Tonbridge and Malling Highway Works Programme 2018/19

Noted Committee 1 paper

Joint Transportation Board noted this item on Monday 26 November 2018. Below is the council's own wording, with the papers it was decided on.

ItemJTB 18/32

Resolved

That the report be received and noted.
Word for word from the decision Tonbridge and Malling published for this meeting. Source: democracy.tmbc.gov.uk

Follow this further

Built from Tonbridge and Malling's papers

What the report saysPro

Report to Joint Transportation Board

To: Tonbridge and Malling Joint Transportation Board

By: KCC Highways and Transportation

Date: 26th November 2018

Subject: Highway Works Programme 2018/19

Classification: Information Only

Summary: This report updates Members on the identified schemes approved for construction in 2018/19

1. Introduction

This report provides an update and summarises schemes that have been programmed for delivery in 2018/19

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Transportation and Safety Schemes – see Appendix D

 Casualty Reduction Measures – see Appendix D1  Integrated Transport Schemes – see Appendix D2  Local Growth Fund – see Appendix D3  Third Party Funded Schemes – see Appendix D4

Developer Funded Work – see Appendix E

 Section 278 Works – see Appendix E1  Section 106 Works – see Appendix E2

Bridge Works – see Appendix F

Traffic Systems – see Appendix G

Combined Member Fund – see Appendix H

Tonbridge Interchange Improvements - Progress Report

Conclusion

1. This report is for Members information. Contact Officers:

The following contact officers can be contacted on 03000 418181

Kirstie Williams Mid Kent Highway Manager Mark Simmons Tonbridge & Malling District Manager Alan Casson Senior Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Katie Moreton Drainage & Structures Asset Manager Jamie Hare Development Agreement Manager Jamie Watson Senior Schemes Programme Manager

Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Surface Treatments - Contact Officer Clive Lambourne

Micro Surfacing

Road Name Parish Extent of Works Current Status From Trottiscliffe Road to A227 Taylors Lane Trottiscliffe Wrotham Road Junction (Vigo Completed Hill) From A26 to end of Highway Danns Lane Wateringbury Boundary Completed

Aldon Lane Addington Whole Road Completed

Surface Dressing

Machine Resurfacing – Contact Officer [name removed] Name Parish Extent of Works Current Status

Junction with Mills Road/Hall A20 London Road Aylesford Completed Road

Pembury Road to Lodge Oak Tudeley Lane Tonbridge Completed Lane Appendix B – Drainage

Drainage Repairs & Improvements - Contact Officer Earl Bourner Road Name Parish Description of Works Current Status

Survey cleaning work to identify the London Road Larkfield Awaiting start date issues

New system being installed in two phases phase one on the main London road Ditton Started road phase to on the Queen’s estate

New Hythe lane Larkfield New ACO Awaiting start date

Plaxdale Green Pond clearance waiting for the spoil Malling Awaiting start date Road to dry out before it can be removed

Appendix C – Street Lighting

Structural testing of KCC owned street lights has identified the following as requiring. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement.

Street Lighting Column Replacement – Contact Officer Sue Kinsella

Road Name Parish Description of Works Status

Sheraton Court UKPN cable issue resolved. Walderslade STRUCTURAL JSEN001 REPLACEMENT Awaiting programme date

New Road Out of hours work required – Ditton STRUCTURAL JNAJ001 & JNAJ003 j/w a20 REPLACEMENT

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Tonbridge and Malling Highway Works Programme 2018/19Report 348 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 26 attended
MP
Michael PayneChairman, present
HR
Councillor Howard RogersVice-Chair, present
DD
Councillor Dave Davis CEng FICECommittee Member, present
MA
Councillor Mrs Ann KempCommittee Member, absent
RL
Councillor Russell Lancaster BA (Hons)Committee Member, present
DL
Councillor David LettingtonCommittee Member, present
MP
Councillor Mike Parry-WallerCommittee Member, present
MT
Councillor Mike TaylorCommittee Member, present
MB
Matthew BalfourCommittee Member, present
TD
Trudy DeanCommittee Member, present
SH
Sarah HohlerCommittee Member, present
PH
Peter HomewoodCommittee Member, apologies

All 26 on the meeting page

On this subject at Tonbridge and Malling

Search all
  1. Tonbridge and Malling Highway Works Programme 2018/19This decision
  2. Informing the Audit Risk Assessment for Tonbridge and Malling Borough Council 2025/26Decided
  3. Informing the Audit Risk Assessment for Tonbridge and Malling Borough Council 2024/25Decided
  4. Grant Thornton's Indicative Audit Plan for Tonbridge and Malling Borough CouncilNoted
  5. Tonbridge and Malling Draft Productivity PlanDecided
  6. Informing the Audit Risk Assessment for Tonbridge and Malling Borough Council 2023-24Decided

More from Tonbridge and Malling Joint Transportation Board

All decisions
MeetingDecisionOutcome
2 Dec 2024 Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. Noted Open
2 Dec 2024 Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... Noted Open
17 Jun 2024 Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. Decided Open
21 Nov 2022 Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... Decided Open
6 Jun 2022 Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies