also in a poor condition with potholes frequently requiring attention. The intention had been to resurface the bridge as part of the widening contract but the waterproofing layer also needs to be replaced. It would be more sensible to arrange this work as a separate activity when the weather is more suitable in the spring or summer. Further 'yellow boxes' will be provided on that side of the gyratory after the resurfacing when the road markings are redone.
2.5The bridge widening works have taken over three months longer than originally anticipated. This is regretted by all parties involved in the project who apologise for the added inconvenience this has caused for drivers using the junction. Unfortunately it was only possible to partly recover some of the delays caused by the earlier foundation piling problems. The consequential impacts of reduced daylight and poorer weather further delayed the later construction activities and particularly surfacing works which are particularly weather and temperature dependent.
2.6As with any new road scheme the operation of the junction and signal timings will be monitored and adjusted as necessary so that the junction can operate as efficiently and safely as possible.
3.0Castle Way Background 3.1 The right turn out of Castle Way towards J4 was temporarily banned to assist traffic management during the construction of the bridge widening works. The unusual junction layout has been the subject of comment for many years and the opportunity was taken to review the situation to see if the right turn should be permanently banned. Although the J4 works have been completed the temporary ban is being maintained until a formal decision is taken.
Consultation 3.2 A Newsletter was distributed in August 2016 giving a summary of the likely advantages and disadvantages of making the right turn ban permanent with a simple 'tear off' comment strip asking residents if they agreed or disagreed. Responses could also be made by e mail.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Transportation Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.